Sever Hall Consulting Group

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

Technische Universität München + Hewlett Packard Laboratories Dynamic Workload Management for Very Large Data Warehouses Juggling Feathers and Bowling.
Operations Management Maintenance and Reliability Chapter 17
The 4 T’s of Test Automation:
Business Process Improvement in the Economic Programs Directorate at the U.S. Census Bureau Deborah M. Stempowski Shirin A. Ahmed U.S. Census Bureau ICES.
HIV Drug Resistance Training
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Inadvertent perioperative hypothermia
Site Safety Plans PFN ME 35B.
How Reliability Impacts Shareholder Value Bruce Hawkins, CMRP Management Resources Group, Inc.
Quality Management in Diagnostic Imaging
Copyright 2007 EcoSys Management LLC All Rights Reserved. Confidential and Proprietary Information. 1 Integrating Financial Management with Project Management.
Confidential and Proprietary to Food & Restaurant Solutions Int'l LLC Copyright 2010 CASE STUDIES January 1, 2010 Confidential and Proprietary to Food.
NellFinancial Consultant StephenRisk Consultant AmyMarketing Consultant FevziGeneral Consultant TubaMarketing Consultant Hye YoungChief Consultant HakanMarketing.
Fostering Ad-Hoc Collaboration Between Marketing and R&D Departments
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Presentation to ProModel Solutions Conference. INTRODUCING.
OCD Internal and Education and Training Purposes Only A New Approach for You to Create Broader, Long-term Customer Engagements CL12092.
Operations Management: Financial Dimensions
Statistically-Based Quality Improvement
© 2006 Prentice Hall Leadership in Organizations 11-1 Chapter 11 Leadership in Teams and Decision Groups.
Chapter 14: Network Design and Facility Location.
© Prentice Hall CHAPTER 11 Facilitating User Computing.
Chapter 14 Fraud Risk Assessment.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Achieving Innovation and Manufacturing Excellence Program Overview
Process Industries Benchmarking Professor Munir Ahmad School of Science and Engineering Teesside University NEPIC Presentation.
Coordinate implementation of customer service strategies Lecture 2 Payman Shafiee.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Optimizing IT Department Project Portfolio Management (Concurrency Corporation)
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Celia Delgado Biztant, LLC Founder Hiring and Engaging a Virtual Assistant.
What is Business Analysis Planning & Monitoring?
S/W Project Management
EWC A body for workers’ and employer’s co- operation in transnational companies in European Union.
Dtengineering 1 of 16 The Product Development Process Introduction.
Prentice Hall, Inc. © STRATEGIC MANAGEMENT & BUSINESS POLICY 10 TH EDITION THOMAS L. WHEELEN J. DAVID HUNGER CHAPTER 5 Internal Scanning: Organizational.
Industrial Engineering Roles In Industry
Welcome to Lean Six Sigma Green Belt Training
PRODUCT TRANSFER.
Implementing universal Lynch Syndrome screening in a large healthcare system.
Next Doc Project Team: xxxxx Spring TitlePage Scope Statement Mission Statement3 Business Need4 Project Description5-6 Project Lifecycle Approach7.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
ISE Criteria Goals & Constraints Organizational Survival Growth Limits Individual Physiological Psychological Physical / cognitive limitations.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Introduction to Kaizen Introduction Kaizen Facilitation.
Cost Management Session 3. Overview Theory Exercise: 1.39; 1.42; 1.50;
Information System Project Management Lecture three Chapter one
Problem Solving Uxbridge High School Engineering Design Process AKA.
1 LSSG Green Belt Training Improve: How do we get there?
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
TDRp Implementation Challenges David Vance, Executive Director Peggy Parskey, Assistant Director October 23, 2014.
Optimizing IT Department Project Portfolio Management
Dan Austin 2004 COLLABORATIVE PROJECT PLANNING : Leveraging the Collective Wisdom of the Team Small problems are easy to fix, hard to detect. If you let.
The Role of New Markets Advisors in Healthcare Case Study in Medical Devices.
Lau Siang Hua See Shie Ping Terence Leow Shin Woei Ooi Kean Chong Cheong Sheng-En Jonathan Managing Technological Changes.
1 Version /05/2004 © 2004 Robert Oshana Requirements Engineering Analyzing the Problem.
What is HSE Competence Assurance?
Manufacturing Process Reliability: Reducing Process Interruptions
Six-Sigma : DMAIC Cycle & Application
TOPIC : PRODUCT AND SERVICE DESIGN
OPS/571 Operations Management
DMAIC Analyze, Improve, Control
Stevenson 5 Capacity Planning.
Presentation transcript:

