Tyler Butikofer Associate Engineer II

Slides:



Advertisements
Similar presentations
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Advertisements

Technical Conference Avoided Cost Modeling January 6, 2015.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Unit 2 Day 3: Electric Energy Storage Electric potential energy stored between capacitor plates Work done to add charge to the capacitor plates Energy.
Study Results February 10, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Wholesale Power Price Forecast 01/28/03 Current Trends Update March 11, 2003.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Introduction And Thermal Power Plant
Technical Advisory Subcommittee Quarterly Meeting August 15-16, 2016
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Energy Year 2016 Electricity
RENEWABLES AND RELIABILITY
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
MWG Recommended Hydro Improvement March 7, 2017
Name _____6__ INTRO – Harnessing the Wind Nov__ Page 86-87
2017 Study Program Discussion
Use other resources to generate electricity
Outline Background Study Assumptions Study Results To Do
Teaching The Duck To Fly
Keegan Moyer Interim Manager, Transmission Expansion Planning
Solar Eclipse Overview August 2017
DS-PDWG Approval Items
Outline Modeling Issue 2017 Modeling Goals
Western Electricity Coordinating Council
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Modeling Assumptions for 2033 High Renewable PCM
Tyler Butikofer Associate Engineer II
Western Electricity Coordinating Council
Western Electricity Coordinating Council
ERS Forward Looking Measures 1, 2 & 4
PCM (Production Cost Model) Data Work Group Webinar
MWG Recommended Hydro Improvement March 7, 2017
Western Electricity Coordinating Council
2018 State of the Interconnection Overview
Maggie Peacock, Analyst
Tyler Butikofer Associate Engineer II
Tyler Butikofer, WECC Tom Carr, WIEB
Modeling Subcommittee (MS) Updates
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates
Forecasting and Operations CAISO Case
Tyler Butikofer Associate Engineer II
PCM (Production Cost Model) Data Work Group Webinar
Maggie Peacock, Analyst
Study Results Drought Scenario Study
2018 WECC Loads and Resources Data Request Part 1
Western Electricity Coordinating Council
Western Electricity Coordinating Council
ERS Forward Looking Measures 1, 2 & 4
PDWG Validation of the 2028 ADS PCM V1.0
Types of Energy Chemical Solar.
Data Subcommittee Production Cost Model Data Work Group (PDWG) Update
Tyler Butikofer Tom Carr
Presentation transcript:

Tyler Butikofer Associate Engineer II ADS 2028 Phase 1 V2.1.1 ADS 2028 Phase 2 V1.1 Tyler Butikofer Associate Engineer II Western Electricity Coordinating Council

Western Electricity Coordinating Council ADS 2028 Phase 1 V2.1.1 Updates Starts with ADS V2.0 Northwest wheeling rates updated Updated AZPS hourly load profile Made all nuclear units must run Alberta co-gen units non-spill Remove duplicate Alberta generators EPE general edits Klondike Wind III and Nine Canyon Wind capacities updated Western Electricity Coordinating Council

Western Electricity Coordinating Council ADS 2028 Phase 2 V1.1 Updates Starts with ADS 2028 Phase 1 V2.1.1 Retires 3,276 MW of thermal generation Adds 4,906 MW of generation Wind: 2138 MW Solar: 2093 MW Battery Storage: 100 MW / 400 MWh Internal Combustion: 189 MW Western Electricity Coordinating Council

Generation Changes (Both cases have the NW wheeling changes) Western Electricity Coordinating Council

Western Electricity Coordinating Council Dump Energy (MWh) Region ADS 2028 Phase 1 V2.0 ADS 2028 Phase 1 V2.1.1 (Includes NW wheeling changes) ADS 2028 Phase 2 V1.1 (Includes NW wheeling changes) Phase 2 V1.1 - Phase 1 V2.1.1 AESO 92,715 75,782 89,884 14,102 BCHA 3,806 7,363 10,217 2,854 CAISO 420,990 1,295,907 1,404,181 108,274 ColumbiaGrid 53,457 52,424 61,596 9,171 NTTG 86,250 109,611 161,710 52,099 WestConnect 83,304 126,578 221,196 94,618 Total 740,522 1,667,665 1,948,783 281,118 Western Electricity Coordinating Council

Regional Transfers (Both cases have the NW wheeling changes) Western Electricity Coordinating Council

ADS 2028 V2.1.1 Sensetivity (Unchanged NW Wheeling Rates) Ran sensitivity reverting back to the same NW wheeling rates as ADS 2028 V2.0. All other data and modeling assumptions remain the same as ADS 2028 V2.1.1 Western Electricity Coordinating Council

Dump Energy Changes Due to NW Wheeling Charge Changes Region ADS 2028 Phase 1 V2.1.1 (Unchanged NW Wheeling Rates) ADS 2028 Phase 1 V2.1.1 (NW Wheeling Rates Set to Zero) Phase 1 V2.1.1 Wheeling Zero - Unchanged AESO 69,070 75,782 6,712 BCHA 7,315 7,363 48 CAISO 502,804 1,295,907 793,103 ColumbiaGrid 59,874 52,424 -7,450 NTTG 89,081 109,611 20,530 WestConnect 94,413 126,578 32,166 Total 822,558 1,667,666 845,108 Dump energy increased in Southern California and decreased in Northern California Western Electricity Coordinating Council

Regional Transfers NW Wheeling Changes Western Electricity Coordinating Council