Hydrographic Services and Standards Committee

Slides:



Advertisements
Similar presentations
Strategic Plan Working Group Process forward. 1. Start the development of the SP Produce concept note to highlight the approach identified by the SPWG:
Advertisements

IRCC 6 Report Chair MACHC Dec 2014 Mexico 1. Chair Report IRCC6 Report presented after consultation with the chair of the three working groups. The IRCC.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-6 Agenda item 10 Input from HSSC-5 IHB.
Hydrographic Services and Standards Committee 7th MEETING OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE (HSSC) Busan, Republic of Korea,
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-8 Agenda item 8 Input from HSSC-7 IHB.
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
9th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Report of the Data Quality Working Group
Proposal by the DQWG Portrayal of bathymetry quality in S-101
Standards” and by the Council key Priorities
Proposed IHO Work Programme for 2018
IRCC9 Input from HSSC8 Reference Doc: IRCC9-09A
Report on IRCC9 Key Issues Relating to EAHC
10th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
IRCC work is guided by the IHO Work Programme 3
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
Brief on Nautical Information Provision Working Group work
Report and Proposals from HSSC
Development and future provision of S-100 based Products
Meso-American - Caribbean Sea Hydrographic Commission (MACHC)
Report of the / Proposal by the DQWG
Report of the Strategic Plan Review Working Group Bruno Frachon
SPRWG Proposed orientations
Updates and Proposals from the HSSC
IRCC 10 Outcomes Complete IRCC report available on the IHO website
International Hydrographic Organization
Arctic Regional Hydrographic Commission 8th Conference
NCWG Input to the IHO Strategic Plan and IHO 3 Year Work Plan
Report of the / Proposal by the #### Title
Data Quality Working Group Meeting 14
Background Decision A1/03 of the Assembly
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
Hydrographic Services and Standards Committee
DQWG14-10J Data integrity, marine boundaries from a MSDI perspective Submitted by the MSDIWG Chair Monaco, 6 February 2019.
Hydrographic Services and Standards Committee
HSSC11 – 5.1D S-100 Readiness Levels.
IHO Secretariat, Monaco, November
Identification of port, terminal, berth and berth position
IRCC-7 Agenda item 10 Input from HSSC-6 IHB
Standards” and by the Council key Priorities
Report of the Data Quality Working Group Rogier Broekman, Chair
An Output from the NIPWG Report to HSSC7
Hydrographic Services and Standards Committee
Status Report of the SPRWG of the Council Future Strategic Plan
Report of the S-101 Project Team
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee Report of the ENCWG
IEC Activities affecting HSSC Hannu Peiponen Chair IEC TC80
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE
Status Report of the SPRWG of the Council
WENDWG – WENSWG Progress Report
IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
Status Report of the SPRWG of the Council
Hydrographic Services and Standards Committee
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
3rd Meeting of the IHO Council
Presentation transcript:

Hydrographic Services and Standards Committee Report by HSSC Chair/IHO Secretariat HSSC11-04.2C HSSC comments and proposals for the « Future Strategic Plan of IHO » HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Introduction SPRWG provided a “Draft IHO Strategic Plan” (17th March 2019) where are defined: Strategic Goals Strategic Targets (ST) Strategic Performance Indicators (SPI) HSSC relevant elements of the Future IHO Strategic Plan to be considered HSSC Chairs were asked to provide their comments on ST and SPI

Strategic Targets (ST) Future Strategic Plan Strategic Performance Indicator (SPI) Strategic Targets (ST) Strategic Goal 1 1. Safety and Efficiency of the "transforming navigation" 1.1 Deliver Standards, Product Specificatios, implementation strategy support 1.1.1 S1XX data model and data products implementation strategy/ plan implemented 1.1.2 Paper chart production based on ENCs implemented and standardized 1.1.3 S1XX Support to Autonomous shippig provided 1.2 Develop standards, best practices (eg. cyber security, data quality assessment) 1.2.1 Certified cyber secure data products and services delivered 1.2.3 Very shallow water hydrographic data adequacy assessed HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Strategic Performance Indicator (SPI) Strategic Targets (ST) Future Strategic Plan Strategic Performance Indicator (SPI) Strategic Targets (ST) Strategic Goal 2 2. Developing hydrographical geospatial data use for the benefit of sociey 2.2 Adopt/Promote new tools and methods to increase coverege, contistency amd quality of surveys 2.2.3 S1XX data mode and data products implementation strategy/ plan implemented 2.2..2 Paper chart production based on ENCs implemented and standardized 2.3 Adopt and apply UN guiding principles for geospatial information management ensuring interoperability of Hydrographic data with their marine related data 2.3.3 Very shallow water hydrographic data adequacy assessed HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Future Strategic Plan S.P.I. WG Open topics 1.1.1 NIPWG, S100 WG, ENC WG Draft S-1xx Implementation in preparation 1.1.2 NCWG, ENCWG NCWG role to be evaluated in accordance with paper chart future 1.1.3 S100 WG, NIPWG, ENCWG, DQWG   1.2.1 ENCWG, DQWG 1.2.3 HSPT, DQWG 2.2.1 DQWG 2.2.2 HSPT 2.3.1 S100 WG, NIPWG, DQWG HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Analysis/Discussion (1) Effectiveness of SPI (measurability): general concerns arose about the effectiveness of SPIs and in particular their measurability. A correlated implementation strategy is necessary to achieve the Strategic Targets. Connection with the implementation strategy Under development Connection between S-100 Readiness Levels and SPIs (eg. SPI 1.1.1 - S1XX data model and data products implementation strategy/plan implemented) HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Analysis/Discussion (2) Specific comments about STs, and SPIs provided by WG Chairs Strategic Goal 1: Safety and Efficiency of the “Transforming Navigation” Explain the concept of “transforming navigation” and correlate it with the S-1xx concept Handover point between HSSC and IRCC responsibilities should be defined. Where does HSSC responsibility ends? Requirements of autonomous shipping to be known in advance HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Analysis/Discussion (3) Specific comments about STs, and SPIs provided by WG Chairs Strategic Goal 2: Developing the use of hydrograph geospatial data for the benefit of society Quality indicators should be applied to all sorts of hydrographic data. How to achieve that? Harmonize DQ indicators within S1xx PS DQ indicators used in the marine domain should be used or translated to land based geo- information systems (eg. Ports, channels, rivers, etc…) HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Additional considerations Some HOs currently have limited expertise in data models Who will do what? Man-machine interaction to be built up What about the industry? ISO and other international standards regarding S-1xx aspects of interest should be monitored and WGs should be advised accordingly Who will do that? DQWG could provide advices to IRCC WGs/PTs and communicate with other stakeholders outside the IHO for DQ correlated matters Which are the other main connections with IRRC WGs or other external actors? HSSC-11, Cape Town, South Africa, 6- 9 May 2019

HSSC-11, Cape Town, South Africa, 6- 9 May 2019 Future work programme Current work is on track against the HSSC Work Plan 2020. All HSSC action items are scheduled, already completed or undergoing HSSC WGs were also invited to analyse the draft Future Strategic Plan in preparation of the HSSC Work Programme (2021-2023) HSSC-11, Cape Town, South Africa, 6- 9 May 2019

Action required of HSSC Comments provided represent the first step towards a consolidated contribute paper for the SPRWG The HSSC WGs are invited to: Note this paper Support HSSC Chair in the production of a coordinated HSSC input paper for the SPRWG Be ready to update the HSSC Work Programme in accordance with the revised SP as approved Make any proposal as appropriate HSSC-11, Cape Town, South Africa, 6- 9 May 2019