Submission Title: [TG4e Opening Report for November 2011 Session]

Slides:



Advertisements
Similar presentations
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4e Closing Report for September.
Advertisements

Doc.: IEEE /0075r0 Report Nov 2011 Jon Rosdahl, CSRSlide 1 First Vice Chair Report 2011 Date: Authors:
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4r Opening and Closing for.
Submission Title: [TG4e Closing Report for July 2011 Session]
<month year> doc.: IEEE < e> <Mar 2011>
Submission Title: [TG4e Closing Report for November 2011 Session]
IEEE ah Sub 1 GHz license-exempt operation Agenda for July 2014
Month Year doc.: IEEE /0xxxr0 January 2014
Instructions for the WG Chair
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
<month year> <September 2018>
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, Jan 2015.
Instructions for the WG Chair
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda May 2018 Interim] Date Submitted:
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda November 2018 Plenary]
doc.: IEEE <doc#>
Sept 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for IEEE q (ULP) Task Group,
<month year> doc.: IEEE < e> <May 2010>
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
< Sept > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Opening and Closing Report Sep.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4e Closing Report for San Diego July2010.
July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, July 2015.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
Instructions for the WG Chair
May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, May 2015 Meeting.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Interest Group ELR Opening Report.
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Opening Report for July 2018.
Instructions for the WG Chair
<month year> <November 2018>
<month year> <July 2018>
Sub 1 GHz license-exempt operation Agenda for September 2010
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2018 Plenary] Date Submitted:
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Interest Group ELR Opening Report.
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda January 2019 Interim] Date.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Study Group EIR Opening Report.
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda March 2019 Plenary] Date.
Submission Title: TG4r November 2014 opening and session outline
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
doc.: IEEE <doc#>
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2019 Interim] Date Submitted:
March 2018 Project: IEEE P MD
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2019 Interim] Date Submitted:
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4t (Higher Rate) Opening.
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2019 Interim] Date Submitted:
<month year> <January 2019>
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4t (Higher Rate) Opening.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4z EIR Opening Report for May.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Study Group EIR Opening Report.
TGac – Coexistence Ad Hoc Meeting #3
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda May 2018 Interim] Date Submitted:
Submission Title: [TG4e Opening Report for September 2011 Session]
Submission Title: [15.4k LECIM Opening Report for Singapore 2011]
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for TG w May 2019 Interim Meeting]
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda July 2019 Plenary] Date.
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2019 Plenary] Date Submitted:
Submission Title: TG9ma Opening Report for July Meeting
March 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for March 2012]
Submission Title: IG SEC Opening Report for July 2014 Session
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
Submission Title: TG9ma Opening Report for September Meeting
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
Submission Title: TG9ma Opening Report for September Meeting
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda September 2019 Interim]
Presentation transcript:

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4e Opening Report for November 2011 Session] Date Submitted: [5 November 2011] Source: [Seong-Soon Joo] Company [ETRI] Address [Gajung-Ro 161, Yusong-Gu, Taejon, KOREA] Voice:[+82.42.860,6333], E-Mail:[ssjoo@etri.re.kr] Re: [TG4e Opening Report for November 2011 Session] Abstract: [Opening Report for the TG4e Session in November 2011] Purpose: [Amendments to IEEE 802.15.4 MAC] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

Scope of Proposed Standard TG4e PAR Scope of Proposed Standard The intention of this amendment is to enhance and add functionality to the 802.15.4-2006 MAC to a) better support the industrial markets and b) permit compatibility with modifications being proposed within the Chinese WPAN. Specifically, the MAC enhancements are limited to: TDMA: to provide a) determinism, b) enhanced utilization of bandwidth Channel Hopping: to provide additional robustness in high interfering environments and enhance coexistence with other wireless networks GTS: to increase its flexibility such as a) supporting peer to peer, b) the length of the slot, and c) number of slots CSMA: to improve throughput and reduce energy consumption Security: to add support for additional options such as asymmetrical keys Low latency: to reduce end to end delivery time such as needed for control applications

Purpose of Proposed Standard TG4e-PAR Purpose of Proposed Standard This functionality facilitates Industrial applications (such as addressed by HART 7 and the ISA100 proposed standards), and those enhancements defined by the proposed Chinese WPAN standard that aren't included in TG4c. This amendment addresses coexistence with wireless protocols such as 802.11, 802.15.1, 802.15.3, and 802.15.4.

