Identification of BART-Eligible Sources in the WRAP Region

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

Regional Haze Update & Current Results Michele Notarianni Brenda Johnson EPA Region 4.
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Identification of BART-Eligible Sources in the WRAP Region A Summary of the April 4, 2005 Draft Report.
Region 9 Tribal Air Quality Conference Regional Haze Rulemakings: Western Regional Air Partnership Annex July 25, 2002.
BART-Eligible Sources in the WRAP Region Stationary Sources Joint Forum Meeting November 14-15, 2006 Tempe, AZ.
Clean Air Corridor Section 309 Requirements Presentation to WRAP Board July 24, 2002.
Regional Haze, Dust, and New Mexico Developing a State Implementation Plan for Dust in the Salt Creek Wilderness Area, New Mexico.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
1 WRAP Fire Tracking Systems Draft Intent of WRAP FTS Policy – Assist states/tribes to address emissions inventory and tracking associated with fire in.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Integrated Regional Water Management Planning Proposition 50: Integrated Regional Water Management Planning Grant Program North Coast IRWMP: region, process,
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Stationary Sources Joint Forum Update Eric Massey Arizona Department of Environmental Quality Lee Alter and Patrick Cummins Western Governors’ Association.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
REGIONAL HAZE BART – Key Issues For Consideration Eric Massey, Arizona DEQ Lee Alter, WGA SSJF Meeting June 3, 2004 Denver, Colorado.
SSJF/EF/TDDWG Point and Area EI Project: Review of 2018 Base Case Emissions Projections Emissions Forum Meeting February 7, 2006.
Regional Haze, Dust, and New Mexico Developing a State Implementation Plan for Dust in the Salt Creek Wilderness Area, New Mexico.
Market Trading Forum Update Ira Domsky and Colleen Delaney, Co-chairs.
Status of BART Analyses Implementation Workgroup Meeting April 17, 2007.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Best Available Retrofit Technology (BART) Process November 15, 2006 Eric C. Massey, Manager Air Quality Compliance Section.
Air Quality Policy Division D P A Q 1 Regional Haze Update WESTAR September 17-19, 2007 EPA Office of Air Quality Planning & Standards.
EPA – Regional Haze Issues IWG Meeting April 17 th Keith Rose and Laurel Dygowski.
BART Identification Project Update Lee Alter, WGA Stephanie Finn, ERG SSJF Meeting June 2-3, 2004 Denver, CO.
Strategic Plan Development Status Technical Analysis Forum meeting October 11, 2007.
Presented by: Eastern Research Group, Inc. May 10, 2005 Status Report to the Stationary Sources Joint Forum: Task 2: Control Technology Analysis.
WESTAR Staff Reports  Technical Coordinator Report  Regional Haze Planning Report  Training Program Report.
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005
Status Report to the Stationary Sources Joint Forum:
Overview of the FEPAC Accreditation Process
Tribal Inventory Project
Arizona Regional Haze State Implementation Plan
CAIR Replacement Rule and Regional Haze
BART Overview Lee Alter Western Governors’ Association
Monthly Update on WRAP Workplan
EPA Office of Air Quality Planning and Standards
Department of Environmental Quality
Department of Environmental Quality
Upcoming projects* to support Regional Haze SIP/TIP planning
Project Definition of Bulk Electric System
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
Status of Regional Haze Rule
Western Regional Haze Planning and
Who is BART in Idaho and how do we know?
EPA Clarification on Regional Haze SIP Issues
WRAP Overview and Role of Dust Forum
Market Trading Forum Update
GAC Travel Support Rules Update
Initiatives Oversight Committee Update on Other Activities
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
Stationary Source NOx and PM Report: An Update Lee Alter Western Governors’ Association WRAP Market Trading Forum Meeting September 19-20, 2002 Snowbird,
Regional Haze SIP Status Report
NC’s 111(d) Plan Develop 111(d) State Plan consistent with Clean Air Act requirements Information requested from subject facilities Best System of Emissions.
WRAP Stationary Sources Forum Meeting November 14-15, 2006
Stationary Sources Joint Forum: Next Steps
Workshop Technical and Policy Studies to Support the Annex
Defining “Significant Impact” from Mobile Sources and Road Dust
Fire Emissions Joint Forum February 9, 2005
Market Trading Forum Update
RA BART Overview Deb Wolfe 8/9/2019.
WESTAR Staff Reports Technical Coordinator Report
Regional Modeling for Stationary Source Control Strategy Evaluation
Status of Preliminary Reasonable Progress Analysis
Presentation transcript:

Identification of BART-Eligible Sources in the WRAP Region An Update for the WRAP Stationary Sources Joint Forum February 24, 2005 Salt Lake City, UT

What Is a BART-Eligible Source? A stationary source is BART-eligible if … it belongs to one of 26 source categories, has emission units which were “in existence” on 8/7/77 but “not in operation” before 8/7/62, and has a potential to emit more than 250 tpy of a visibility-impairing pollutant across all date-eligible units. A BART source may be a portion of a facility

Project Objectives Develop and maintain a regional database of eligible and potentially-eligible sources, their emissions, and current controls Promote consistency in how sources are being identified across the region Establish a common method and preliminary list of sources

Number of BART-Eligible Sources

Next Steps (Under Current SOW / Resources) Draft report and database are complete, but need to double check our conclusions on eligible and ineligible EGUs Distribute draft report to SSJF members and all states and tribes, post on WRAP website Proivde 45-day comment period States, tribes serve as conduits for review Primarily interested in quality and clarity of report, methods used, and presentation of results Specific eligibility info will be accepted, but this is expected to occur over the next several months

Next Steps (After Final Report) Resolve the likelies, potentials, and don’t knows at the facility level States, tribes serve as conduits for updating BART-eligibility database For non-EGUs, determine which part of the eligible facilities are BART-eligible Level of effort may depend on whether implementing BART or an alternative program Alternative program may require less certainty and unit-level specificity, especially if program is certain to include all eligible sources (e.g., all sources > 100 tpy) and provide for greater reasonable progress