Mod 09_19 - Removal of locational constraints from Imbalance Pricing

Slides:



Advertisements
Similar presentations
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Advertisements

Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
EFRAG’s preliminary position on the IASB Supplementary Document Financial Instruments: Impairment Draft comment letter 28 February 2011.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
T&SC Modification Proposal: Clarification of Outturn Availability
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
EFRAG’s preliminary position on the IASB Supplementary Document Financial Instruments: Impairment Draft comment letter 28 February 2011.
Current FRRS Language & Explanation of Posted Data
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Supply Point Register 10th January 2012
Sourcing Event Tool Kit Multiline Sourcing, Market Baskets and Bundles
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Draft for factual comments, suggestions on overlaps welcome.
Review Group 291- Ofgem Update
Topic 9 Reporting financial performance
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Proposed response to 3GPP ED request
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
TSC Modifications Panel Meeting
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Market Design in New England
Update to Unit Under Test Process
Redefinition of Schedule Production Cost
Chapter 18: Non-Firm Quantities
Summer Peak Energy Pricing in New England: The ISO-NE Response
Consideration of issues raised by UNC Modification Proposal 0244
Mod_07_18 – Variable b The formulas used to calculate NIV and PAR tags in the rules rely on determining values for b (the rank of a particular action)
Mod_07_18 – Variable b The formulas used to calculate NIV and PAR tags rely on determining values for b (the rank of a particular action) and beta (the.
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Imbalance Price Modifications
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Credit Cover Signage and Subscript Correction
Review Group 291- Ofgem Update
Determining Marginal Energy Action Prices Modification Proposal
Summary Issue Modification Aim Effect of the mod Impacts
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Consideration of issues raised by UNC Modification Proposal 0244
Entry Overrun Calculation
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
Imbalance Price Modifications
Mod_06_18 – PMEA Theoretically there should always be at least one Bid Offer Acceptance (BOA) Quantity which is unflagged and is therefore the Marginal.
Mod_32_18 Working Group 2 Dublin, 13 March 2019.
Determining Marginal Energy Action Prices Modification Proposal
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Correction to No Load Cost - “and” vs “or”
Interconnector trading in SEM 7th June 2007
Market Pricing Initiatives Update September 9th, 2003
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
Captured Carbon Renewable Energy Route to Market Consultancy Trading.
Capacity Access Review
Presentation transcript:

Mod 09_19 - Removal of locational constraints from Imbalance Pricing After extreme imbalance prices observed on January 24th, SEMO undertook to compile a report on the drivers behind the event; After publication of the report and presentation to industry at a Market Operator Single Topic (MOST) meeting, SEMO began a review of the findings of the report to consider potential changes; Working with SEM RAs and TSOs taking account of feedback, a number of areas were identified for further consideration Design Item Impact of locational constraints on imbalance pricing Units required by TSOs for system reasons not being flagged due to being available to provide energy balancing. Application of Difference Charges on RO holders when they are not on Application of SO flagging PAR is not applied when the PMEA is applied. Participants simple bidding is not subject to any regulation

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Design Item Option Impact of locational constraints on imbalance pricing Consider if locational constraints can be removed from imbalance pricing calculation Consider if locational constraints can be added to ex-ante markets to allow participants respond to signals Introduce the concept of a notional reference node – a point on the system where generators must be able to provide balancing energy. This can be implemented by removing a subset of MW / MWR constraints from the pricing implementation Units required by TSOs for system reasons not being flagged due to being available to provide energy balancing. Add a new constraint to TSO scheduling tools and thereby into pricing tools that would ensure the units are always SO flagged. Change flagging rules to apply an SO flag to all QBOAs on a unit when the unit is synchronised for system reasons Application of Difference Charges on RO holders when they are not on Extend the conditions where an RO holder is excused from Difference Charges beyond the Replacement Reserve requirement to include other SO flags. Application of SO flagging Switch to simple NIV tagging. Switch to simple NIV tagging during alerts PAR is not applied when the PMEA is applied. Change the implementation to ensure that PAR is applied regardless of whether PMEA is used as a replacement Bid / Offer Price Participants simple bidding is not subject to any regulation Apply the BMPCOP / BCOP rules to simple commercial offer data as well as to complex.

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Of these approaches, immediate focus on options that could be implemented quickly (i.e., through system configuration); Option “Application of Difference Charges on RO holders when they are not on” already subject to T&SC modification, so not considered further as part of our review; Of remaining considerations (“Application of SO flagging” and “Impact of locational constraints on imbalance pricing”), report on Jan 24th strongly indicates the impact of locational constraints on the calculation of the imbalance price; Considering the options for addressing locational constraints – Consider if locational constraints can be removed from imbalance pricing calculation Consider if locational constraints can be added to ex-ante markets Introduce the concept of a notional reference node Second and third approaches discounted in our review

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Options based on this work were presented to the SEMC at their last meeting and they endorsed the approach set out in the modification; Modification proposed seeks to remove the application of flagging for locational constraints from imbalance pricing; As only some locational constraints are modelled through TCGs, this means only a subset of locational constraints are actually flagged; Removal of those explicitly modelled applies rules in a consistent manner; Additional impacts? Overall impact on imbalance prices?

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Half hour Imbalance Settlement Price for Jan 24th

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Five minute Imbalance Price for Jan 24th

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Scatter graphs of NIV and PIMB for original and with no MW Constraints flagged

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Options based on this work were presented to the SEMC at their last meeting and they endorsed the approach set out in the modification; Modification proposed seeks to remove the application of flagging for locational constraints from imbalance pricing; As only some locational constraints are modelled through TCGs, this means only a subset of locational constraints are actually flagged; Removal of those explicitly modelled applies rules in a consistent manner; Additional impacts? Overall impact on imbalance prices? Does not remove all high prices seen since the transition to the new arrangements…

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Half hour Imbalance Settlement Price for Oct 3rd… Half hour Imbalance Settlement Price for Oct 9th …

Mod 09_19 - Removal of locational constraints from Imbalance Pricing Options based on this work were presented to the SEMC at their last meeting and they endorsed the approach set out in the modification; Modification proposed seeks to remove the application of flagging for locational constraints from imbalance pricing; As only some locational constraints are modelled through TCGs, this means only a subset of locational constraints are actually flagged; Removal of those explicitly modelled applies rules in a consistent manner; Additional impacts? Overall impact on imbalance prices? Does not remove all high prices seen since the transition to the new arrangements… Impact on Dispatch Balancing Costs – cash-out has to go somewhere

Mod 09_19 - Removal of locational constraints from Imbalance Pricing This modification can be considered as a step on the road to refining imbalance price calculation for the I-SEM Further modifications may come to deal with other issues (e.g., those requiring vendor system changes) This proposal is not a stand-alone solution; however, it should be considered on its own merit and not in the context of further modifications still to come For now, we chose to raise this following internal discussions, feedback from participants on the report on Jan 24th, etc. Putting this modification through removes the risk that local constraints can drive the price across the island There may be other issues to solve with other modifications