Meeting Goals Review results from Sponsor Ballot Recirc-2 Review comments from Sponsor Ballot Recirc-2 Resolve Sponsor Ballot Recirc-2 comments Edit draft as per comment resolution Discuss next step

TG4e Meetings This Week

Instructions for the WG Chair <month year> doc.: IEEE 802.15-<15-09-0758-00-004e> The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual 6.3.5 and in FAQs 12 and 12a on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. 6

Participants, Patents, and Duty to Inform <month year> doc.: IEEE 802.15-<15-09-0758-00-004e> Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search Slide #1 Slide 7 <Seong-Soon Joo>, <ETRI> 7

Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws http://standards.ieee.org/guides/bylaws/sect6-7.html#6 IEEE-SA Standards Board Operations Manual http://standards.ieee.org/guides/opman/sect6.html#6.3 Material about the patent policy is available at http://standards.ieee.org/board/pat/pat-material.html If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/board/pat/index.html This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt Slide #2

Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Slide #3

Other Guidelines for IEEE WG Meetings <month year> doc.: IEEE 802.15-<15-09-0758-00-004e> Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. --------------------------------------------------------------- See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Slide #4 10

TG4e Officers Chair: Seong-Soon Joo Vice Chair: TBD Secretary: TBD Technical Editing Chief Editor: Ludwig Winkel Liang Li, Wun-Cheol Jeong, Jonathan Simon, Ben Rolfe Ballot Resolution Committee: Seong-Soon Joo Pat Kinney (chair) Ludwig Winkel Wei Hong Jeff King Wun-Cheol Jeong Chang Sub Shin Ben Rolfe Yang Yang Myung Lee Jonathan Simon Kazuyuki Yasukawa

802.15.4 MAC Pictorial Factory Automation ISA, HCF Contention-Free nonbeacon-enabled PAN beacon-enabled PAN E-GTS TDMA Contention Access Contention-Free Factory Automation ISA, HCF ZigBee, 802.15.5 Overhead Reduction/Security Low Energy Channel Diversity Blink frames (RFID) Red Existing Users Blue TG4e adds Black Informational

Sponsor Ballot Recirculation #1 Results <Mar 2011> Sponsor Ballot Recirculation #1 Results ballot closed on 24 Oct. 166 votes: 92% response 155 affirmative votes: 98% affirmation 3 negative votes 8 abstention votes: 4% abstention 68 comments, 56 marked as must be satisfied comments doc 576-11, revised to D08 <Pat Kinney>, <Kinney Consulting LLC>

Sponsor Ballot Results November 2011 Sponsor Ballot Results Voters     180 (original LB60 pool) Voted      160 (93%) Yes         158 (98%) No           2 (2%) Abstain     8 (4%) Comments     4 (T: 1, E: 1, G:2)

Technical Editing Path Forward <Mar 2011> Technical Editing Path Forward Categorize comments as per team Categorize comments as per strategy More information from commenter needed Out of scope Straightforward resolution (i.e. just do it) Contradictory/contentious Comment resolution team to work on comments Draft text changes Approve comment resolutions <Pat Kinney>, <Kinney Consulting LLC>

Subteam/Categories & Leads <Mar 2011> Subteam/Categories & Leads DSME – M Lee/Wun-Cheol Jeong/Youcy TSCH – J Simon LL – M Bahr LE – W Hong/Kazu EB & EBR – B Rolfe/W Hong ESOR & IE – B Rolfe/Youcy 4G – J King 4F – M McInnis General (all others) – P Kinney et al  revise informative Annex I - P Kinney <Pat Kinney>, <Kinney Consulting LLC>

<July 2011> TG4e Schedule Letter Ballot Start (30-day) 8 Oct 2010 Letter Ballot Close 7 Nov 2010 Resolve comments 20 Jan 2011 Recirculation (15-day) 25 Feb 2011 Resolve comments 17 Mar 2011 Recirculation II (15-day) 21 Apr 2011 Resolve comments 8 May 2011 Recirculation III (15-day) 7 Jun 2011 Sponsor Ballot (30-day) 5 Aug 2011 Resolve comments 19 Sep 2011 Recirc-1 (10-day) 14 Oct 2011 Recirc-2 (10-day) 28 Oct 2011 EC approval to go to RevCom 11 Nov 2011 IEEE RevCom approval Mar 2012 <Seong-Soon Joo>, <ETRI>