Sever Hall Consulting Group Instrumentation Laboratories Medical Device Manufacturing Process December 9, 2010 Presented by: Sever Hall Consulting Group Rita Distel Dustin Esposito Kathryn Holmes Winston Kuo Michael Snitkovsky Davide Zocco

Background Instrumentation Laboratory (part of Werfen Group) Headquartered in Bedford, Massachusetts. Founded in 1959 has operations worldwide. Market leader in diagnostic instruments for real-time blood testing - 40% market share. Primary stakeholders are hospitals. Innovative technology - GEM Premier 4000 cartridges. 285,000 GEM 4000 cartridges projected to be sold in 2010.

Project Scope Background: GEM 4000 cartridges are used during surgery to measure patients physiological parameters and provides real-time information to a surgeon. Scope: Identify the root cause of the source(s) of fiber contamination of cartridge. Propose solution(s) to mitigate fiber contamination. Definition: Intubation is the process of inserting a tube, called an endotracheal tube, into the mouth and then into the airway. This is done so that a patient can be placed on a ventilator to assist with breathing.

Impact of defective cartridge Actual incident: 10/16/2010: Infant at local hospital was intubated due to a cartridge malfunction – improper/inaccurate Oxygen reading. Cartridge evaluation: Fiber contamination on Oxygen sensor.

Impact of Fiber Contamination Cartridges returned by costumer (35%) Cartridges manufactured/yr: 285,000 Defective cartridges/yr: 99,750 Defective cartridges due to fiber contamination/yr: 24,938 Loss: $ 2M/year $80.20/cartridge

Stakeholders

Impact of Key Stakeholders Name Interest Influence Project Support (Verbally) (Actions) (Desired) Expectations Ways to Manage Expectations Michael Project Manager High Strong Plan, schedule and coordinate detailed phases of the engineering work in a multi-departmental initiative to reduce manufacturing variability and increase quality. Mark Director of Operations Needs to gain influence with engineers to validate proposed changes and provide support to obtain financial backing. Doug VP of Operations Weak Provide financial backing and influence from company owners Need to find a more effective method to show a need to spend money to improve the process. Doug expressed strong concerns about the quality but feels that R&D is responsible to propose changes. R&D is currently running an 18-month study. Werfen Group Parent Company, Sponsor Medium Provide financial backing The company is financially stable and profitable. Name Interest Influence Project Support (Verbally) (Actions) (Desired) Expectations Ways to Manage Expectations Michael Project Manager High Strong Plan, schedule and coordinate detailed phases of the engineering work in a multi-departmental initiative to reduce manufacturing variability and increase quality. Mark Director of Operations Needs to gain influence with engineers to validate proposed changes and provide support to obtain financial backing. Doug VP of Operations Weak Provide financial backing and influence from company owners Need to find a more effective method to show a need to spend money to improve the process. Doug expressed strong concerns about the quality but feels that R&D is responsible to propose changes. R&D is currently running an 18-month study. Werfen Group Parent Company, Sponsor Medium Provide financial backing The company is financially stable and profitable. Name Interest Influence Project Support (Verbally) (Actions) (Desired) Expectations Ways to Manage Expectations Michael Project Manager High Strong Plan, schedule and coordinate detailed phases of the engineering work in a multi-departmental initiative to reduce manufacturing variability and increase quality. Mark Director of Operations Needs to gain influence with engineers to validate proposed changes and provide support to obtain financial backing. Doug VP of Operations Weak Provide financial backing and influence from company owners Need to find a more effective method to show a need to spend money to improve the process. Doug expressed strong concerns about the quality but feels that R&D is responsible to propose changes. R&D is currently running an 18-month study. Werfen Group Parent Company, Sponsor Medium Provide financial backing The company is financially stable and profitable. Name Interest Influence Project Support (Verbally) (Actions) (Desired) Expectations Ways to Manage Expectations Michael Project Manager High Strong Plan, schedule and coordinate detailed phases of the engineering work in a multi-departmental initiative to reduce manufacturing variability and increase quality. Mark Director of Operations Needs to gain influence with engineers to validate proposed changes and provide support to obtain financial backing. Doug VP of Operations Weak Provide financial backing and influence from company owners Need to find a more effective method to show a need to spend money to improve the process. Doug expressed strong concerns about the quality but feels that R&D is responsible to propose changes. R&D is currently running an 18-month study. Werfen Group Parent Company, Sponsor Medium Provide financial backing The company is financially stable and profitable. Name Interest Influence Project Support (Verbally) (Actions) (Desired) Expectations Ways to Manage Expectations Michael Project Manager High Strong Plan, schedule and coordinate detailed phases of the engineering work in a multi-departmental initiative to reduce manufacturing variability and increase quality. Mark Director of Operations Needs to gain influence with engineers to validate proposed changes and provide support to obtain financial backing. Doug VP of Operations Weak Provide financial backing and influence from company owners Need to find a more effective method to show a need to spend money to improve the process. Doug expressed strong concerns about the quality but feels that R&D is responsible to propose changes. R&D is currently running an 18-month study. Werfen Group Parent Company, Sponsor Medium Provide financial backing The company is financially stable and profitable. Click through slides to see each row highlighted individually.

