Why/When is Taguchi Method Appropriate?

Slides:



Advertisements
Similar presentations
Prof. Steven D.Eppinger MIT Sloan School of Management.
Advertisements

…We have a large reservoir of engineers (and scientists) with a vast background of engineering know-how. They need to learn statistical methods that can.
Robust Design – The Taguchi Philosophy
Taguchi Design of Experiments
Why/When is Taguchi Method Appropriate? A new tip Every Friday Friday, 3rd August 2001.
Why/When is Taguchi Method Appropriate? Friday, 25 th May 2001 Tip #6 Using Orthogonal Arrays for Generating Balanced Combinations of NoIsE Factors.
Fractional Factorial Designs of Experiments
Robust Design and Two-Step Optimization Lihui Shi.
Stat 321 A Taguchi Case Study Experiments to Minimize Variance.
8.1 Chapter 8 Robust Designs. 8.2 Robust Designs CS RO R Focus: A Few Primary Factors Output: Best/Robust Settings.
Robust Design (Taguchi Method)
IE 673Session 7 - Process Improvement (Continued) 1 Process Improvement (Continued)
Stat Today: Start Chapter 10. Additional Homework Question.
MAE 552 Heuristic Optimization
MAE 552 Heuristic Optimization Instructor: John Eddy Lecture #16 3/1/02 Taguchi’s Orthogonal Arrays.
TAGUCHI’S CONTRIBUTIONS TO EXPERIMENTAL DESIGN & QUALITY ENGINEERING.
Lecture 16 Today: Next day:. Two-Step Optimization Procedures Nominal the best problem: –Select the levels of the dispersion factors to minimize.
I.5 Taguchi’s Philosophy  Some Important Aspects  Loss Functions  Exploiting Nonlinearities  Examples  Taguchi - Comments and Criticisms.
Introduction to Robust Design and Use of the Taguchi Method.
MIT Objectives Review the format and expectations for the final exam Review material needed to succeed on the final exam Set the material from the course.
Why/When is Taguchi Method Appropriate? Friday, 1 st June 2001 Tip #7 Taguchi Method : When to Select a ‘larger’ OA to perform “Factorial Experiments”
Taguchi Methods Genichi Taguchi has been identified with the advent of what has come to be termed quality engineering. The goal of quality engineering.
 (Worse) It is a fact that engineers select an appropriate variable and the transformed observations are treated as though they are normally distributed.
ROBUST DESIGN.
MSE-415: B. Hawrylo Chapter 13 – Robust Design What is robust design/process/product?: A robust product (process) is one that performs as intended even.
Friday, 13 th July 2001 Of Course It is tip # 13 as well as It is Friday the 13th Why/When is Taguchi Method Appropriate?NOT.
Robust System Design Session #11 MIT Plan for the Session Quiz on Constructing Orthogonal Arrays (10 minutes) Complete some advanced topics on OAs Lecture.
Why/When is Taguchi Method Appropriate? Friday, 18 th May 2001 Tip #5 Taguchi Method Appropriate Signal-to-Noise Ratio Appropriate Signal-to-Noise Ratio.
Why/When is Taguchi Method Appropriate? A new tip Every Friday Friday, 29 th June 2001.
Why/When is Taguchi Method Appropriate? Friday, 11 th May 2001 Tip #4 design stage Robust design improves “QUALITY ” at all the life stages at the design.
Robust Design Chapter Six. Training Manual January 30, 2001 Inventory # Robust Design In this section, we will present a practical application.
Why/When is Taguchi Method Appropriate? Friday, 4 th May 2001 Tip #3 Taguchi Method Appropriate for Concurrent Engineering.
Why/When is Taguchi Method Appropriate? Tip #2 Taguchi Method Can Study Interaction between NoIsE Factors and Control Factors Friday, 27 April 2001.
X. EXPERIMENTAL DESIGN FOR QUALITY
Slide 1 Loss Function Losses begin to accrue as soon as a quality characteristic of a product or service deviates from the nominal value Under the Taguchi.
TAUCHI PHILOSOPHY SUBMITTED BY: RAKESH KUMAR ME
TAGUCHI PHILOSOPHY-- CONCEPT OF PARAMETER DESIGN &ROBUST DESIGN THREE PRODUCT DEVELOPMENT STAGES:- PRODUCT DESIGN PROCESS DESIGN PRODUCTION SOURCES OF.
Taguchi Quality Loss Function
2015 JMP Discovery Summit, San Diego
Dr. S. Poornachandra Dean – BME & EIE SNS College of Technology
Why/When is Taguchi Method Appropriate?
Nominal the best case analysis using Minitab
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Multivariate Statistics
        CALCULATING THE MATURITY DATE 1 2 CALCULATING INTEREST
April May April May June July July June August Sept August
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Maths for Signals and Systems Linear Algebra in Engineering Lecture 6, Friday 21st October 2016 DR TANIA STATHAKI READER (ASSOCIATE PROFFESOR) IN SIGNAL.
The Transformation of A Small Company Into A Golden Legend
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
WHEN IS YOUR BIRTHDAY? IT’S ON THE 5TH (FIFTH) OF MAY.
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
I.5 Taguchi’s Philosophy
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
IV.4 Signal-to-Noise Ratios
WHEN IS YOUR BIRTHDAY? IT’S ON THE 5TH (FIFTH) OF MAY.
MYplace launches in 10 days Go Live for Managers on 26th March
Why/When is Taguchi Method Appropriate?
Why/When is Taguchi Method Appropriate?
Presentation transcript:

