INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Concerns with RUC Capacity Short Charge and Energy Trades.
DSWG Update to WMS May 17, DSWG Goals Update.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Loads Acting as a Resource Relationships with QSEs and LSEs
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Item 8, Technical Advisory Committee Meeting April 8, 2010.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Load Participation in Real-Time Market: LMP Minus G.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ERS Update – DSWG Presentation September 21, 2012.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Operations Update ERCOT Board Meeting March 18, 2003.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
CRR Deration and NPRR821 WMS 09/06/2017.
Asia-Pacific Energy Regulatory Forum
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Real-Time Co-optimization of Energy & Ancillary Services
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG

BACKGROUND ON THIS ISSUE

What Is The Problem? Consumers who want to meet some or all of their energy needs through the real-time market could be subject to unpredictable and potentially severe penalties (RUC Capacity Short Charge). Consumers who want to meet some or all of their energy needs through the real-time market could be subject to unpredictable and potentially severe penalties (RUC Capacity Short Charge). This could limit or eliminate loads ability to benefit financially from altering consumption in response to real-time prices This could limit or eliminate loads ability to benefit financially from altering consumption in response to real-time prices

What Is The RUC Capacity Short-charge? A charge to QSEs when ERCOT completes a Reliability Unit Commitment (RUC) study and finds (1) insufficient generation to meet projected demand and (2) payments otherwise available to Resources that are ordered to come on-line will not provide sufficient compensation.

The RUC Capacity Short Charge RUC Capacity-Short Charge RUC Capacity-Short Charge The dollar amount charged to each QSE, due to capacity shortfalls for a particular RUC, for a 15-minute Settlement Interval, is the QSEs shortfall ratio share multiplied by the total RUC Make-Whole Payments, including amounts for RMR Units, to all QSEs for that RUC, subject to a cap. The cap on the charge to each QSE is two multiplied by the total RUC Make-Whole Payments, including amounts for RMR Units, for all QSEs multiplied by that QSEs capacity shortfall for that RUC process divided by the total capacity of all RUC- Committed Resources during that Settlement Interval for the RUC process. The cap on the charge to each QSE is two multiplied by the total RUC Make-Whole Payments, including amounts for RMR Units, for all QSEs multiplied by that QSEs capacity shortfall for that RUC process divided by the total capacity of all RUC- Committed Resources during that Settlement Interval for the RUC process.

What Does ERCOT Rely On In Determining If There Is A Capacity Shortage? Current operating plans for generating capacity Current operating plans for generating capacity Generation Resources committed through the DAM Generation Resources committed through the DAM Resources committed to provide AS Resources committed to provide AS Resources committed through previous RUCs Resources committed through previous RUCs All of which is compared to the anticipated demand All of which is compared to the anticipated demand Load Forecast Error will therefore heavily influence the frequency and amount of RUC procurement by ERCOT Load Forecast Error will therefore heavily influence the frequency and amount of RUC procurement by ERCOT

How does ERCOT determine the QSEs load for RUC purposes? The RUC Shortfall in MW for a QSE is determined using actual real-time metered load at the settlement point during the intervals RUCd units are deployed The RUC Shortfall in MW for a QSE is determined using actual real-time metered load at the settlement point during the intervals RUCd units are deployed The same settlement interval metered data is utilized for purposes of the RUC Snapshot at time of RUC procurement as a time of RUC deployment The same settlement interval metered data is utilized for purposes of the RUC Snapshot at time of RUC procurement as a time of RUC deployment

How is the RUC Capacity Short Charge Assigned? ERCOT identifies QSEs who have not brought enough capacity to the table ERCOT identifies QSEs who have not brought enough capacity to the table ERCOT assigns those short QSEs a share of the total costs of bringing additional Resources on-line ERCOT assigns those short QSEs a share of the total costs of bringing additional Resources on-line The RUC Make-Whole payment is subject to a cap if ERCOT commits more capacity in the RUC process than necessary to make up the capacity shortfall. The RUC Make-Whole payment is subject to a cap if ERCOT commits more capacity in the RUC process than necessary to make up the capacity shortfall.

Who Is Responsible For Over- commitments Of Capacity By ERCOT? ERCOTs short-term load projections can err on the high side, i.e., QSEs schedule may not be the cause of the over-commitment ERCOTs short-term load projections can err on the high side, i.e., QSEs schedule may not be the cause of the over-commitment –Example – unanticipated change in weather ERCOT has sole control of the RUC process and there is no way to predict an over-commitment error ERCOT has sole control of the RUC process and there is no way to predict an over-commitment error Similarly, the amount of the short charge penalty is not predictable Similarly, the amount of the short charge penalty is not predictable

Will Loads Have Advance Notice Of RUC Deployments? Yes. Loads will have anywhere from 15 minutes to several hours advance notice of an interval in which one or more RUCd units are to be deployed. Yes. Loads will have anywhere from 15 minutes to several hours advance notice of an interval in which one or more RUCd units are to be deployed. When a RUC is run and a capacity procurement occurs, that will be instantly posted on the ERCOT website and publicly available to all. When a RUC is run and a capacity procurement occurs, that will be instantly posted on the ERCOT website and publicly available to all.

