Load Participation in SCED v1 Overview & Refresher

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Loads Acting as a Resource Relationships with QSEs and LSEs
“Rethinking” Ancillary Services in ERCOT and Efforts to Incorporate “Loads In SCED” ERCOT Staff Operator Training Seminar Spring 2014.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
April 23, 2014 DSWG Loads in SCEDv1 Load Participation in SCED v1 Overview & Refresher ERCOT Staff.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Sai Moorty ERCOT Integration Options into ERCOT systems.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Nodal Protocol Revision Request (NPRR) TITLE: Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin March.
August 8, 2013 Loads in SCED Workshop II Load Participation in SCED NPRR 555 ERCOT Staff Presentation.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
Market Trials Update NATF March 2,
Wind Management at MISO
Exceptional Fuel Costs in LMP
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Market Design & Operations
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
RTDF Overview of Data Analysis & Status of “Consesus Items”
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Market Notice Regarding Off-line Units
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Flexible Forward Contracts for Renewable Energy Generators
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

Load Participation in SCED v1 Overview & Refresher ERCOT Staff DSWG Loads in SCEDv1 April 23, 2014

NPRR 555 – Load Resource Participation in SCED Loads in SCED v1 Three-legged stool: NPRR 555 – Load Resource Participation in SCED NPRR 532 – Load Resource Participation in Non-spin Other Binding Document – Aggregate Load Resources All were approved in Sept. 2013 and will go live on June 1, 2014 NOTE: ERCOT is proposing modifications to OBD On TAC agenda for April 24 (tomorrow) April 23, 2014 DSWG Loads in SCEDv1

Existing or new single-site Controllable Load Resources (CLRs) High-level summary Eligibility to participate: LSE QSEs representing Load Resources capable of following 5-minute SCED base point instructions Existing or new single-site Controllable Load Resources (CLRs) SCED qualification will be a new attribute for redefined CLR Aggregate Load Resources (ALRs) composed of multiple sites within single ERCOT Load Zone (subset of CLR) Will not support direct participation by third-party DR QSEs Will not support DR with temporal constraints or block energy bids If LR’s bid is on the margin, base point instructions could require LR to move up or down incrementally every 5 minutes to any level between its LPC and MPC SCED will honor LR’s telemetered ramp rates April 23, 2014 DSWG Loads in SCEDv1

High-level summary (cont.) QSEs with LRs in SCED will submit Bids to buy (not Offers to sell) Bids will reflect LR’s willingness to consume “up to” a specified five-minute Load Zone LMP May be a curve or a MW bid at single strike price Bid will modify the SCED demand curve and have ability to set price SCED Generation to be Dispatched (GTBD) will be adjusted to accommodate LR participation This will ensure proper price formation and reduce the likelihood of oscillating dispatch instructions Bids from LRs capped at the System Wide Offer Cap This is to avoid stranded AS and PRC ‘Bid to buy’ creates settlement outcomes equivalent to the “volumetric flow” LMP minus G methodology endorsed by TAC, while avoiding need for ERCOT to “send back” the DR value to the LSE SCED will dispatch LRs for power balance and congestion management using the applicable Load Zone Shift Factor April 23, 2014 DSWG Loads in SCEDv1

High-level summary (cont.) LR benefits and opportunity: Avoided cost of consumption above specified price Price certainty due to ERCOT dispatch Eligibility to provide Non-spin Treated similarly to Offline Generation providing Non-spin Energy Bids will be released to SCED within 20 minutes following ERCOT deployment of Non-spin Eligibility to receive ORDC payments/charges ORDC price adders (June 1 implementation) will be paid to QSE for any un-deployed SCED capacity in excess of AS responsibility QSE will be charged for AS capacity converted to energy by ERCOT See Protocol Section 6.7.4 Real-Time Ancillary Service Imbalance Payments or Charge Market impacts: LR Bids may set price in the RTM No make-whole payments No load ratio share uplifts to market for DR value April 23, 2014 DSWG Loads in SCEDv1

