MD Planning Fri – Sat (1. – 2.7.)

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
MD#2 Summary (R. Assmann, F. Zimmermann, G. Papotti) MD#2 Summary Report 04/07/2011 Very satisfied with second MD:  Some ground-breaking results  path.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Y.Papaphilippou Thanks to
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 24 March 2012.
Wire, flat beams and beam-beam MDs in 2017
ATS optics Results from MD3, MD4 and MD5
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Collimation margins and *
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Planning for the week MO M P
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Summary week 18 Intensity ramp up & production
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Fri :52 Stable beams fill #2536
Thursday 30th September De-bunching test
Another Immortal Fill….
Thursday Morning/Afternoon
Tuesday
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD Planning Fri – Sat (1. – 2.7.) Day Time MD MP Fri 18:00 450 GeV  3.5 TeV: Long-range beam-beam limit – lifetime, emittance versus beam-beam separation. Collimation with changing crossing angle. C Sat 02:00 Ramp down, cycle. 04:00 450 GeV: Non-linear dynamics – Dynamic aperture, non-linear chromaticity and frequency map. A 12:00 If needed: Precycle. 14:00 3.5 TeV: Collimation – combined cleaning, faster setup. 22:00 Sun 00:00 3.5 TeV: ATS – correction & pre-squeeze. 08:00 02/07/2011 MD Report

Long-range beam-beam MD Some additional result: IR1  IR5 compensation… Test of tune working point close to half integer: 0.47 02/07/2011 MD Report

Reduction crossing angle IR1 (V) and IR5 (H) 12+36 b per beam 3.5 TeV beta*1.5m in IR1/5 Reduce IR5 angle Reduce IR1 angle 50% 40% 35% 30% 40% 40% 35% 30% 50 h 2 h Crossing angles in IR1 and IR5 reduced in steps of 5 – 10 %. TCT’s following changed orbit. 100% = 120 mrad = 12 s beam-beam separation for e~2.5mm! 50% fine (no reduction in lifetime), 40% (5 s b-b) still OK, 30% too low! 02/07/2011 MD Report

IR1 Luminosity During IR5 Adjustments IR1 cross. angle at 48 mrad (~5s sep) constant. IR5 cross. angle being reduced. 72 mrad 60 mrad 48 mrad Luminosity 42 mrad 36 mrad Time Equal crossing angle amplitude in IR1/5 best for diffusion! Compensation of LR beam-beam effects in IR1 and IR5… 02/07/2011 MD Report

IR1 Luminosity During IR5 Adjustments IR1 cross. angle at 48 mrad (~5s sep) constant. IR5 cross. angle being reduced. 72 mrad 60 mrad 48 mrad Luminosity 42 mrad 36 mrad Maybe even smaller beam-beam separation is acceptable with equal amplitudes of IR1 and IR5 crossing angles!? Time Equal crossing angle amplitude in IR1/5 best for diffusion! Compensation of LR beam-beam effects in IR1 and IR5… 02/07/2011 MD Report

Tune WP Close to Half Integer (B1 shown) 02/07/2011 MD Report

Non-linear Dynamics MD (Dynamic Aperture) M. Giovannozzi et al DA measurement part of the non-linear MD: Correcting/checking tunes, coupling and chromaticity. Aperture kicker was used to heat the beam and induce losses related to non-linear dynamics. Intensity vs. time was recorded for: nominal conditions (but with MOs set to zero) scan on the MCOs strength Originally it was also planned to scan over the MCDs strenght, but in the end it was not possible due to lack of time (mainly BETs issue at the SPS, which prevented to inject Beam 1 for a long time). The data collected will need to be analysed off-line. 02/07/2011 MD Report

Non-linear Dynamics MD II F. Schmidt et al NL chromaticity measurement and correction of Q" and Q"' with newly defined MCO & MCD spool piece: In System/BETA-BEATING: LHCBEAM/non_lin_chroma_dqq_b2 (b4)      1200.0 LHCBEAM/non_lin_chroma_dqqq_b2 (b5)     160.0 NL chromaticity B2 before correction: Q" = -1800 570 (H/V) Q"' = -1.900E6 0.78E6 (H/V) NL chromaticity B2 after correction: Q" = -670 -170 Q"' = -0.37E6 -0.15E6 Comments: Collimation settings in IP6 limited the maximum kick strengths of both kicker types. Therefore no true DA measurement possible with kickers. Spool piece correction very effective also to reduce detuning. with amplitude. 02/07/2011 MD Report

