Correction to No Load Cost - “and” vs “or”

Slides:



Advertisements
Similar presentations
Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
Advertisements

ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
1 Mod_24_10 Introducing Loss of Profits as a Relevant Damage within the Limitation of Liability Provisions.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Global Aggregation Working Group 15 th September 2010.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
INTRA-DAY TRADING Modification Development 5 April 2011.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Audit findings 2008/09 Financial Year. 2 Presentation Structure  Background  Areas of Improvement.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Pricing Decisions and Cost Management
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
TSC Modifications Panel Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA
Agreed Procedure Updates
Correction of Minor Material Drafting Errors
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Net Inter Jurisdictional Import Submission
Review of the requirements regarding Unsecured Bad Debt within I-SEM
MOD_23_18 Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover 16th August 2018.
Update to Unit Under Test Process
Redefinition of Schedule Production Cost
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Chapter 18: Non-Firm Quantities
7th July 2011 Transmission Workgroup - Elexon
Ex Ante Quantities Deferral
MOD_27_18 Martin Kerin 06th September 2018
Notification of Suspension to SEM NEMOs
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Paragraph 14 Table 2: Mod_15_18 – IP/QBOA
Definition of “Day 2 Deployment Date” Mod-11-17
Interim Suspension Delay Periods
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Imbalance Price Modifications
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Credit Cover Signage and Subscript Correction
Mod_37_18 Housekeeping 12th December 2018.
Capacity Market Code Modifications
Summary Issue Modification Aim Effect of the mod Impacts
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Entry Overrun Calculation
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Imbalance Price Modifications
Mod_06_18 – PMEA Theoretically there should always be at least one Bid Offer Acceptance (BOA) Quantity which is unflagged and is therefore the Marginal.
Mod_32_18 Working Group 2 Dublin, 13 March 2019.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
Long Term Consumption Adjustments
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
Correction to COP and clarification to CNLR
Captured Carbon Renewable Energy Route to Market Consultancy Trading.
Market Back Up Price Reference Corrections
Samples of Credit Cover data
Capacity Market Code Modifications
Presentation transcript:

Correction to No Load Cost - “and” vs “or” MOD_07_19 Correction to No Load Cost - “and” vs “or” 11th April 2019 Katia Compagnoni

Summary Information Mod_17_19 seeks to address an error in the T&SC Part B, paragraph F.11.2.3, that has affected the calculation of No Load Costs; This was caused by an oversight in the drafting of the legal text; The error lead to an overestimation of No Load Costs for the purpose of the calculation of weekly Make Whole Payments; The impact to date has been masked by a number of issues on that and other related calculations; SEMO is of the view that this error should be rectified as soon as possible to contain the impact on Participants and consumers. Quick summary of the background and expected outcome for this proposal

Legal Drafting F.11.2.3 The Market Operator shall determine all No Load Costs (CNLuγ) payable for each Generator Unit, u, in each Imbalance Settlement Period, γ, as follows: (a) CNLuγ shall have a value of zero for each Imbalance Settlement Period, γ, falling wholly within the Period of Physical Operation or in which the Period of Physical Operation starts or ends, where: (i) The Final Physical Notification Quantity (qFPNuγ(t)) for the Generator Unit, u, has a non-zero value for any time within that Imbalance Settlement Period; and or (ii) The Metered Quantity (QMuγ) for the Generator Unit, u, has a value of zero for that Imbalance Settlement Period, γ. (b) In all circumstances not listed in paragraph F.11.2.3(a): (i) Where, in accordance with section F.3.3, Complex Bid Offer Data is to be used in respect of the first Bid Offer Acceptance, o, in an Imbalance Settlement Period, γ, falling wholly within the Period of Physical Operation, or in which the Period of Physical Operation starts or ends, CNLuγ shall have a value equal to the No Load Cost submitted in accordance with Chapter D (Balancing Market Data Submission) for the Generator Unit as part of the applicable Complex Bid Offer Data, multiplied by the Imbalance Settlement Period Duration (DISP); and (ii) Where, in accordance with section F.3.3, Simple Bid Offer Data is to be used in respect of the first Bid Offer Acceptance, o, in an Imbalance Settlement Period, γ, falling wholly within the Period of Physical Operation, or in which the Period of Physical Operation starts or ends, CNLuγ shall have a value of zero.