High-level summary (cont.) For ALRs, participation in SCED and Non-spin are both contingent on validation by ERCOT of the QSE’s telemetry at time of LR qualification, and spot-validation thereafter For SCED and Non-spin, telemetry will validate against revenue-grade 15-minute interval meter data OBD describes this process Telemetry from LRs providing Non-Spin must include Scheduled Power Consumption and SPC+2 Allows baseline-style M&V and verification of AS responsibility M&V for LR in SCED for energy only does not require use of SPC and SPC+2 ALR population management and other data submission requirements described in PR 117-01 document, here: http://www.ercot.com/calendar/2014/04/20140409-WMS April 23, 2014 DSWG Loads in SCEDv1

Load Resource Types & Eligible Services LR Type Qualification Eligible Service / Resource Status Non-Controllable Load Resource (NCLR) NCLR Under-Frequency Relay + 10-minute response RRS (≤ 50%) ONRL Controllable Load Resource (CLR) CLR Primary Frequency Response (PFR) & respond to Reg deployments Reg-Up Reg-Down ONRGL PFR & follow SCED 5-minute dispatch RRS ONCLR or ONRGL* Follow SCED 5-minute dispatch Non-Spin Aggregated Load Resource (ALR) may be a CLR or an NCLR * If carrying Regulation responsibility. April 23, 2014 DSWG Loads in SCEDv1

LRs in Ancillary Services & SCED RRS and Non-Spin from CLR will be deployed via economic dispatch of DR capacity via SCED CLR will have RTM Energy Bid that covers the RRS and/or Non-Spin capacity released to SCED Also can optionally bid additional DR capacity for SCED dispatch SCED will only consider CLR for dispatch if its telemetered Resource status is ONCLR or ONRGL Cannot be OUTL if carrying AS responsibility unless QSE moves responsibility to a different Resource No change to existing participation in RRS by UFR-type Load Resources UFR-LR-RRS may still be deployed manually in EEA 2 No change to existing ERS April 23, 2014 DSWG Loads in SCEDv1

CLR with Bid to Buy: SCED Objective & Power Balance SCED optimization will minimize cost of dispatch of supply and maximize revenue from demand while meeting Power Balance Minimize { Sum(OfferPricegen * BasePointgen) – Sum(BidPriceLR * BasePointLR) } BasePointgen is instruction on how much to produce BasePointLR is instruction on how much to consume NPFLR is current telemetered real power consumption All Resources can follow 5 minute SCED Base Points Power Balance Constraint: Supply=Demand Supply = Sum (BasePointgen) Demand = GTBD = Inelastic Demand + Elastic Demand Inelastic Demand = GTBD - Sum(NPFLR) Elastic Demand = Sum (BasePointLR) Sum (BasePointgen) = GTBD - Sum(NPFLR) + Sum (BasePointLR) April 23, 2014 DSWG Loads in SCEDv1

Example of SCED outcome: CLR with Bid to Buy G1 Offer to Sell: 60,000 MW @ $50/MWh G2 Offer to Sell: 2,000 MW @ $300/MWh LR Bid to Buy: 1,000 MW @ $200/MWh  willingness to consume up to 1,000 MW if LMP at or below $200/MWh No ramp rate limitations for any Resource All Resources follow 5 minute SCED Base Points LR Base Point is instruction on how much to consume   t t+5 t+10 t+15 t+20 t+25 LMP 50 200 300 Inelastic Demand 58,500 59,700 60,050 60,125 59,075 NPF_LR 1,000 925 GTBD 59,500 60,700 60,350 59,425 BP_G1 60,000 BP_G2 125 BP_LR April 23, 2014 DSWG Loads in SCEDv1

Example of SCED outcome: CLR with Bid to Buy $/MWh Demand Curve t,t+25 t+15 Supply Curve t+20 t+5 t+10 300 200 50 MW 59 K 60 K 62 K April 23, 2014 DSWG Loads in SCEDv1

