SPL-SB and NF Beam Window Studies Stress Analysis

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
EUROnu Beam Window Studies Stress and Cooling Analysis Matt Rooney, Tristan Davenne, Chris Densham Strasbourg June 2010.
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
KT McDonald Target Studies Weekly Meeting July 10, Power Deposition in Graphite Targets of Various Radii K.T. McDonald, J. Back, N. Souchlas July.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
Thermal Shock Measurements and Modelling for Solid High-Power Targets at High Temperatures J. R. J. Bennett 1, G. Skoro 2, J. Back 3, S. Brooks 1, R. Brownsword.
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Megawatt targets (and horn) for Neutrino Super-Beams RAL High Power Targets Group: Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt Rooney,
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
T2K Target & Secondary Beamline - progress towards a neutrino Superbeam? Chris Densham.
LS-DYNA Simulations of Thermal Shock in Solids Goran Skoro University of Sheffield.
Simulations of Pressure Waves induced by Proton Pulses In search of the answer to the fundamental question: are materials indeed stronger than what we.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta Chris Densham STFC Rutherford Appleton Laboratory, UK 1 st joint meeting of EUROnu WP2 (Superbeam)
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Target Options for a Neutrino Factory Chris Densham, Otto Caretta, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt Rooney Sept. 20, 2011.
Packed Bed Target for Euronu DAVENNE, Tristan (RAL) ; LOVERIDGE, Peter (RAL) ; CARETTA, Ottone (RAL) ; DENSHAM, Chris (RAL) ; ZITO, Marco (CEA Saclay)
Megawatt target studies for Neutrino Super-Beams RAL High Power Targets Group: Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Otto Caretta,
Awake CNGS Window and Shutter Szymon Sroka, Antonio Perillo-Marcone — EN/STI/TCD Thermo-Mechanical Calculations.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Proton Accelerators for Science and Innovation Workshop at Fermilab
A new design for the CERN to Fréjus neutrino beam Marco Zito (IRFU/CEA-Saclay) For the EUROnu WP2 team NUFACT11 Geneva August 2nd 2011.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
1 cm diameter tungsten target Goran Skoro University of Sheffield.
BNL Neutrino Long Baseline Neutrino Initiative N. Simos, BNL NWG Baseline = 2540 Km Homestake.
Study of a new high power spallation target concept
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.
Summary Why consider a packed bed as a high power target?
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Reducing shock in the Neutrino Factory target Goran Skoro (University of Sheffield) UKNF Meeting 11 January 2006.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
E951 Experiment Target Response Re-evaluation N. Simos, H. Kirk, P. Thieberger Brookhaven National Laboratory K. McDonald Princeton University.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Megawatt targets for Neutrino Super-Beams (Apr. 4, 2013) RAL High Power Targets Group: Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Shock Tests on Tantalum and Tungsten J. R. J. Bennett, S. Brooks, R. Brownsword, C. Densham, R. Edgecock, S. Gray, A. McFarland, G. Skoro and D. Wilkins.
High Intensity Beam Test of Beryllium for Target and Beam Window Applications Presented by: Brian Hartsell Contributors: Kavin Ammigan, Patrick Hurh NBI.
Target/Horn Station for ESS ν SB Nikolaos Vassilopoulos IPHC/CNRS.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
Target/Horn Station for ESS ν SB Nikolaos Vassilopoulos IPHC/CNRS.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
ENG/BENE, ENG Plenary, 16 March 2005 The New UK Programme for Shock Studies J R J Bennett RAL.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
DUNE/LBNF Target Studies: Physics John Back University of Warwick 12 th April
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Irradiated T2K Ti alloy materials test plans
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Skeleton contributions to targets section
Tungsten Powder Test at HiRadMat Scientific Motivation
Peter Loveridge High Power Targets Group
Beam Window Studies for Superbeams
WP2 (SuperBeam) Targets Status of Work Programme
Thermo-mechanical simulations jaws + tank
EUROnu Beam Window Studies Stress and Cooling Analysis
Superbeam Horn-Target Integration
Presentation transcript:

SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010

Variables studied Beam parameters: Power: 4 MW (Divided as1 MW each for four targets/windows) Energy: 5 GeV 1.5 x 1014 protons per pulse Frequency: 12.5 Hz Pulse length: 5 microseconds Beam sigma: 4 mm Design considerations: Materials: Beryllium (S65C), Titanium alloy (Ti-6Al-4V) Cooling methods: direct forced convection helium and circumferential water Beam parameters taken from EUROnu WP2 Note 09-11 Matt Rooney, March 2010

Typical ANSYS model showing cooling options ANSYS Multiphysics v11 used with coupled field elements (axisymmetric model) Matt Rooney, March 2010

Energy deposition profile NOTE: Data produced by Tristan Davenne (RAL) using Fluka. A Gaussian approximation of this data has been used in ANSYS for simplicity. Matt Rooney, March 2010

Helium cooled Ti-6Al-4V window (like T2K) is not an option 50 pulses (4 seconds) 0.25 mm thick titanium alloy window Direct helium cooling (assumes 1000 W/m2K) Peak stress of 500 MPa is above yield stress for titanium at 800°C. Matt Rooney, March 2010

Circumferentially water cooled beryllium window 0.25 mm thick beryllium window Circumferentially water cooled (assumes 2000 W/m2K) Max temp ~ 180 °C Max stress ~ 50 MPa (yield ~ 270 MPa) Acceptable! Matt Rooney, March 2010

High velocity helium cooled beryllium window 0.25 mm thick beryllium window Direct helium cooling (assumes 1000 W/m2K) Max temp 109 °C Max stress 39 Mpa Better! Matt Rooney, March 2010

‘Shock’ stress due to single pulse in beryllium window Temp jump of 22°C results in 50 MPa peak stress giving a safety factor of around 4-5. Matt Rooney, March 2010

4 MW window for neutrino factory? 50 pulses (1 second) Yield strength of beryllium @ 260°C is around 200 MPa. This leaves a safety factor of about 2 for a beryllium neutrino factory window with these beam parameters. Matt Rooney, March 2010

Conclusions High frequency beam makes cooling the main challenge for any window. Actual thermal stress due to each pulse is within acceptable limits. Difficulty in cooling a titanium window makes this a bad choice for SPL beam parameters. High frequency beam with low protons per pulse makes beryllium window a possibility due to its high thermal conductivity. Either direct helium cooling on the beam spot or circumferential water cooling may be feasible. Neutrino factory window may be possible with this beam parameters, though safety factor is small and radiation damage would quickly become an issue. Matt Rooney, March 2010