Hydraulics Updates to the IndianaDesign Manual

Slides:



Advertisements
Similar presentations
Drawings of Sufficient Detail
Advertisements

Culvert Inventory and Assessment Protocol 2015 Field Season.
1 CTC 261 Hydraulics Culvert Design. 2 Objectives  Know the factors associated with culvert design  Know what a skewed culvert is.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
Drainage Rights Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Department of Agricultural and Biosystems Engineering Iowa State.
Checkout of Grassed Waterways Beth E. Clarizia, P.E. Agricultural Engineer.
Edward Yousif February 2013 DRAINAGE DESIGN MANUAL REVISION HIGHLIGHTS 1.
Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 2-Year Flood (2320 cfs) Lady Bird Lake Inflow (1.25 ft/s) 9/9/20081ALDEN.
CE 515 Railroad Engineering
Design of Hydraulic Controls & Structures
Culvert Hydraulics using the Culvert Design Form
Drainage System Design and Layout. Design Process Flowchart Background Information (Soils, Topo, Crops) Confirm Outlet Drainage Needed Select DC, Spacing.
Design of Open Channels and Culverts CE453 Lecture 26
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Design of Open Channels and Culverts
Hydrologic Studies Unit Land and Water Management.
CTC 261 Hydraulics Culvert Design Form
Hydraulic Screening and Analysis Needed for USACE Review
1 Urban Drainage and Intersection Design Image:
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
Pavement Analysis and Design
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Responses to Levee Certification Requests 1.Closures 2.Maintenance Plans 3.U/S and D/S Levee Tie-ins.
Fish Passage Principle Make culvert NOT a velocity barrier to fish Compare to typical natural channel hydraulics Use V (section average) as indicator.
Clear and Foster Creek Fish Passage Assessment and Prioritization Project Draft Methodology Report: For the Clear and Foster Creek Fish Passage Assessment.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
© 2009 Bentley Systems, Incorporated Jeff Martin, PE Senior Training Materials Specialist What's the Latest with InRoads Storm & Sanitary V8i?
Urban Storm Drain Design: Conduit design. Sizing Conduit size is computed based on the discharge expected at the upstream node; Typically is done by the.
CTC 261 Culvert Basics.
Basic Hydraulics: Culverts – I
Basic Hydraulics: Channels Analysis and design – I
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design
Basic Hydrology & Hydraulics: DES 601
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 500-Year Flood (11,270 cfs) Lady Bird Lake Inflow (3.5 ft/s) at.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
Basic Hydrology & Hydraulics: DES 601 Module 16 Open Channel Flow - II.
Basic Hydraulics: Open Channel Flow – II
Small Structure Design 101
Hydraulic Culvert Design and HY-8
Sinclair Wash Stream Restoration Feasibility Study
Bridges Reach analysis Fundamental tool for design
There are 2 Types of Bridge Inspectors – Class B and Class A.
Storm Water Drainage Analysis for Harris County (Crosby, TX)
Basic Hydrology & Hydraulics: DES 601
General theory “Water seeks it’s own level”, i.e. if there is a hydraulic connection, total energy will be uniform throughout the fluid “Inverted siphon”
INDOT Culvert Sizing Policy
Environmentally sensitive areas
CE 3372 Water Systems Design
a design technique for achieving fish passage
Grade Separation Inspection and Rating.
CE 3372 Water Systems Design
Highway Drainage-Hydrology
Local bridge Hydraulics 101
11/20/2018 Culverts Culverts are the same as bridges as far as locating cross sections 11/20/2018.
Bridges.
Grade Separation Inspection and Rating.
Culvert Hydraulics using the Culvert Design Form
Grade Separation Inspection and Rating.
Small Structure Rehabilitation Design
Environmentally sensitive areas
Grade Separation Inspection and Rating.
Stream Crossing Replacement Policy
Shaver Creek Permitting
ACEC Designer Training
Presentation transcript:

Hydraulics Updates to the IndianaDesign Manual Mark Bailey, PE Manager, INDOT Office of Hydraulics mbailey1@indot.in.gov David Finley, PE INDOT Hydraulics Engineer dfinley@indot.in.gov March 8, 2017

Updates to the IDM How-to Information Helpful set of presentations on the Office of Hydraulics website

Updates to the IDM Status of the current updates… Mmmm… It is done!

Updates to the IDM Bridge REPLACEMENT Updates… ONE FOOT

Updates to the IDM Bridge REPLACEMENT Updates…

If the existing backwater is… The allowable backwater will be… Updates to the IDM Bridge Replacement Backwater… First assess the existing backwater Basic backwater criteria: If the existing backwater is… The allowable backwater will be… > 3 feet 3 feet or less Between 0.14 and 3 feet Match or improve existing Less than 0.14 feet Up to 0.14 feet This can be affected by other factors →

Backwater: Check velocity… Updates to the IDM Bridge Replacement Backwater: Check velocity… Requires judgment Evidence of instability? If the existing bridge is unstable, the average velocity in the proposed bridge waterway should be ≤ 1.5 * the downstream channel velocity.