CLR-ALR Telemetry Requirements (1 of 2) From Protocols 6.5.5.2 as amended by NPRRs 555 & 532: A QSE representing a Load Resource shall provide the following Real-Time data to ERCOT for each Load Resource. (Net real power consumption, Low Power Consumption (LPC) and Maximum Power Consumption (MPC) shall be telemetered to ERCOT using a positive (+) sign convention): (a) Load Resource net real power consumption (in MW); (b) Any data mutually agreed to by ERCOT and the QSE to adequately manage system reliability; (c) Load Resource breaker status; (d) Low Power Consumption (LPC) (in MW); (e) Max Power Consumption (MPC) (in MW); (f) Ancillary Service Schedule (in MW) for each quantity of RRS and Non-Spin; (g) Ancillary Service Resource Responsibility (in MW) for each quantity of Reg-Up and Reg-Down for Controllable Load Resources, and RRS and Non-Spin for all Load Resources; (For purposes of the upcoming examples, net real power consumption = NPF.) April 23, 2014 DSWG Loads in SCEDv1

CLR-ALR Telemetry Requirements (2 of 2) From Protocols 6.5.5.2 as proposed to be amended by NPRRs 555 & 532 (cont’d): (h) The status of the high-set under-frequency relay, if required for qualification; (i) For a Controllable Load Resource or a Load Resource providing Non-Spin and selecting the baseline performance evaluation methodology described in paragraph (f)(ii) of Section 8.1.1.4.3, Non-Spinning Reserve Service Energy Deployment Criteria, the Scheduled Power Consumption (SPC) that represents zero Ancillary Service deployments; (j) For a single-site Controllable Load Resource with registered maximum interruptible Demand response capacity of ten MW or greater, net Reactive Power (in MVAr); (k) Resource Status (Resource Status shall be ONRL if high-set under-frequency relay is active); and (l) Reg-Up and Reg-Down services participation factor, which represents how a QSE is planning to deploy the Ancillary Service energy on a percentage basis to specific qualified Resource. (m) For a Load Resource providing Non-Spin and selecting the baseline performance evaluation methodology described in paragraph (3)(f)(ii) of Section 8.1.1.4.3, “Scheduled Power Consumption Plus Two Hours (SPC+2),” representing the QSE’s forecast of the Load Resource’s instantaneous power consumption for a point two hours in the future. April 23, 2014 DSWG Loads in SCEDv1

Residential CLR-ALR Telemetry Values Example 1 This example assumes no AS responsibility and no SCED dispatch Aggregated whole-house Load = MPC = SPC = NPF Aggregated whole-house Load minus DR capability = LPC DR capability (MW bid) MW “Firm load” (not DR-capable) Time April 23, 2014 DSWG Loads in SCEDv1

Residential CLR-ALR Telemetry Values Example 2 This example assumes an AS responsibility but no SCED dispatch If CLR is carrying AS responsibility, SPC+2 values should project MPC/SPC for a point two hours into the future Aggregated whole-house Load = MPC = SPC = NPF Aggregated whole-house Load minus DR capability = LPC DR capability (MW bid) MW “Firm load” (not DR-capable) Time April 23, 2014 DSWG Loads in SCEDv1

Residential CLR-ALR Telemetry Values Example 3 This example assumes an energy-only SCED dispatch (no AS responsibility) Aggregated whole-house Load = NPF Aggregated whole-house Load = NPF = MPC = SPC Baseline = SPC = MPC SCED Base point sent Aggregated whole-house Load minus DR capability = LPC SCED DR obligation DR capability (MW bid) MW “Firm load” (not DR-capable) Time April 23, 2014 DSWG Loads in SCEDv1

Residential CLR-ALR Telemetry Values Example 4 This example assumes Non-spin responsibility and deployment, with SCED dispatch SPC+2 values will be used by ERCOT to validate baseline Aggregated whole-house Load = NPF Baseline = SPC = MPC Offline Non-spin deployed SCED Base point sent Aggregated whole-house Load = NPF = MPC = SPC Aggregated whole-house Load minus DR capability = LPC SCED DR obligation DR capability (MW bid) MW “Firm load” (not DR-capable) Time April 23, 2014 DSWG Loads in SCEDv1

ALR Telemetry Validation The preceding slides assume the ALR telemetry consists of aggregated premise-level Load Modifications to the ALR OBD would also permit ALR telemetry to consist of device-level Load April 23, 2014 DSWG Loads in SCEDv1

