Accelerator Plans at SLAC John T. Seeman For the PEP-II Team e + e - Super-B-Factory Workshop Hawaii, USA January 19, 2004.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
Accelerator Plans at KEK
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Accelerator R&D for the Super-B Factory
SuperB Injection, RF stations, Vibration and Operations
Linac possibilities for a Super-B
Electron cloud and collective effects in the FCC-ee Interaction Region
First Look at Nonlinear Dynamics in the Electron Collider Ring
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II Status and Plans e+e- Factories Workshop
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
AC Power for a Super-B Factory
Summary of Washington DOE Review
Overall Considerations, Main Challenges and Goals
Super-B Accelerator Overview
SuperB IRC Meeting Frascati, Nov. 13th 2007
Super-B Factory in a “4400m” Tunnel
Proposal for a CESR Damping Ring Test Facility
CEPC SRF Parameters (100 km Main Ring)
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Electron Collider Ring Magnets Preliminary Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Performance and Accelerator R&D
IR/MDI requirements for the EIC
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Accelerator Plans at SLAC John T. Seeman For the PEP-II Team e + e - Super-B-Factory Workshop Hawaii, USA January 19, 2004

Thanks Many people helped with the results here: –A few of them: M. Sullivan, U. Wienands, –S. Novokhatski, S. Heifets, S. Ecklund, A. Fisher, –Y. Cai, Y. Nosochkov, D. Hitlin, A. J. S. Smith, –J. Fox, D. Teytelman, Y. Yan –and the PEP-II team

Topics PEP-II Status Lessons learned from the two B-Factories PEP-II luminosity keeping the present RF frequency 476 MHz but allowed to change IR and LER vacuum chambers. Luminosity with an RF frequency change (952 MHz) but allow a change to the IR, most ring magnets, and all vacuum systems. Power losses versus luminosity Total site power Conclusions

The PEP-II e + e - asymmetric collider

e + e - e e Luminosity signal Fast Luminosity Monitor The luminosity of each bunch is measured to a few percent every second.

PEP-II Summer 2003 Projects New HER # 8 RF station (+200 mA). New HER collimator (30 m upstream). Improved low level RF feedback circuits (higher I). More x-y BPMs in IR2 region. LER straight section and Arc 11 solenoid upgrade. Octupoles for tune shift with amplitude studies. Bellows fans on all LER bellows (~240) IR4 HOM damper

PEP-II Betatron Tune Locations Old tunes LERHER New tunes Old tunes

Dynamic - Half Integer Resonance Y. Cai a la Hirata

Fall – Winter Improvements Number of bunches: –June 2003: 1030 bunches in the by-3 pattern. –January 2004: 1317 bunches in the by-2. HER and LER RF stations added to beam. –I - to 1376 mA peak. –I + to 2430 mA peak. Trickle charging –All data now taken in trickle charge mode (LER only). HER beta-y* –Beta-y* lowered from 12 to 10 mm in January.

PEP-II Luminosity versus number of bunches Increase number of bunches then improve the specific luminosity and add beam current Luminosity increased faster than N. October 2003

Electron Cloud Instability and Multipacting

50 Gauss solenoid section

No sextupole and arc chambers

By-2 bunch pattern in October Parasitic collision effect ECI

Solenoid fields have reduced the ECI effect Fall 2003: by-3 bunch pattern shows very little ECI. November 2003: by-2 pattern with short mini-trains show little ECI.

Best Day before Continuous Injection 424/pb

Continuous injection of LER with BaBar running Constant LER e + current Luminosity is more constant November 2003

PEP-II Best Day Dec. 7, /pb

Peak luminosity of 7.18 x New Peak Luminosity In December

PEP-II Peak Luminosity Per Month since Peak!