Backwater: U/S structures… Updates to the IDM Bridge Replacement Backwater: U/S structures…

Backwater: U/S structures… Updates to the IDM Bridge Replacement Backwater: U/S structures… Lowest adjacent land grade 1 Foot “Target” water surface elevation

Backwater: U/S structures… Updates to the IDM Bridge Replacement Backwater: U/S structures… Lowest adjacent land grade Existing backwater (More than 1 foot) Is the “Target” water surface elevation less than 1 foot of backwater?

Backwater: U/S structures… Updates to the IDM Bridge Replacement Backwater: U/S structures… Lowest adjacent land grade Existing backwater (More than 1 foot) “Target” water surface elevation = 1.5 feet of backwater. GOOD!

Backwater: U/S structures… Updates to the IDM Bridge Replacement Backwater: U/S structures… Lowest adjacent land grade Existing backwater (More than 1 foot) Proposed water surface elevation for 1.0 feet of backwater. Allowed! “Target” water surface elevation < 1.0 feet of backwater. OOPS!

Backwater: Waterway areas… Updates to the IDM Bridge Replacement Backwater: Waterway areas… Gross Waterway Area

Backwater: Waterway areas… Updates to the IDM Bridge Replacement Backwater: Waterway areas… Net Waterway Area

Request plans at: http://www.in.gov/indot/2345.htm Updates to the IDM Bridge Replacement Backwater: Waterway areas… Request plans at: http://www.in.gov/indot/2345.htm

Other Criteria: Freeboard… Updates to the IDM Bridge Replacement Other Criteria: Freeboard… Current criteria: Ideal is 2’ or… maybe 1’ or… maybe 3’ New criteria: What do I need to achieve?

Other Criteria: Freeboard… Updates to the IDM Bridge Replacement Other Criteria: Freeboard… Goal: Meet the existing criteria Three possibilities: The existing low structures is above the goal The existing low structure is in pressure flow The existing low structure is above the 1% EP elevation, but no pressure flow

Other Criteria: Freeboard… Updates to the IDM Bridge Replacement Other Criteria: Freeboard… Matching existing freeboard Debris issues? Yes: Meet the current criteria 0.81’

Other Criteria: Freeboard… Updates to the IDM Bridge Replacement Other Criteria: Freeboard… Matching existing freeboard Debris issues? Yes: Meet the current Criteria No: Can match the PROFILE 0.81’

Updates to the IDM Bridge Replacement Two-Span Structures

Updates to the IDM Culvert REPLACEMENT Updates… Replacement in Kind…

Updates to the IDM Culvert REPLACEMENT Updates… Replacement in Kind… Is now the main policy!

Updates to the IDM Backwater… Culvert Replacement Replacement in Kind… Is now the main policy! Backwater… Proposed backwater can be as much as 3 feet provided is less than the existing backwater But what if an upstream structure would be affected? See the bridge design criteria…

Updates to the IDM Other Criteria… Span and Waterway Area: Proposed ≥ Culvert Replacement Other Criteria… Span and Waterway Area: Proposed ≥ Existing Existing Span 1% EP Water Surface Existing Waterway Area

Updates to the IDM Other Criteria… Culvert Replacement Outlet Velocity ≤ 1.5 x Channel Velocity Does the pipe have a scour issue?

Updates to the IDM Other Criteria… Culvert Replacement Outlet Velocity ≤ 1.5 x Channel Velocity Exceptions: Minimum outlet velocity = 6.5 ft/sec 1 foot of backwater

Updates to the IDM Culvert Extension Culvert Replacement The headwater elevation has to stay the same Remember: HEADwater, not BACKwater How to deal with that? If the culvert is extended, what happens to the headwater here?

Updates to the IDM Other Things… Culvert Replacement When making a submittal, include the electronic files – and mention the version that is used. Is there concern about downstream impacts? Contact the Office of Hydraulics.

Updates to the IDM 50% Clogging Factor… Inlet Spacing Design REQUIRED NOT REQUIRED Sags with flanking inlets Bridge deck drains

Updates to the IDM Flanking Inlets… Inlet Spacing Design Required for curb and gutter sections. Required for median and side ditches unless there is a good place for the water to go.

Updates to the IDM New set of standard drawings… Pipe Cover New set of standard drawings… Cover is now based on pipe type and size

Culvert Lining and more… Updates to the IDM More to come… Culvert Lining and more… Find information on the INDOT Hydraulics website http://in.gov/indot/3595.htm

Hydraulics Updates to the IndianaDesign Manual THANKS Hydraulics Updates to the IndianaDesign Manual Mark Bailey, PE Manager, INDOT Office of Hydraulics mbailey1@indot.in.gov David Finley, PE INDOT Hydraulics Engineer dfinley@indot.in.gov March 8, 2017