Why/When is Taguchi Method Appropriate? A new tip Every Friday Friday, 8th June 2001

Tip #8 Taguchi Method Finds best settings to optimize TWO quality characteristics Simultaneously (next 7 slides) Friday, 8th June 2001

Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously A process has “several” quality characteristics Desirable Qualities e.g. Larger-the-Better (strength, throughput etc) or Nominal-the-Best (specified dimensions, uniformity) Undesirable properties e.g. Smaller-the-better (defects, resources - material/time, cost) Objective of Taguchi Method is to determine the best settings of Control Factors such that Desirable qualities are enhanced .and. Undesirable properties are minimized/eliminated Process becomes ROBUST i.e. insensitive to NoIsE

Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously Taguchi Method is most effective when there is at least one quality characteristic that is sensitive to variations or NoIsE Desirable Qualities e.g. “Nominal-the-Best” type are sensitive to NoIsE S/N Ratio  = 10 Log10 ( mean2 / Variance ) Undesirable properties e.g. “Smaller-the-better ” type are also sensitive to NoIsE S/N Ratio  = – 10 Log10 ( 1/n  Yi2 )  – 10 Log10 (Variance) . . . if ideal value = zero

Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously Let us use the “quality Loss” function for quality characteristics Desirable Qualities e.g. “Nominal-the-Best” Quality Loss, Qa = (Variance / mean2 ) = ( 2 / 2 ) e.g. “Larger-the-Better” Quality Loss, Qa = [ 1/n  (1/Yi2 ) ] Undesirable properties e.g. “Smaller-the-better ” Quality Loss, Qa = [ 1/n  Yi2 ]

Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously We can “minimize” the “Total quality Loss” function for TWO or more quality characteristics Total Quality Loss, Qa,total = Qa,1 + Qa,2 + . . . To obtain SN Ratio, take the Log-form of the “Total quality Loss” function SN Ratio = -10 Log [ Qa,total ] = -10 Log [ Qa,1 + Qa,2 + Qa,3 + . . . ]

Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously We can “add” the “quality Loss” functions for TWO quality characteristics, as given below Desirable Qualities e.g. TWO quality characteristics of “Nominal-the-Best” type Combined Quality Loss, Qa = ( 12 / 12 ) + ( 22 / 22 ) e.g. TWO quality characteristics of “Larger-the-Better” type Combined Quality Loss, Qa = [1/m (1/Y1j ) 2] + [1/n (1/Y2j ) 2] Undesirable properties e.g. TWO quality characteristics of “smaller-the-better” type Combined Quality Loss, Qa = [1/m (Y1j ) 2] + [1/n (Y2j ) 2]

