W6AYC Tower Project 50 foot crank-up

Slides:



Advertisements
Similar presentations
DXing from a City Lot Gary L. Drasch K9DJT.
Advertisements

Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Model 12 Intek Horizontal OHV Crankcase Disassembly and Assembly Lab #7.
Key To Successful Tower Installations:
Rapidly Deployable Low-cost Telecommunications Tower Alan Van Pelt Michael Rosenblum.
PETRONAS TWIN TOWER, KUALA LUMPUR, MALAYSIA -COBRA TEAM-
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Low Band DXing There’s life below 14 MHz! 40 meter attributes
Appendices Subpart R Steel Erection
KMA 4113 Log Periodic Antenna for 49 Mhz to 1.3 Ghz
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
Exacta ™ Digital Torque Wrenches Sturtevant Richmont Global Reach. Local Support.
A Balancing Act. When is an object in Equilibrium? When its state of motion is not changing What are the conditions for Equilibrium? 1) the net force.
Sustainable (Backpack) NIMS Interns: Dor Yisrael Ashur (UCSD) Aerospace Engineer Olmo Fabian Maldonado Gomez (UTSA) Electrical Engineer Week 5: WPM, Overview,
Area of Surface and Volume of Three-Dimensional Objects
Mechanics of Materials. To determine the loading on a body Draw a free body diagram indicating – external loads and moments – reaction loads and moments.
VISUAL REALITY Massive Proposal Face Area Increase of 4,217 Sq.Ft. Industrial building increase by 12,480 square footage.
EXAMPLE 3 Standardized Test Practice SOLUTION
Measurement Finding circumference, weight and height of pumpkins.
The Eiffel tower is in separate stages of being built. Finished Started The Eiffel tower is located in Paris.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Projectile Motion III 10/8/13. Remember RIDGES (9/20) R – Read the problem carefully! I – Identify what you are looking for and the Information that is.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
ENGINE REASSEMBLY Chapter 12 Classroom Manual page 311
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
By: Ryan and Drew.  Armament (weapons): None  Engines: Two Pratt and Whitney J58’s (each weighing 6,000 lbs.)  Maximum Speed: Mach 3.2 (3.2 times the.
ESTIMATING STEEL FOR CONCRETE POURS. REBAR -Estimated by the pound or ton -Must know the size of steel bar needed -Must know linear feet needed -Bars.
30’ Wireless Mast – Self Install
EXPLORING VOLUME The volume of a solid is the number of cubic units
Signing Plan Design - At Grade Intersections TEM Chapter 6-8
SBN Far Detector Installation & Integration
Simple Machines Objectives: Levers Torque and Levers
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Design of a Commercial Shopping Center
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Hoover Dam.
12.4 Volume of Prisms & Cylinders
Estimating the Cost for the Concrete Pad
Describing Rotational Motion
4th Annual Construction Law Summit
Project Management 101 Business Management.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
Reaction Forces and Moments
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Competency: Draw Foundation Plans
12-4 Volume of Prisms and Cylinders
Equivalent Systems.
Foundations Four Basic Types Footings Piers Pilings Slabs
How & When to Get Permits for Work in Your Home
P08002 Automated Parallel Bars
Estimating the Cost for the Concrete Pad
Chapter 47 Wheel Alignment.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
April May April May June July July June August Sept August
Estimating the Cost for the Concrete Pad
McDonald’s calendar 2007.
Tropical cyclones movement
Ch. 4-2 Converting Units November 14, 1999
Harbour Island Force Main Replacement
EXPLORING VOLUME The volume of a solid is the number of cubic units
Carved Foot Draw line ¼ to ½ in from outer edge – parallel ring to outside corner Use loop tool with right angle to carve away Carve away layers at a time.
McDonald’s calendar 2007.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
2015 January February March April May June July August September
Presentation transcript:

W6AYC Tower Project 50 foot crank-up Max height for most SLO cities and county without special use permit 15 square feet of antenna capability Emphasis on convenience rather than cost

2018 Timeline- >7 months Ordered engineering prints from Tashjian April 19- Permit request to Atascadero May 8- Permit corrections from city June 27- Revisions from Tashjian July 5- Revisions to city July 23- City permit issued August 22- Foundation excavation August 23- Concrete pour November 17- Tower Install November 19- Final Inspection November 24- Antenna installed and operational

Excavation - August 22

8 foot hole

Rebar cage (6 foot)

Concrete Pour- August 23

Completed base

3 months later: November 17- 2 ½ guys humping tower off truck and into position

Installed tower and StepIR

It was all my wife and I could do to attach competed STEPPIR to mast (16 foot boom, 58 lbs)

Tower up and new tools

Costs Replaced a TH-2 2element Tribander ($390) on 30 foot Spiderbeam mast ($485) and armstrong rotator

Lessons Learned Ham radio is side work for tower suppliers Be patient Cities use independent contractors to review drawings They can be picky Make sure foundation dig is per city approved documents Understand rotator ratings Yaesu rates rotators for antenna square footage and torque Torque is by far the limiting factor for ham antennas Thrust bearings are not critical Rotators take many hundred pounds of vertical load Crankup-tiltover towers are not precision built Crow bars, spud wrenches, hammers, & broad head bull pin tools required to align holes

Appendix 3 element STEPPIR with 40m loop 15 foot mast 8.1 sq ft 58 lbs 15 foot mast 55 lbs Tower rating: 14.5 sq ft at 51 feet height (moment= 740) 8.1 sq ft at 61 feet height (moment= 494) Yaesu G1000DXA Rotator: 23 sq ft, “K” factor 230 “K” factor= turning radius (meters) x weight (kg) = 6 (26 +10)= 216