University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration.

Slides:



Advertisements
Similar presentations
EPITA IT Markets Basic Finance and Marketing
Advertisements

DART Orange Line Project Update and Development Opportunities
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 Welcome to this Seminar for Board Members. 2 Board Members and Staff – Sharing of Responsibilities Voluntary Organisations and Volunteers Responsibilities.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 DPAS II Process and Procedures for Teachers Developed by: Delaware Department of Education.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Targeted Assistance & Schoolwide Programs NCLB Technical Assistance Audio April 18, :30 PM April 19, :30 AM Alaska Department of Education.
1 Solicitations/Advertisements Solicitations/Advertisements
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
University of Houston University of HoustonHUB/MWBE Construction Related Professional Services Networking Event Construction Related Professional Services.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) FAR.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
1. 2 Objectives Become familiar with the purpose and features of Epsilen Learn to navigate the Epsilen environment Develop a professional ePortfolio on.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Town Hall Presentation January 9-10, 2002 Curtis Powell Vice President for Human Resources The Division of Human Resources and William M. Mercer, Incorporated.
University ofHouston University of Houston BOARD OF REGENTS MEETING MAY 17, 2007 POSSESSION OF PORTIONS OF CULLEN & HOLMAN.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
1 Pricing your Product or Service Florida Gulf Coast University Small Business Development Center Procurement Technical Assistance Center
VOORBLAD.
July 31, Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Successful Proposal Writing.
Middle School 8 period day. Rationale Low performing academic scores on Texas Assessment of Knowledge and Skills (TAKS) - specifically in mathematics.
Promoting Regulatory Excellence Self Assessment & Physiotherapy: the Ontario Model Jan Robinson, Registrar & CEO, College of Physiotherapists of Ontario.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
1 The new government has to develop a systematic campaign to contact: 1) Regional and communal associations abroad and in Haiti. Communities can participate.
25 seconds left…...
1 DEVELOPMENT SERVICES FY Projects Completed in FY
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
CAPITAL PROGRAM OVERVIEW
Presentation transcript:

University of Houston First Annual HUB/MWBE Construction Networking Event July 24, 2007 Presenter: Dave Irvin Vice Chancellor for Finance & Administration Vice President Plant Operations

2 Outline 1.UH System Campuses 2.Plant Operations Website 3.Advertising of Projects 4.HUB (MBE, WBE, DBE) Participation 5.Contractors 6.Delivery Methods 7.Professional Services 8.Selection Process 9.Campus Master Plan 10.Recently Completed Projects 11.Current Projects 12.Upcoming Projects

3 UH-System Groups

4 Plant Operations Website

5 Advertising of Projects Advertisements for design services, contractors and other services are posted on the Texas Market Place which is a part of the Texas Building and Procurement website. The website address is On the pull down menu, select : University of Houston 730 for the Main campus University of Houston – Clear Lake 759 University of Houston – System 783 University of Houston – Downtown 784 or University of Houston – Victoria 765 The Texas Market Place is a bid website for all of the Texas state agencies.

6 HUB Participation The University has a goal of 40% HUB participation on all construction projects and a HUB mix that reflects the cultural diversity of our city. The University can provide assistance with getting state HUB certification, however certification is not required. We accept certifications of other state and local agencies. Outreach to HUB contractors, vendors and professional service providers is made through contact with HUB professional organizations, plan rooms and special events.

7 Upcoming Special HUB Event A special HUB/MWBE networking event targeting architects, engineers and other construction related consultants will take place in October at the UH Hilton Hotel located on the Main campus. The date is still to be determined. Opportunities to work on future projects will be discussed.

8 HUB Participation Contacts Dilip Anketell Executive Director Facilities Planning & Construction Allison E. Bell Director of Capital Projects Administration Facilities Planning & Construction William P. McKinney HUB Project Manager Facilities Planning & Construction Diedra Sutton Consultant Procurement Technical Assistance Center UH Small Business Development Center Sandra Webb HUB Program Manager UH Main Campus

9 Job Order Contractor Program UH uses JOCs to complete projects under $1,000,000. Projects generally range in size from a few thousand to a few hundred thousand dollars. Some JOCs are used as general contractors and other are for special projects only. Contracts are issued on a 1-year basis with an option for renewal for an additional year. We currently have 9 general JOCS and 3 specialty JOCs.