ALR Telemetry Validation Telemetry validation is performed by comparing 15-minute aggregated telemetry to aggregated premise-level meter data Telemetry values are averaged across the 15-minute Settlement interval Resource-level data is aggregated from 15-minute revenue-quality premise-level metering For each month of participation: 90% of NPC telemetry intervals must be within 10% of resource-level interval meter data Non-Spin qualification test criteria: 80% of SPC+2 telemetry intervals must be within 10% of the corresponding NPC telemetry interval For each month of Non-Spin participation: For each interval of a Non-Spin deployment: X% of SPC telemetry intervals and X% of the corresponding SPC+2 telemetry intervals must be within Y% of the ERCOT baseline for that interval April 23, 2014 DSWG Loads in SCEDv1

Telemetry validation for device-level ALR telemetry Following are proposed modifications to the OBD For device-level ALR telemetry, ERCOT will compare aggregated premise-level 15-minute meter data to the ALR QSE telemetry values. First step: ensure that telemetered values for NPC, averaged over each 15-minute interval, do not exceed aggregated premise-level Load. Then, changes in the magnitude of telemetered device-level Load in response to SCED Base Point Instructions should be reflected as corresponding changes in the aggregated premise-level interval meter data, as estimated using an applicable ERCOT baseline methodology ERCOT will conduct this comparison across all eligible 15-minute Settlement intervals on a monthly basis The following intervals will be subject to telemetry validation: Any intervals in which the ALR was instructed by SCED to reduce to a level below its SPC by a MW value greater than 10% of the difference between its SPC and its LPC; Any intervals in which the ALR was instructed by SCED to increase its consumption to a level greater than 110% of its current NPC; Any intervals in which the QSE initiated an out-of-market deployment of the ALR and reported the deployment details to ERCOT, unless the QSE has notified ERCOT of a telemetry failure. April 23, 2014 DSWG Loads in SCEDv1

Bid Characteristics and Participation Scenarios

RTM Energy Bid Characteristics The RTM Energy Bid is CLR-specific The RTM Energy Bid is used only in the Real-Time Market (SCED) The RTM Energy Bid must be submitted before the end of the Adjustment Period for a given Operating Hour Bid price cannot exceed SWCAP Regulation Up & RRS capacity on bid curve shall be priced at SWCAP April 23, 2014 DSWG Loads in SCEDv1

RTM Energy Bid Characteristics The RTM Energy Bid is submitted as a curve having up to 10 points (MW/price combinations) The MW range on the bid curve goes from zero to total demand response capability First bid MW point is at zero MW (left-most point on the bid curve) Last bid MW point is the total demand response capability (right-most point on the bid curve) The prices on the bid curve from 0 MW to last bid MW are monotonically non-increasing going from left to right Price at 0 MW is highest Price at last bid MW is equal to or lower than price at 0 MW Price in between 0 MW and last bid MW are monotonically non-increasing April 23, 2014 DSWG Loads in SCEDv1

RTM Energy Bid Characteristics The RTM Energy Bid can be submitted with a fixed not-to-exceed price for an “up to bid MW” This is a submission of a bid curve with two (MW/price) points having the same price for both MW points. The first MW point is at 0 MW (left-most point) The last MW point is the total demand response capability (right-most point) April 23, 2014 DSWG Loads in SCEDv1

RTM Energy Bid Characteristics: Example Bid Curve $/MWh SWCAP SWCAP RTM Energy Bid RegUp RRS NSpin MW Total Demand Response Capability April 23, 2014 DSWG Loads in SCEDv1

RTM Energy Bid Characteristics There is no mitigation of the RTM Energy Bid in SCED Step 2 For each SCED run, the RTM Energy Bid is right shifted so that the last MW on the bid curve coincides with the telemetered Maximum Power Consumption (MPC) By this right shift of the bid curve, if the telemetered Low Power Consumption (LPC) is less than the first point of the right-shifted RTM Energy Bid, then ERCOT shall create a proxy bid extension from LPC to this right-shifted first point of the bid curve with a price of SWCAP April 23, 2014 DSWG Loads in SCEDv1

RTM Energy Bid: Example Bid Curve Right Shift for SCED use $/MWh RTM Energy Bid MW Total Demand Response Capability Proxy Bid extension $/MWh SWCAP SWCAP Right shifted RTM Energy Bid MW LPC MPC April 23, 2014 DSWG Loads in SCEDv1