Justifications for Mod_07_19 Since the logical connector is “and” in between the conditions, both provisions must be true to allow No Load Cost to be set to zero. However the original market design intention was that if either conditions (i) or (ii) are met, then the No Load Cost will be set to zero. Extract from the ‘Imbalance Settlement Plain English Document’ : “The following tests will determine if no-load costs should be deemed relevant for the balancing market: No-load costs will not be incurred in any settlement period within the period for fixed cost relevance where the FPN profile is present. If Trade in the Opposite Direction to the TSO were to extend to start and no-load considerations, this part of the test can be extended to also consider the PN at the time the BOA was accepted; No-load costs will not be incurred in any settlement period within the period for fixed cost relevance where the metered quantity for that period is zero as the unit generating will be deemed undelivered; Otherwise, no-load costs are relevant and will be recovered in the balancing market.”

Justifications for Mod_07_19 (2) The logic behind each test is as follow: “(i) The Final Physical Notification Quantity (qFPNuγ(t)) for the Generator Unit, u, has a non-zero value for any time within that Imbalance Settlement Period” : this refers to instances where FPNs other than zero, denote an Ex-Ante Market position, therefore the Generator recovers costs in Ex-Ante; “(ii) The Metered Quantity (QMuγ) for the Generator Unit, u, has a value of zero for that Imbalance Settlement Period, γ.” : this refers to instances where the Generator did not incur the costs and therefore it is not entitled to recover them; There is no requirement for the two tests to happen at the same time; each one is independent from the other;

Justifications for Mod_07_19 (3) The error only affects sub-paragraph (a) of F.11.2.3; In sub-paragraph (b), criteria (i) and (ii) are clearly meant to be separate circumstances in line with the design; This is because the same outcome cannot be happening in both cases: the first BOA cannot use Complex COD, and Simple COD at the same time; The condition and the outcome are explicitly stated in each sentence; Still SEMO will, in due course, review similar constructions throughout the T≻

Legal Drafting F.11.2.3 The Market Operator shall determine all No Load Costs (CNLuγ) payable for each Generator Unit, u, in each Imbalance Settlement Period, γ, as follows: (a) CNLuγ shall have a value of zero for each Imbalance Settlement Period, γ, falling wholly within the Period of Physical Operation or in which the Period of Physical Operation starts or ends, where: (i) The Final Physical Notification Quantity (qFPNuγ(t)) for the Generator Unit, u, has a non-zero value for any time within that Imbalance Settlement Period; and or (ii) The Metered Quantity (QMuγ) for the Generator Unit, u, has a value of zero for that Imbalance Settlement Period, γ. (b) In all circumstances not listed in paragraph F.11.2.3(a): (i) Where, in accordance with section F.3.3, Complex Bid Offer Data is to be used in respect of the first Bid Offer Acceptance, o, in an Imbalance Settlement Period, γ, falling wholly within the Period of Physical Operation, or in which the Period of Physical Operation starts or ends, CNLuγ shall have a value equal to the No Load Cost submitted in accordance with Chapter D (Balancing Market Data Submission) for the Generator Unit as part of the applicable Complex Bid Offer Data, multiplied by the Imbalance Settlement Period Duration (DISP); and (ii) Where, in accordance with section F.3.3, Simple Bid Offer Data is to be used in respect of the first Bid Offer Acceptance, o, in an Imbalance Settlement Period, γ, falling wholly within the Period of Physical Operation, or in which the Period of Physical Operation starts or ends, CNLuγ shall have a value of zero. In sub paragraph (b) condition and outcome in the same sentence

Example of Existing and Proposed Outcome Estimated materiality on Fixed Cost Charge (CFC) of both Mod_34_18 and Mod_07_19 :

Implications of not Implementing Mod_07_19 By not implementing this modification, No Load Costs will continue to be overstated and recovered inappropriately; Additional burden will be placed on Dispatch Balancing Cost and therefore passed onto Imperfection Charges and ultimately the consumers; SEMO is of the opinion that this change should be made effective from the earliest date possible, after the RAs decision (if indeed approved); Although retroactive implementation is normally not an option, in this case this cost was effectively not calculated until the System deployment of the 29th January 2019; it could be considered to avoid large overpayments expected in M+4;

Example of Existing and Proposed Outcome Estimated materiality on Fixed Cost Charge (CFC) of Mod_07_19 before the system deployment on the 29th Jan 2019:

Further Considerations SEMO is looking into adding functionalities to the CFC template developed following Mod_34_18, in order to aid PTs in managing differences in revenue; SEMO is aware of another potential issue affecting F.11.3.1 (a) (ii) for which a separate Modification will be raised in due course; This is not expected to be of high materiality and will only occur in limited circumstances.