10 Delivery Methods Design Build Design – Bid – Build (Traditional) CM Risk

11 Contractors for Major Projects Design/Build The contractor/design firm is chosen by a two step RFQ then RFP process. Design – Bid – Build Competitive Sealed Proposal The contractor is chosen using a best value method based on published criteria and on its ranking evaluation. Construction Manager at Risk The contractor may be chosen by a two step RFQ then RFP process OR by a one step RFP process.

12 A/E and Other Professional Services for Minor Projects The several design firms are chosen by an RFQ process. As projects become available, firms are chosen from an approved list as needed.

13 A/E and Other Professional Services for Major Projects Design/Build The contractor/design firm is chosen by a two step RFQ then RFP process. Other Delivery Methods The design firm is chosen by an RFQ.

14 Selection Process The criteria for selection are included in each RFQ or RFP. A committee of FPC staff reviews the submissions and makes recommendations to a project building committee. The project building committee interviews a short-listed group of responders and forwards its recommendations to the Vice Chancellor.

15 Campus Framework Plan A link to the framework plan is on the Plant Operations website. These items can be viewed from there. UH Framework Plan Lecture Hall Presentation Calhoun Lofts Presentation Framework Plan Update BOR Approved Framework Plan Framework Plan Executive Summary Video Presentation

16

17 Open Space

18 Open Space Framework Preserve and enhance the existing Open Space Framework of courtyards, lawns, and groves Respect and extend pedestrian corridors and paths to enhance wayfinding Utilize existing courtyard scale to develop new campus places Link the University with the surrounding neighborhood Extend the Brays Bayou Park System into the campus Continue Lighting/Security Program

19 Transportation Framework Develop a loop road connecting Calhoun Road and Elgin Street Extend the campus core by closing Cullen Boulevard Accommodate growth through conveniently located parking structures Integrate Metro Light Rail, BRT, and buses into campus with an inter-modal station on Scott Street Incorporate the University Shuttle to link all transportation framework elements

20 Parking Garage Data

21 Development Framework Increase on-campus residential population to 24% and distribute across campus Allow for growth to 41,000 students and 12.2M SF Provide limited infill opportunities integrated in the inner campus core Develop four perimeter precincts for current and future initiatives Construct mixed use development unique to each precinct

22 Arts Precinct

23 Professional Precinct

24 Wheeler Precinct

25 Stadium Precinct Garage 2 Garage 1

26 Recently Completed Projects UH Main Welcome Center & Parking Garage (2006) Bayou Oaks Student Housing Expansion (2006) Bayou Oaks Student Housing (2005) Science & Engineering Building (2005) M.D. Anderson Library Expansion (2004) Cullen Oaks Student Housing (2004) UH Downtown Commerce Street Building (2004) Academic Building & Garage (2007) UH Clear Lake Student Services & Classroom Building (2004)

27 Recent major projects Recently Completed Projects

28 Current Projects UH Sugar Land – Academic Building Architect: Archi*Technics/3 + PageSoutherlandPage Contractor: Skanska USA Building $35M Expected construction start – September 2007 UH Main – Calhoun Lofts Design/Build - Pepper Lawson & Kirksey $100M Expected construction start – September 2007 UH Main – Cemo Lecture Hall & Academic Center Architect: RFQ responses due August 15, 2007 Contractor: RFQ will be posted in August $9M Expected construction start – TBD

29 Current Projects

Upcoming Major Projects UH Main Campus Renovation to Science Buildings - $57.6M New Art Museum - $16M Parking Garage - $12M UH Victoria Economic Coalition – $8M Allied Health - $2M UH Clear Lake Renovation of Arbor Building – $11.5 M Pearland Campus – $10.8 M

Potential Major Projects UH Main Engineering Building Optometry Addition College of Business Addition Music Building Cougar Walk Scott Place UH Victoria Economic Coalition Allied Health UH Clear Lake Renovation of Arbor Building Pearland Campus UH Sugar Land Economic Development Building

32 Facilities Planning & Construction, better known as FPC, is located at 4211 Elgin on the second floor of the General Services Building.

33 Questions ?