Proposal for Decommissioning and Replacement of Automated Cutting Device Fernando Cabrera Shahid Lakhwani Fred Mazzeo Leah Smith Valerie Volpe.

Slides:



Advertisements
Similar presentations
Applications of Money-Time Relationships
Advertisements

Capital Budgeting Problems
Capital Budgeting Problem Examples
Impact of Taxes on Replacement Decisions
Engineering Economics in Canada
The Time Value of Money.
Capital Budgeting Capital Budgeting: How managers plan significant outlays on projects that have long-term implications (such as the purchase of new equipment.
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CHP V-ANNUAL WORTH ANALYSIS CE ECONOMIC DECISION ANALYSIS.
CF Winter Questions 1. What cash flows should I consider? 2. How does the market set r ? 3. How should I set r ?
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Cost and Time Value of $$ Prof. Eric Suuberg ENGINEERING 90.
Last Study Topics What To Discount IM&C Project. Today’s Study Topics Project Analysis Project Interaction – Equivalent Annual Cost – Replacement – Project.
TM 661 Engineering Economics for Managers
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Cost Estimation Of A Heat Exchanger Group Members Chinthaka Perera Chris Peng Sandy Lee Terry Peters 540:343 Engineering Economics Spring 1998.
FINAL EXAM REVIEW Fall Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present Worth.
F305 Intermediate Corporate Finance
Establishing the Planning Horizon
Present Worth Analysis Lecture slides to accompany
1 Reviewing… Net Present Worth: Used to select among alternative projects. Used to compare mutually exclusive alternatives. If all expenses and revenues.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-2 Comparison of Alternatives Establishing the Planning Horizon.
Lecture slides to accompany
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
MER1601 MER Design of Thermal Fluid Systems Engineering Economics – Comparing Alternatives Professor Bruno Winter Term 2005.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
Analysis of Engineering Business Decisions
AW involves converting all cash flows into an A value The AW for one life cycle is the same AW for 2,3,4, or or an infinite number of life cycles,as long.
EGR Rate of Return Analysis Rate of Return (ROR) is the rate paid on the unpaid balance of borrowed money, or the rate earned on the unrecovered.
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
ENGR 112 Economic Analysis II. Engineering Economic Analysis Time Value of Money $1 today is more valuable than $1 a year later Engineering economy adjusts.
Chapter 8 Long-Term (Capital Investment) Decisions.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
InvestmentWorth Investment Worth. Investment Worth MARR Suppose a company can earn 12% / annum in U. S. Treasury bills No way would they ever invest in.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
By Muhammad Shahid Iqbal Module No. 08 Present Worth Method of Comparison Engineering Economics.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
AW involves converting all cash flows into an A value The AW for one life cycle is the same AW for 2,3,4, or or an infinite number of life cycles,as long.
ENGM 661 Engineering Economics for Managers InvestmentWorth Investment Worth.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Comparing Economic Alternatives Using time value of money to choose between two or more options.
NPV and Capital Budgeting
Variations in Present Worth Analysis
Lecture slides to accompany
Evaluation Alternatives Present Worth Analysis
Present Worth Analysis Lecture slides to accompany
Evaluation Alternatives Present Worth Analysis
Present Worth Analysis
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 7 Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Present Worth Analysis Lecture slides to accompany
By Muhammad Shahid Iqbal
Replacement HW Problem
Present Worth Analysis Lecture slides to accompany
Lecture slides to accompany
Lecture slides to accompany Engineering Economy, 8th edition
Lecture slides to accompany
By Muhammad Shahid Iqbal
Lecture slides to accompany
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Example Problem A company is considering the purchase of a new piece of testing equipment that is expected to produce $8,000 additional income during the.
Incremental Analysis Examples
Presentation transcript:

Proposal for Decommissioning and Replacement of Automated Cutting Device Fernando Cabrera Shahid Lakhwani Fred Mazzeo Leah Smith Valerie Volpe

Introduction: n Air n Air Cruisers Company: –Manufacturer –Manufacturer of: n Evacuation n Evacuation Equipment for aerospace industry –inflatable –inflatable evacuation slides –life –life jackets rafts –helicopter –helicopter floats

Introduction: (Contd) n Cutting Devices: –Three Choices (+ 1 old machine for reference) - Gerber GGT S-95 - CEI DCS Gerber GGT S Eastman Cutting Systems EC3X2

Cutting Devices: I CEI Corporation: DCS-3500

Cutting Devices: II Gerber S-3200

Cutting Devices: III Eastman EC3X2 Dual Gantry Cutting System

Initial Selection of Machines: n Initial & Maintenance costs: – available for: n Gerber (current machine) n Gerber S-3200 n CEI DCS-3500 –not available for: n Eastman EC3X2 Eastman EC3X2 not considered for purchase

Assumptions: n Repeatability n MARR 20% n All machines have EQUAL output n Pre-tax calculations n Ten year life cycle n Do nothing NOT an option Buyers perspective

Cash Flow Diagrams: Current Machine PW(i%) = I + ( X(P/F, i%, n) ) n = year of cost MARR = 20% AW(i%) = PW(i%) (A/P, i%, N) Gerber GGT-S95

Cash Flow Diagrams: Alternative I PW(i%) = I + ( X(P/F, i%, n) ) n = year of cost MARR = 20% AW(i%) = PW(i%) (A/P, i%, N) CEI DCS-3500

Cash Flow Diagrams: Alternative II MARR = 20% PW (i%) = I + X(P/A, i%, N) I = Initial investment X = Annuity value N = time in Years AW(i%) = PW(i%) (A/P, i%, N) Gerber S-3200

Present Worth, Annual Worth: I n Current Machine: –Gerber GGT-S95: n PW (10%) = - $ 266, n PW (20%) = - $ 259, n PW (30%) = - $ 255, n AW (10%) = - $ 43, n AW (20%) = - $ 61, n AW (30%) = - $ 82,770.00

Present Worth, Annual Worth: II n Alternative I: –CEI, DCS-3500: n PW (10%) = - $ 244, n PW (20%) = - $ 213, n PW (30%) = - $ 193, n AW (10%) = - $ 39, n AW (20%) = - $ 50, n AW (30%) = - $ 62,750.00

Present Worth, Annual Worth: III n Alternative II: –Gerber S-3200: n PW (10%) = - $ 191, n PW (20%) = - $ 176, n PW (30%) = - $ 168, n AW (10%) = - $ 31, n AW (20%) = - $ 42, n AW (30%) = - $ 54,379.00

Summary: Annual Worth Present Worth Therefore Choose Gerber S-3200 to Minimize Costs

Questions ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?