162/fb

2003 improvements to come: Fix HER beta beat Lower LER y * from 12 to 10 mm Online model updates Power LER solenoids when needed Use HER/LER octupoles Raise beam currents Improve optical corrections (dispersion …)

Directors Goals for PEP-II Year Peak Luminosity (x10 33 ) Total Integrated Luminosity (fb -1 ) Fall Fall Fall Fall

Beam Parameters Goals June 2003: 1.45A x 1.1 A y *=12 mm 1034 bunches L=6.6E33 July 2004: 2.7A x 1.6 A y *=9 mm 1450 bunches L=12.1E33 June 2005: 3.6A x 1.8 A y *=8.5 mm 1500 bunches L=18.2E33 July 2006: 3.6A x 2.0 A y *=6.5 mm 1700 bunches L=23.0E33 July 2007: 4.5A x 2.2 A y *=6 mm 1700 bunches L=33.E33 With good integration reliability: 100 fb -1 more integrated by Summer fb -1 total integrated by Fall About 1 to 1.4 ab -1 integrated by Fall 2009.

Meters Centimeters Possible 3x10 34 Interaction Region with a ±3.25 mrad Xangle M. Sullivan Jun. 14, 2000 QD1 QD4 QF5 QF2 QD4 QF5 QD1 QF2 Extra focusing Extra focusing 3.1 GeV 9 GeV PEP-II upgrade with Permanent Magnet Quadrupoles

Planning for the Far Future of PEP-II Finish near term upgrades (~ ) Decide soon what far future PEP-II configuration to concentrate on.

Recent Activities for Far Future SLAC Scenarios Studies gave much attention to participation in a Super-B-Factory. May Particle Physics Workshop with High Luminosity e + e - Colliders in May 2003 ICFA Beam Dynamics Workshop on High Luminosity Colliders October 2003 October Particle Physics Workshop with High Luminosity e + e - Colliders in October 2003 PEP-II-BaBar Roadmap Committee started. Hawaii Super-B Workshop in January

December: Combined Roadmap Study Group on Detector and Accelerator "We are considering various scenarios, based on high luminosity machines with luminosities ranging from 2x10 35 to cm -2 s -1, with the aim of advising the BaBar Collaboration on the optimal choice, taking into account the physics case, other competing experiments, timescales, cost, and human resources."

Luminosity Equation y is the beam-beam parameter (~0.08 now) I b is the bunch current (1 ma x 2 ma) n is the number of bunches (~942) y * is the IP vertical beta (~11 mm) E is the beam energy (3.1 and 9 GeV) Luminosity is about 6.11 x cm -2 s -1

Luminosity Equation When vertical beam-beam parameter limited. y ~ 0.06 in PEP-II and KEKB. To raise luminosity: lower y *, raise I & y.

Lessons learned from the present B-Factories Asymmetric beam energies work well. Energy transparency conditions are relatively weak. Asymmetric interaction regions can be operated. IR backgrounds can be handled though are not easy. High current RF can be operated. (1A x 2 A). Bunch-by-bunch feedbacks work (4 nsec spacing). Beam-beam tune shifts reached 0.08 (v) to 0.10 (h). Injection rates good. Continuous injection feasible. Electron Cloud Instability (ECI) ameliorated for now!

New techniques of the Next Generation B-Factory Beam lifetimes will be low continuous injection. (Seeman) Very low y * (6 to 10 mm 2 to 3 mm). (Sullivan) Higher tune shift (trade beam-beam lifetimes for tune shifts) (Seeman) Higher beam currents (x 10 or so). (Novokhatski, Teytelman) Higher frequency RF (more bunches). (Novokhatski) Bunch-by-bunch feedbacks at the 1 nsec scale. (Teytelman) Very short bunch lengths (2 mm). (Novokhatski) High power vacuum chambers with antechambers and improved or no bellows. (Soon to start) Reduce energy asymmetry to save wall power.

PEP-II Copper Vacuum System: 3 A at 9 GeV Cu chambers absorbing 100 W/cm of synchrotron radiation Total SR power = 5 MW in the HER

LER Magnets and Aluminum Vacuum System: 3 A at 3.5 GeV Magnets made by our Chinese IHEP collaborators Antechambers Reduce Electron- Cloud-Instability High power photon stops LER SR power = 2 MW.