(No Non-spin responsibility) Scenario 1 ALR CLR (No Non-spin responsibility) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW DR-capable ► ► ► $1,000 $50 MPC LPC → For any SCED intervals that the LR’s bid to buy is greater than the five-minute Load Zone LMP, SCED Base Point will instruct the LR to consume at its telemetered Maximum Power Consumption, subject to ramp rate limitations from its current consumption level (NPF) 10 MW Firm April 23, 2014 DSWG Loads in SCEDv1

(No Non-spin responsibility) Scenario 2 ALR CLR (No Non-spin responsibility) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW DR-capable ► ► ► $1,000 $1,500 LPC LPC → For any SCED intervals that the LR’s bid to buy is less than the five-minute Load Zone LMP, SCED Base Point will instruct the LR to consume at its telemetered Low Power Consumption, subject to ramp rate limitations from its current consumption level (NPF) 10 MW Firm April 23, 2014 DSWG Loads in SCEDv1

(No Non-spin responsibility) Scenario 3 ALR CLR (No Non-spin responsibility) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW DR-capable ► ► ► $1,000 $1,000 LPC≤ BasePoint ≤ MPC LPC → For any SCED intervals that the LR’s bid to buy is equal to the five-minute Load Zone LMP, SCED may dispatch the LR in either direction (up or down) in increments as small as 0.1 MW, within the bounds of the LR’s telemetered Maximum Power Consumption and Low Power Consumption, subject to its telemetered ramp rate limitations from its current consumption level (NPF) In this scenario, the LR sets the Load Zone LMP 10 MW Firm April 23, 2014 DSWG Loads in SCEDv1

► ► ► ► Scenario 4a ALR CLR RTM Bid to Buy (up to): Load Zone LMP (5 MW Non-spin responsibility released to SCED; 5 MW additional DR capability) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW add’l DR-capable ► $1,000 ► ► $1,500 LPC+5MW subject to ramp rate limitations from its current consumption level (NPF) 5 MW Non-spin ► $5,000 LPC → 5 MW Firm April 23, 2014 DSWG Loads in SCEDv1

► ► ► ► Scenario 4b ALR CLR RTM Bid to Buy (up to): Load Zone LMP (5 MW Non-spin responsibility released to SCED; 5 MW additional DR capability) RTM Bid to Buy (up to): Load Zone LMP SCED Base Point MPC → 5 MW add’l DR-capable ► $1,000 LPC≤ BasePoint ≤ LPC+5 subject to ramp rate limitations from its current consumption level (NPF) ► ► $5,000 5 MW Non-spin ► $5,000 LPC → 5 MW Firm April 23, 2014 DSWG Loads in SCEDv1

Scenario 5 LR is cleared in Non-Spin in the DAM for six hours, 2-8 PM BUT….maximum run time is 3 hours Real-time energy bid is 5 MW at $1,000 for all six hours In real time, Non-Spin is deployed and at 4 PM the LZ LMP goes to $1,500 and LR is dispatched Prices stay above $1,000 for 4 hours.  In that fourth hour, LR can’t deploy any longer (sets status to OUTL) QSE should continue to send accurate telemetry signals even when LR status is OUTL QSE must replace the capacity, either with a different Resource or through a trade If can’t replace, subject to compliance violation and potential other penalties If QSE notified ERCOT earlier of inability to run more than 3 hours, ERCOT may run a SASM, and QSE replaces capacity at the MCPC cleared in the SASM April 23, 2014 DSWG Loads in SCEDv1

Same LR, same energy bid, same scenario as previous Difference: this time LR does not have Non-Spin responsibility (did not offer into DAM) After LR deployed for the three hours LR hits maximum run time, QSE changes telemetry to OUTL status SCED can no longer dispatch QSE should continue to send accurate telemetry signals even when LR status is OUTL April 23, 2014 DSWG Loads in SCEDv1

Questions? paul.wattles@ercot.com 512/248-6578 OFF paul.wattles@ercot.com 512/248-6578 sainath.moorty@ercot.com 512/248-6633 April 23, 2014 DSWG Loads in SCEDv1