System Engineering (Pratham and beyond)

Slides:



Advertisements
Similar presentations
1 Introducing the Specifications of the Metro Ethernet Forum.
Advertisements

Bentley’s Substation Design Solution Al Gray
Routed Systems Presented by: Bassam Najar, Design Engineer Butler International Inc.
Lecture 10: Configurations Jason Mickey For AE 440 A/C Lecture September 2009.
SEE System Design Product Presentation The Computer-Aided Design Specialist dedicated to Electrical Engineering, Systems and Industrial Fluids.
Pratham, IITB Student Satellite Saptarshi Bandyopadhyay System Engineer, Pratham IIT Bombay 27 th August, 2008.
Fahri BaturOctober 2013 SAP GRC AC ARA Access Risk Analysis Requirements Gathering Workshop.
Technology Solutions, LLC MU April Thompson – Project Manager Neera Desai – Operations Advisor Charles Lively – Technical Advisor.
Saptarshi Bandyopadhyay Project Manager and System Engineer Pratham, IIT Bombay 15 th May, 2011.
Numbers
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
> >
The Project at a Glance... Project budget of $1000 Power provided by existing 5.0V EVB power supply Previous design has been wire wrap assembled to serve.
1. We advance your product to series production From design to product We are with you From theory to practice We help when things get tight Our other.
Electronic Component Functions What is this component doing my in electronic device?
Feature Synopsis Tight integration to Oracle Application SSHR. Dynamic selection of offer benefits with varying combinations of grade, category, gender.
Pratham IITB Student Satellite
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Best Practices By Gabriel Rodriguez
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
By Mircea Jivoin. Objectives Achieving the warehouse management over the internet using the SOAP Web Services Achieving the warehouse management over.
NATIONAL INSTITUTE OF SCIENCE & TECHNOLOGY VIRTUAL INSTRUMENTATION BIBHU SANTOSH ROUT EI [1] VIRTUAL INSTRUMENTATION by Bibhu Santosh Rout Roll.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
HARDING UNIVERSITY A Study of Atmospheric Properties as a Function of Altitude Flying Bison.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Namas Chandra Introduction to Mechanical engineering Chapter 4-1 EML 3004C CHAPTER 5 Engineering Design Tools.
SCA Bindings Simon Holdsworth Piotr Przybylski. Agenda n SCA Bindings Overview l Bindings TC Charter n Bindings l Web Services Binding l JMS Binding l.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
8:15 AM Tuesday September 15, 2009 Karl Frank, Point of Contact for Constellation Projects Validating Integration Requirements Diagrams for illustrative.
Capturing the requirements  Requirement: a feature of the system or a description of something the system is capable of doing in order to fulfill the.
Main Issues Three major issues that we are concerned with in sensor networks are – Clustering Routing and Security To be considered against the backdrop.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Design of an Integrated Robot Simulator for Learning Applications Brendon Wilson April 15th, 1999.
REVEAL Instrument Overview What is REVEAL? Prototype strap-down (vehicle-independent) instrumentation system REVEAL provides the traditional (manned) airborne.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Chapter 12 The Network Development Life Cycle
A Deep-Ocean Exploration ROV For the Okeanos Explorer
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
© Questionnaire 27 th September 2010.
Chapter 7 Lecture 1 Design and Implementation. Design and implementation Software design and implementation is the stage in the software engineering process.
Functional System Simulation in support of System (Design) Verification Harald Eisenmann Incose International Workshop 2013 ASTRIUM CONFIDENTIAL.
Cloudland Instruments Hawkeye Electronics Snapshot March 10th, 2016.
Transistors to Gates © 2011 Project Lead The Way, Inc.Magic of Electrons.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Native Command Queuing (NCQ). NCQ is used to improve the hard disc performance by re-ordering the commands send by the computer to the hard disc drive.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
I made service graph template for EPG to EPG
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Rational Unified Process
“Changes in Altitude” SMCC Payload Design and Data Collection.
Software Development Process
THANK YOU!.
IPMA Portal Presentation
Thank you.
Thank you.
Requirements Document
Process for Organising Software Development Activities
Group1: AlbertaSat OBC Software
Cost Estimation.
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
For More Details:
<Your Team # > Your Team Name Here
Presentation transcript:

System Engineering (Pratham and beyond) - Saptarshi Bandyopdhyay

Major Functions System Requirements on each Sub-System Sub-System Requirements to each Sub-System (get detailed simulation results wherever necessary) Configuration Layout (internal and external) Routing of wires within the Satellite Maintain Weight Budget, Power Budget and Data Budget Nomenclature to sides, position of components, Axis definition Integration sequence Maintain document of Interface, connectors and wires

Sub-System Requirements Struct Power Control Comm OBC Payload

Thank You