Throughput Throughput, Utilization, Bottleneck, Effective Capacity, Theoretical Capacity, and Capacity Leverages. November 11, 2011 Ardavan Asef-Vaziri.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Fill in missing numbers or operations
Operations Scheduling
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
Lesson 3-3 Ideas/Vocabulary
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Problem1; Admission Flow
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Make to Stock (MTS) vs. Make to Order (MTO)
Process Flow Thinking 1. Overview Process flow is about how the product or service is made. Some measures we will want to study include: Throughput time,
Throughout Problems.
Waiting Line Management
Process Flow Analysis The Little’s Law The main source for preparing these slides is Managing Business Process Flow Anupindi, Chopra, Deshmoukh, Van.
LP Formulation Practice Set 1
1 POLYGENERATION OF ELECTRICITY, HEAT and ULTRA PURE WATER for SEMICONDUCTOR INDUSTRY Chuanfeng Liu Supervisors: Andrew Martin EGI KTH Aapo Sääsk Xzero.
Chapter 5 Capacity Planning.
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
Capacity Planning.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Constraint Management
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity Capacity – Is the maximum amount of work that an organization is capable of completing in a given period of time.
Process Capacity.
Flow Rate and Capacity Analysis
Chapter 5 Strategic Capacity Planning
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Chapter 5 Capacity Planning For Products and Services
Network and System Design
Strategic Capacity Planning for Products and Services
Operations Management
1 1 Slides by John Loucks St. Edwards University Modifications by A. Asef-Vaziri.
Three Key Process Measures: Flow Rate
Example: Receiving goods to warehouse Detailed view Receive Goods Inspect Goods (30) Match order? (10) Supervisor Report (5) Quality Check (45) Accept?
Applications Problem Solving. 6/25/2013 Applications 2 Four-step Method 1. Define variables Name the quantities to be found Write these down Example:
Re-Order Point Problems Set 1: General
Capacity Planning Break-Even Point Ardavan Asef-Vaziri Systems and Operations Management College of Business and Economics California State University,
Starter 1 (1-D) A car travels 100 km from city A to city B. If the first half of the distance is driven at 50 km/h and the second half is driven at 100.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
1 Ardavan Asef-Vaziri Oct. 2011Operations Management: Waiting Lines 1 Polling: Lower Waiting Time, Longer Processing Time (Perhaps) Waiting Lines.
What is motion? An object is in motion when it’s distance from another object changes. What is a reference point? It is an object or place used to determine.
1 If we modify the machine for the language we can easily construct a machine for the language Observation.
Number bonds to 10,
TRAVEL MATHS D T S SPEED DISTANCE TRAVELLED JOURNEY TIME.
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Building Lean Systems Takt Time
Assignment Capacity.
Based on the book: Managing Business Process Flows.
Kristen’s Cookies.
Polling: Lower Waiting Time, Longer Processing Time (Perhaps)
Flow Rate and Capacity Analysis
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines3  Terminology: The characteristics of a queuing system is captured by five parameters:
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Operations Managment Kristen’s Cookie - Lecture 4 (Chapters 4 and 5)
Based on the book: Managing Business Process Flows.
Throughput Part 2 Effective Capacity & Utilization Based on the book: Managing Business Process Flows.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Analysis and Design of Asynchronous Transfer Lines as a series of G/G/m queues.
Flow Rate and Capacity Analysis
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order Problem 5.2: Flow unit = 1 order of 1 dozen. The unit loads.
Key Learnings: Little’s Law
Theoretical Capacity Theoretical capacity: The capacity (throughput rate) of a process under ideal conditions (units / time) Effective capacity: The capacity.
Process engineering TAKT times.
Analytical Tools for Process Analysis and Improvement
Throughput Key Problems
Assignment Capacity The recorded solution to the first problem is available at
Presentation transcript:

Throughput Throughput, Utilization, Bottleneck, Effective Capacity, Theoretical Capacity, and Capacity Leverages. November 11, 2011 Ardavan Asef-Vaziri

Flow Rate, Throughput, Takt Time and Capacity Throughput is the number of flow units per unit of time. Observe the process for a number of periods. Measure the number of flow units that are processed per unit of time. Compute the average number of flow units per unit of time. Throughput = Average Flow Rate Capacity is the maximum sustainable flow rate. In periods of heavy congestion, throughput is equal to capacity. In a synchronized operation: Throughput = Demand < Capacity Throughput Analysis Ardavan Asef-Vaziri, June 2013 2