Does Advance Notice Of RUC Deployment Solve The Problem? Not necessarily. Not necessarily. Dont know how frequently the capacity short charge will occur Dont know how frequently the capacity short charge will occur Dont know the likely magnitude of the charges Dont know the likely magnitude of the charges Not knowing is in itself a disincentive to demand response in real time Not knowing is in itself a disincentive to demand response in real time If RUC procurements occur with excessive frequency, loads cannot afford to be un-hedged. If RUC procurements occur with excessive frequency, loads cannot afford to be un-hedged.

Impact Of Penalty? Depends on frequency/magnitude of RUC charges Depends on frequency/magnitude of RUC charges Customers may avoid demand response in real-time in order to avoid RUC capacity short charges Customers may avoid demand response in real-time in order to avoid RUC capacity short charges Loads may be forced into the Day-Ahead Market or into bilateral contract Loads may be forced into the Day-Ahead Market or into bilateral contract Fluctuating loads forced to over-procure in day ahead or in bilateral contract. Exacerbated by 1 hour procurement interval and 15 minute RUC interval. A credit is obtained for unused energy, but the price obtained in unknowable. Fluctuating loads forced to over-procure in day ahead or in bilateral contract. Exacerbated by 1 hour procurement interval and 15 minute RUC interval. A credit is obtained for unused energy, but the price obtained in unknowable.

Options For Encouraging Demand Response In Real-Time Options For Encouraging Demand Response In Real-Time 1.ELIMINATE THE RUC ALTOGETHER 2.EXEMPT PRICE-RESPONSIVE LOADS FROM RUC FROM RUC 3.ELIMINATE THE 2X PENALTY 4.APPLY A RUC CAPACITY SHORT CHARGE CIRCUIT BREAKER 5.IMPLEMENT NEW MECHANISMS TO ENCOURAGE PRICE RESPONSIVE LOAD

1.Eliminate The RUC INVOLVES UPLIFTING ALL SHORT INTERVALS INVOLVES UPLIFTING ALL SHORT INTERVALS IGNORES THE MORE IMPORTANT PURPOSES INTENDED BY THE RUC PROCESS IGNORES THE MORE IMPORTANT PURPOSES INTENDED BY THE RUC PROCESS UNLIKELY TO OBTAIN CONSENSUS UNLIKELY TO OBTAIN CONSENSUS

2. Exempt Price-Responsive Loads From RUC REQUIRES IDENTIFYING LOADS REQUIRES IDENTIFYING LOADS MAY REQUIRE TELEMETRY MAY REQUIRE TELEMETRY WOULD REQUIRE ERCOT MONITORING WOULD REQUIRE ERCOT MONITORING WOULD REQUIRE CHANGES IN SOFTWARE WOULD REQUIRE CHANGES IN SOFTWARE TIMING PROBLEM – WOULD NOT BE IMPLEMENTABLE BY NODAL START DATE TIMING PROBLEM – WOULD NOT BE IMPLEMENTABLE BY NODAL START DATE

3. Eliminate The 2X Penalty EASY FIX – RUC Capacity-Short Charge The dollar amount charged to each QSE, due to capacity shortfalls for a particular RUC, for a 15-minute Settlement Interval, is the QSEs shortfall ratio share multiplied by the total RUC Make-Whole Payments, including amounts for RMR Units, to all QSEs for that RUC, subject to a cap. The cap on the charge to each QSE is two multiplied by the total RUC Make-Whole Payments, including amounts for RMR Units, for all QSEs multiplied by that QSEs capacity shortfall for that RUC process divided by the total capacity of all RUC-Committed Resources during that Settlement Interval for the RUC process. DOES NOT REQUIRE ANY PROGRAMMING CHANGES. THE PENALTY IS A PLUG IN VARIABLE THAT CAN BE SET AT ANY NUMBER

4. Implement a RUC Capacity Short Charge Circuit Breaker To protect against unexpected results regarding the amount and frequency of RUC charges, ERCOT should consider implementing a dollar and frequency cap on RUC capacity short charges allocated to QSEs following the opening of the Nodal market, beyond which the RUC costs would be uplifted in their entirety on a load ratio share basis pending the crafting of a more reasonable solution

5. Implement New Mechanisms To Encourage Price Responsive Load DSWG should explore additional mechanisms for encouraging price responsive load One possible example - allowing interruptible loads to be RUCd at a capacity surrogate price Another example – Implementation of negawatt bidding

DISCUSSION OTHER OPTIONS? OTHER OPTIONS? NEXT STEPS? NEXT STEPS?