Example : Computer Benchmarking Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously Example : Computer Benchmarking Time required for obtaining the time and date  T1 Time required for opening and closing a file  T2 Desired quality characteristics : time T1 and T2 both  “smaller-the-better” Total Quality Loss, Qa,total = [1/m (T1j ) 2] + [1/n (T2j ) 2] To obtain SN Ratio, take the Log-form of the “Total quality Loss” SN Ratio = -10 Log [ {1/m (T1j ) 2} + {1/n (T2j ) 2} ]

Example : Telecom Connectivity Taguchi Method : Finds best settings to optimize TWO quality characteristics Simultaneously Example : Telecom Connectivity Calls connected per hour on X’Mas day  C1 Calls connected per hour on Monday morning  C2 Desired quality characteristics : calls C1 and C2 both  “Larger-the-Better” Total Quality Loss, Qa,total = [1/m (1/C1j ) 2] + [1/n (1/C2j ) 2] To obtain SN Ratio, take the Log-form of the “Total quality Loss” SN Ratio = -10 Log [ {1/m (1/C1j ) 2} + {1/n (1/C2j ) 2} ] Friday, 8th June 2001

Earlier Tips Links below 7. Taguchi Method When to select a ‘Larger’ OA to perform “Factorial Experiments” Taguchi Method Using Orthogonal Arrays for Generating Balanced Combinations of NoIsE Factors 5. Taguchi Method Signal-to-Noise Ratio for Quality Characteristics approaching IDEAL value Friday, 1st June 2001 Friday, 25th May 2001 Friday, 18th May 2001 Tips 4,3,2,1 

Earlier Tips Links below Friday, 11th May 2001 Friday, 4th May 2001 Friday, 27th April 2001 Friday, 6th April 2001 4. Taguchi Method improves " quality “ at all the life stages at the design stage itself 3. Taguchi Method Appropriate for Concurrent Engineering 2. Taguchi Method can study Interaction between Noise Factors and Control Factors 1. Taguchi’s Signal-to-Noise Ratios are in Log form

More Tips Links below Tips 12, 11, 10  Taguchi Method Friday, 3rd Aug 2001 Friday, 27th July 2001 Friday, 20th July 2001 Friday, 13th July 2001 Taguchi Method 1st Priority : Variance Reduction 2nd Priority : Factor Effects 15. “inner” L9 array with “outer” L4 and L9 NoIsE arrays “inner” L18 array with “outer” L4 and L9 NoIsE arrays Taguchi Method Why/When is Taguchi Method not Appropriate? Tips 12, 11, 10 

More Tips Links below Taguchi Method Friday, 6th July 2001 Friday, 29th June 2001 Friday, 22nd June 2001 Taguchi Method “inner” L8 array with “outer” L4 and L9 NoIsE arrays Useful at ALL Life-stages of a Process or Product Performs Process “centering” or “fine tuning” Tips 9, 8, 7 

More Tips Links below Tips 6, 5, 4  Taguchi Method Identifies the “right” NoIsE factor(s) for Tolerance Design Taguchi Method Finds best settings to optimize TWO quality characteristics Simultaneously 7. Taguchi Method When to select a ‘Larger’ OA to perform “Factorial Experiments” Friday, 15th June 2001 Friday, 8th June 2001 Friday, 1st June 2001 Tips 6, 5, 4 

More Tips Links below Tips 3, 2, 1  Friday, 25th May 2001 Friday, 18th May 2001 Friday, 11th May 2001 Taguchi Method Using Orthogonal Arrays for Generating Balanced Combinations of NoIsE Factors Taguchi Method Signal-to-Noise Ratio for Quality Characteristics approaching IDEAL value 4. Taguchi Method improves " quality “ at all the life stages at the design stage itself Tips 3, 2, 1 

More Tips Links below Friday, 4th May 2001 Friday, 27th April 2001 Friday, 6th April 2001 3. Taguchi Method Appropriate for Concurrent Engineering 2. Taguchi Method can study Interaction between Noise Factors and Control Factors 1. Taguchi’s Signal-to-Noise Ratios are in Log form

end