Flow Rate, Throughput, Takt Time and Capacity Cycle Time is defined in terms of Capacity. Cycle time = 1/Capacity Capacity = 15/hour Cycle Time = 1/15 hour Cycle Time = 4 minutes Takt time derived from the German word “pace”. Takt Time is defined in relation to Demand or Throughput. Demand = 12/hour  Throughput = 12/ hour Takt Time = 1/Demand = 1/(Throughput) = 1/R Takt Time = 1/12 hour Takt Time = 5 minutes Throughput Analysis Ardavan Asef-Vaziri, June 2013 3

Flow Rate, Throughput, Takt Time and Capacity R= Ra  Takt time = 1/Ra Average inter-arrival time = Ta = 1/Ra = 1/R = Average inter- exit time It is not uncommon for managers to state that their machines have takt time of five minutes (1/12 hour). It is wrong. Takt time is a measure of external demand, it has nothing to do with the internal measure of machine capacity. In a synchronized system, Takt time is the time each station has to send one flow unit out to the next station. Chapter 4 was on flow time minimization. Chapter 5 is on throughput maximization. Chapter 4 and 5 are both “time” minimizations. Why? Throughput Analysis Ardavan Asef-Vaziri, June 2013 4

Activity Time, Unit Load, Total Unit Load Operation B Activity Time = 10 min Operation A Activity Time = 5 min If both are done on Recourse (1) then the theoretical unit load of Resource(1) is 10+5 = 15 min. If Capacity waste factor in both stations is 25% then the total unit load 15/(1-0.25) = 20 min. We refer to this as Tp. It is not important to memorize the theoretical unit load and the unit load. What is important is if we do not consider Capacity Waste Factor then we are talking about the theoretical capacity. If we consider, then we are talking effective capacity or simply capacity.

Resources, Resource Pools and Resource Pooling Unit Load of a Resource Unit (Tp) – The amount of time the resource works to process each flow unit. This includes a share of all distractions such as maintenance, repair, setup, etc. It is a effective unit load not the theoretical unit load. Throughput Analysis Ardavan Asef-Vaziri, June 2013 6

Ardavan Asef-Vaziri, June 2013 Effective Capacity Effective Capacity of a Resource Unit Rp= 1/unit load = 1/ Tp Effective Capacity of a Resource Pool = Rp=c/Tp Bottleneck – The resource pool with the minimum effective capacity. Effective capacity of a process: Effective capacity of the bottleneck. Cross train Claims Supervisor to help Mailroom clerk  Increase Capacity. Throughput Analysis Ardavan Asef-Vaziri, June 2013 7

100% Utilization is a High Risk Imagine a a freeway where all the cars are driving exactly 65 and the distance between pairs of cars in 1 inch. As long as every one has a speed of exactly 65 that is fine. But can they do that? What happens if one hits the break? How long does it take to clean the freeway. Do cars pass freeway easier when utilization is 1 and they are moving bumper to bumper, or when 50% of the freeway is empty, U = 0.5, or when U = 0.25. How long it takes to clean up accidents in these situations? Never make U of all the sub-processes or activities, and not even a single sub-process = 1 Throughput Analysis Ardavan Asef-Vaziri, June 2013 8

Ardavan Asef-Vaziri, June 2013 Capacity Utilization R = 400 per day. Capacity utilization of a resource pool Up = Throughput/Effective capacity of a resource pool = R/Rp Capacity utilization of the process U = Throughput/Effective capacity of the bottleneck resource pool Throughput Analysis Ardavan Asef-Vaziri, June 2013 9

Cycle Time, Takt Time, Flow Time Day = 480 minutes. Rp = 480 per day Cycle time = 1/Rp CT = 1/480 day CT = 480(1/480) = 1 minute We already knew CT = 1 min. R = 400 per day Takt Time = 1/R TT = 1/400 day TT=480(1/400) = 1.2 minute Flow Time = 1+5+8+2.5 FT = 16.5 Throughput Analysis Ardavan Asef-Vaziri, June 2013 10

Unit Load for a Product Mix Billing: Physician claims 60%, Hospital claims 40% Throughput is 400 units per day. Process utilization: U =100% Throughput Analysis Ardavan Asef-Vaziri, June 2013 11