IR for a B-Factory

New IR magnet design (Parker)

New IR magnet design Quadrupole, anti-solenoid, skew quadrupole, dipole and trims located in one magnet. All coils numerically wound on a bobbin.

Power Scaling Equations Synch rad ~ I E 4 / Resistive wall ~ I 2 total /r 1 /f rf / z 3/2 Cavity HOM ~ I 2 total /f rf / z 1/2 Cavity wall power = 50 kW Klystron gives 0.5 MW to each cavity Magnet power ~ gap~r 1

HOM Calculation for a 476 MHz Cavity with a larger beam opening (Novokhatski)

Advanced B Factory using PEP-II RF Frequency Keep present RF frequency = 476 MHz. Go to 8 x 3.5 GeV with 11 A x 4.8 A. HER current limited to 4.8 Amps using present vacuum chamber. New LER vacuum chambers with antechambers for higher power (x 4). LER current limited to 11 Amps to match HER beam-beam. Keep present arc magnets but add magnets to soften losses. New bunch-by-bunch feedback for 3400 bunches (every bucket) at 2 nsec spacings. (We are presently designing a feedback system for nsec spacing.) Push y * to 4 mm: need new IR (SC quadrupoles) Save on costs by adding to present RF, keeping HER/LER magnets (with some additions). Same HER vacuum system (mostly).

Advanced B Factory with 476 MHz RF Frequency E - = 8 GeV E + = 3.5 GeV I- = 4.8 A I+ = 11 A y * = 3.7 mm x * = 25 cm Bunch length = 4 mm Crossing angle = ~15. mrad Beam-beam parameters = 0.10 N = 3450 bunches L = 2 x cm -2 s -1 Site power with linac and campus = ~85 MW.

Advanced B Factory with New RF Frequency Higher RF frequency provides for more bunches. Better for resistive wall losses, Touschek lifetime, single bunch instabilities, lower beam emittance, perhaps lower parasitic beam-beam effects, less peak synchrotron radiation heat stress, … Choose frequency related to linac frequency 2856 MHz: –A good choice is 952 MHz.

Advanced B Factory with 952 MHz RF Frequency E + = 8 GeV E - = 3.5 GeV I+ = 6.8 A I- = 15.5 A y * = 1.5 mm x * = 15 cm Bunch length = 1.8 mm Crossing angle = ~15. mrad Beam-beam parameters = 0.11 N = 6900 bunches L = 7 x cm -2 s -1 Site power with linac and campus = ~100 MW.

Advanced B Factory with 952 MHz RF Frequency E + = 8 GeV E - = 3.5 GeV I+ = 10.1 A I- = 23.0 A y * = 1.5 mm x * = 15 cm Bunch length = 1.8 mm Crossing angle = ~15. mrad Beam-beam parameters = N = 6900 bunches L = 1 x cm -2 s -1 Site power with linac and campus = ~120 MW.

Calculation of the Total Site Power vs Luminosity and RF frequency Assume the Campus, SPEAR, Linac plus PEP-II magnets sums to 40 MW (~35 MW now). Beam power losses come from the resistive wall effect, synchrotron radiation, and higher order mode losses in the cavities and other chambers. Assume bunch lengths are fixed. Assume the number of bunches are fixed. Scale the currents linearly with the luminosity adjusting the emittance to keep the beam-beam parameters at Assume the RF power supply and RF klystron have a combined efficiency of 45% and that a klystron delivers 450 kW to each cavity.

Site Power including Linac and Campus for Two RF Frequencies 476 MHz 952 MHz (Linac, PEP-II magnets and campus power = 40 MW)

Possible Super-PEP-II Timeline

Conclusions PEP-II has reached a luminosity of 7.2 x It has integrated 481/pb in one day with trickle injection. Near term upgrades are going well. The parameters of a Super-PEP-II were studied with RF frequencies of 476 MHz and 952 MHz. At the present, for about 100 MW of total power, linac and campus included, 476 MHz provides a luminosity of about 2 to 4 x and 952 MHz provides about 0.7 to 1.0 x Beam-beam parameters are 0.11.