EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.

Slides:



Advertisements
Similar presentations
Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
Advertisements

2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
Radio frequency usage/applications Dr S. T. Boogert (accelerator physicist) John Adams Institute at Royal Holloway Royal Holloway.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Kazuro Furukawa, KEK, May Event System and Embedded IOCs EPICS Meeting, Vancouver 1 Event System and Embedded IOCs at KEK Recent Activities at KEK.
Overview of PLS/PLS-II Control System Jin Won Lee Beam Operation Team Accelerator Division Pohang Light Source Korea
K.Furukawa, Apr EPICS at KEKB Injector EPICS-ness at KEKB Injector Kazuro Furukawa, KEK. KEKB Injector and Legacy Controls Network Controllers EPICS.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Kazuro Furukawa, KEK, Jun EPICS Collaboration Meeting / NSRRC SuperKEKB Controls 1 Recent developments towards SuperKEKB controls Kazuro Furukawa.
Kazuro Furukawa, KEK, Oct EPICS Collaboration Meeting / BNL KEK and SuperKEKB 1 Recent progress at KEK and Plans for SuperKEKB Kazuro Furukawa for.
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
AS Diagnostic Collaboration Mark Boland
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
K.Furukawa, Feb Controls Activity at KEK Controls Activities at KEK Issues for ILC Kazuro Furukawa, KEK.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
050928ICFA seminar Daegu 1 Inter-University Research Institute Corporation High Energy Accelerator Research Organization KEK Yoji Totsuka.
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
K.Furukawa, Apr EPICS at KEKB Injector EPICS-ness at KEKB Injector Kazuro Furukawa, KEK. KEKB Injector and Legacy Controls Network Controllers EPICS.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
February 2010 ALBA Synchrotron Light Source Francis Perez.
Kazuro Furukawa, KEK, Jan Accelerator Controls at KEK EPICS Workshop 2009, RRCAT, India 1 Event System at KEK Kazuro Furukawa, KEK KEKB and Linac.
K.Furukawa, KEK, Nov Injector Linac Progress towards SuperKEKB Progress of Injector Linac Kazuro Furukawa for Injector Linac 1.
Kazuro Furukawa, KEK, Jun EPICS Collaboration Meeting / NSRRC SuperKEKB Event / Timing Controls 1 Timing system towards SuperKEKB controls Kazuro.
1 KEKB Archiving Dec Tatsuro KEK.
The recent history and current state of the linac control system Tom Himel Dec 1,
Kazuro Furukawa, KEK, Jan Accelerator Controls at KEK EPICS Workshop 2009, RRCAT, India 1 Accelerator Controls at KEK Mainly KEKB and Linac Evolution.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Progress of Injector Linac
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
LLRF Activities at KEK/J-PARC Zhigao Fang 1 SuperKEKB 2 cERL (compact Energy Recovery Linac) 3 STF (Superconducting RF Test Facility) 4 J-PARC LLRF workshop.
Current Status of Web Application for RIBF Accelerator
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Digital LLRF plans at the Australian Synchrotron P.Corlett, K.Zingre, G. LeBlanc Australian Synchrotron, 800 Blackburn Road, Clayton 3168, Victoria, Australia.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
Experience of Developing BEPCII Control System
Operations Machine Simulator.
Current Status of IPM-Linac Control System
SLS Timing Master Timo Korhonen, PSI.
Magnet Power Supplies for SuperKEKB Main Ring
Tango status at Elettra
Utilization of KEKB for ILC R&D
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Table 1: The specification of the PSICM and the ePSICM Prototypes
LLRF and Beam-based Longitudinal Feedback Readiness
< kek.jp > Measurement and Data Acquisition for Accelerator Controls at KEK (Beam Position Monitor at Linac) Kazuro Furukawa < kazuro.
Performance Degradation cERL Injector Cryomodule
LAL meeting on e+ studies, Oct. 2010
Status of SuperKEKB May 11, 2007 SuperB Workshop Masa Yamauchi KEK.
Next Linear Collider Test Accelerator and EPICS
AC Power for a Super-B Factory
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
The RF Control System for the SwissFEL
Device support for VMIVME-5565 and its usage at KEK
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh

EPICS status in KEK Accelerator facilities in KEK Tokai campus J-PARC (Linac + Rapid Cycle Synchrotron + Main Ring) Tsukuba campus KEKB => SuperKEKB (7 GeV e-, 4 GeV e+ collider w/ positron damping ring) PF (2.5 GeV light source) PF-AR (6.5 GeV light source) Injector linac for SuperKEKB and light sources ATF (Accelerator test facility for Linear Collider) STF (Superconducting test facility) cERL (ERL test facility) We have used the EPICS based control system for KEKB project. After that, other machines have adopted EPICS based system. Original control systems of Injector, PF, and others have been replaced by the EPICS based ones.

EPICS status in Injector Linac The original control system softwares have been gradually transferred to the EPICS based ones. All control parameters are accessible via EPICS PVs. Base R3.14.12 - R3.15.5 (~ 150 IOCs) CSS archiver, CSS alarm OPI: Many GUIs are implemented by Python/Tkinter/Qt4.

EPICS status in Injector Linac (cont’d) Local controller (~ 400) VMEx64: MRF EVG, EVR for timing system, DAC, ADC for LLRF control, BPM readout (VxWork 6.8) PLC for magnet power supply, vacuum, safety system (NetDev) Network attached power supply (x100) (StreamDevice) Embedded computer for klystron controller (Almazillo) PXI based DAC, ADC, MRF EVR for pulsed magnet control (LabVIEW based, Windows Pro. 8.1)

Future in KEK For the recent new project like cERL, 100% EPICS based control system was developed from the beginning. In the other facilities like injector linac, PF, the original control system => EPICS in this decade. EPICS V3 is still mainstream for the time being. EPICS7 will be tested, and gradually deployed for the beam operation. e-/e+ Injector Linac The original (non-EPICS) control applications still exist. These old ones will be obsoleted soon. EPICS7 functionalities Improvement of the data transfer performance (camera data of profile monitors ) Hierarchal data structure could be effective for commissioning tool developments.