Non-linear Dynamics MD: Non-linear chromaticity (not corrected) 02/07/2011 MD Report

Non-linear Dynamics MD: Non-linear chromaticity (corrected) 02/07/2011 MD Report

Tune versus Action 02/07/2011 MD Report

Collimation MD MD started at 17.00 (3 hours late) - due to delayed recovery from previous MD. New alignment of collimators in IR3 for b1 and b2. Centers of collimators within 100um from previous values, but for TCSG.5L3.B1 (230um difference)  Excellent news! In parallel, tested new automatic features of collimation application on B1. Automatic alignment (not satisfactorily functioning yet). Automatic pattern recognition of loss spikes. Worked for 98% of cases. 2% other cases: delay in detecting loss spike (under investigation)? 02/07/2011 MD Report

Collimation MD Setup combined H betatron cleaning in IR3 for B2: IR3 collimators moved to 5.7 (TCP),6.7 (TCSG),10 sigma (TCLA). IR7 H and skew opened. IR7 V collimators left at relaxed settings. Orbit correction on B2 before loss maps. Test of system with B2 horizontal loss map V and H tunes swapped. Loss maps on B2 H betatron caused beam dump on both beams (TCLA.A5L3.B2). Note that also TCTV in IR1 and IR8 were above dump thresholds (cleaning inefficiency ~ 1to 2%). Cleaning inefficiency downstream IR3 (cold regions) 5e-4 To be compared with simulations. 02/07/2011 MD Report

Collimator Settings B2 02/07/2011 MD Report

Loss Map Combined H Betatron Cleaning 99.9 % 02/07/2011 MD Report

ATS MD (S. Fartoukh et al) Two unsuccessful ramps (for various reasons), third fine. Second ATS MD successfully demonstrated the principle: beta*: 30 cm was reached at IP1 while beta* IP5 remained to "pre-squeeze beta* of 1.2 m (already below existing collision beta* of 1.5 m). Chromatic aberrations were well under control during the squeeze (non-linear chroma, off-momentum beta-beating). The on-momentum beta-beating was recorded at beta*=4.4 m, 1.2 m, 54 cm and 30 cm. At 30 cm: peak beta-beating error 15% - 40%, depending on plane and beam, with correction from empirical trims on Q2.R1, Q2.L5 and Q2.R5 (about 10-13 units), as derived for the nominal squeezed optics. This beta-beating error has to be compared to the 400% design beta-beat induced on purpose in sectors 81 and 12 to squeeze beta* by a factor of 4 w.r.t. the pre-squeezed beta* of 1.2 m. Note: Pilot intensity  Setup presently not usable for high intensity (collimation & MP issues). 02/07/2011 MD Report

ATS: 30 cm b* in IP1: Measured bx First time ever proof of principle for this optics solution 02/07/2011 MD Report

ATS: 30 cm b* in IP1: Measured by First time ever proof of principle for this optics solution 02/07/2011 MD Report

ATS: Meas. Beta Beat Err (here B2; B1 better) 02/07/2011 MD Report

ATS: Meas Coupling Error (here B2; B1 better) 02/07/2011 MD Report

ATS: Measured Dispersion Error (here B2) 02/07/2011 MD Report

ATS: Off-Momentum Beta Beat Error (B2 H) 02/07/2011 MD Report

MD Planning Sun – Mon (3. – 4.7.) Day Time MD MP Sun 00:00 3.5 TeV: ATS – correction & pre-squeeze. A 08:00 Ramp down, cycle. 10:00 450 GeV: Beam distribution in LHC – scraping, halo, tails, BLM limits, … (high intensity) B 14:00 450 GeV: Quench margin at injection – observation with special QPS instrumentation, losses from TCLIB collimator, TCDQ checks in parallel C 22:00 450 GeV: R2E – slow controlled losses (1e13p on Q14.R2.B1). Mon 06:00 Technical Stop Needs from experiments: 30.6., 08:00 to 16:00 – Luminometers on in ATLAS and CMS 01.7., 18:00 to 02:00 – Luminometers on in ATLAS and CMS 02/07/2011 MD Report