Project Timeline and Tasks The first step in creating a accurate and achievable Project timeline was to define the Scope and determine Goals and Objectives. Having a solid understanding of what we were trying to accomplish allowed us to Detail out the requirements and test plan. Using these documents we were able to capture the necessary tasks, assign resources and ensure the schedule was realistic. The team reviewed the timeline in detail internally and with the customer. This limited the risk of scope creep. The team stayed focused on the Critical Path to ensure we met our objectives. Because we took the time up front to plan the work we had no changes to schedule and there fore no Change Management. The project stayed on track, within scope and met the deadlines. 8

Project failure may lead to loss of Market Share Risk Analysis High Risk Identify root cause but not able to determine satisfactory solution. Resource constraints to identify and complete testing. Medium Risk Failure to identify root cause of fiber contamination. Not able to complete the project within the required timeline. Low Risk Identify root cause but not able to obtain financial support to implement the changes. Training required to implement changes maybe too time consuming or IL may be required to modify employees' skill set. Automation equipment does not exist in market place and would need to be custom designed. Required changes may render product no longer financially feasible. Project failure may lead to loss of Market Share

Process Mapping

Performance Metrics What do we measure? Fibers Colorful Transparent Clothes Cardboard boxes Workers (hair, make-up etc..) Transparent Manufacturing process Dust Ventilation system

Implemented Pilot Testing Phase I - Hygiene & Work Environment Hypothesis: Colorful fibers from clothing and paper fibers from cardboard boxes are transferred to the product Wear jump suits instead of lab coats Gloves must be worn at all times No make up/lotions policy Beard nets Cardboard boxes cannot be stored near the cleanroom Sweaters and jackets cannot be stored near the cleanroom Phase II - Work Environment Hypothesis: Frequently opened door allows dust particles to enter the cleanroom and contaminate product Process glass disks in the hood Relocate operation further away from the door Phase III - Process Change Hypothesis: Operators are rushed which may negatively impact quality Decrease batch size by 10% Eliminated rejects due to colorful fibers during in-process inspection Significantly reduced rejects due to dust particles during in-process inspection, from 5.5% to 1.2% The reject rate during in-process inspection increased by 11%

Impact of short-term “pilot study” Defective cartridges due to fiber contamination/yr: 24,938 (8.8%)/ (20,699)(7.3%) $ 2M/year (loss) $ 1.66M/year (loss) Cartridges returned by costumer (35%) Overall fiber contamination rate decreased by 17% upon testing by the simulation lab, translating into potential ~$340,000 annual savings.

Follow-up Retraining of personnel Review current inspection criteria (quality control) and modify SOP/workstation based on more data in conjunction with quality control department Modify new employee application guidelines Conduct brainstorming exercise to identify further process improvement opportunities

Questions?