By Anastasia Lidya Maukar

Slides:



Advertisements
Similar presentations
Chapter nine Value Chain Management: Functional Strategies for Competitive Advantage McGraw-Hill/Irwin Contemporary Management, 5/e Copyright © 2008 The.
Advertisements

Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Advanced Piloting Cruise Plot.
Chapter 6. Competitive strategy: The analysis of strategic position
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Inventory Systems for Dependent Demand
Operations Scheduling
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 1 The Study of Body Function Image PowerPoint
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Chapter 3: Top-Down Design with Functions Problem Solving & Program Design in C Sixth Edition By Jeri R. Hanly & Elliot B. Koffman.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Operations Management
Inventory Fundamentals
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
Introduction When you choose a restaurant for a meal, are you concerned with: The price of the meal How long you have to wait to be seated The quality.
Copyright © 2001 by Houghton Mifflin Company. All rights reserved. 1 Economics THIRD EDITION By John B. Taylor Stanford University.
ABC Technology Project
Section 26.2 Setting Prices
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Product and Service Design
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chapter 5 Capacity Planning For Products and Services
Strategic Capacity Planning for Products and Services
REVIEW of Chapter 14 We begin this chapter by describing a cost accounting system. We then explain the procedures used to determine costs using a job.
Reporting and Interpreting Cost of Goods Sold and Inventory Chapter 7 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc.
Chapter McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Sales and Inventory 6.
Inventory and Warehouse Processes. Slide 2 Introduction Inventory and warehouse management are closely related to the fulfillment and production processes.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
LONG-RUN COSTS In the long-run there are no fixed inputs, and therefore no fixed costs. All costs are variable. Another way to look at the long-run is.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
FI3300 Corporation Finance Spring Semester 2010 Dr. Isabel Tkatch Assistant Professor of Finance 1.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Operations Management
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Chapter nine Value Chain Management: Functional Strategies for Competitive Advantage McGraw-Hill/Irwin Contemporary Management, 5/e Copyright © 2008 The.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
Global Manufacturing and Materials Management
2. Computer Aided Design and Production Process Assoc.Prof.Dr. Ahmet Zafer Şenalp Mechanical Engineering.
Process Planning and Computer Aided Process Planning
Chapter 4 Process Design.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
Process Layout Chapter 7 July 20, 2005.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Facility Inventory Old Facilities Modern Facilities Classroom Size
Operations Management
Presentation transcript:

By Anastasia Lidya Maukar Facility Design – Week 2 Product, Process and Equipment Design and Analysis By Anastasia Lidya Maukar

Data required for developing good layouts Product Analysis Process Analysis

Product Analysis Product analysis is to determine the product process sequence The information about the product can be generated from: Photograph Bill of Material Engineering Drawing Assembly Chart Route Sheet Operation Process Chart

Gate Valve

Exploded Drawing of the Gate Valve

Engineering Drawing The part list includes the following information for each piece required for the final assembly: piece number piece name quantity required for the final assembly material stock size of the raw material if needed detail drawing numbers weight any other pertinent details

Engineering Drawing of the Gate Valve Provide part specifications and dimensions in sufficient detail for manufacturing

Parts List of the Gate Valve The parts list provides a listing of the component parts of a product. In addition to make or buy decisions, a parts list includes part number, part name, number of parts per product, and drawing references

Bill of Material A bill of material displays a list of parts and are directly required to make a complete assembly. At minimum it should indicate, for each part its number (or drawing number) its description the quantity necessary in the assembly the part is to be made or buy The listing may include additional information such as: material description weight unit price

Bill of Materials for the Gate Valve

Bill of Material Product — An item sold directly to customers (products are listed in the Company catalog). Assembly - A part that is made of two or more other parts and associated labor.  The parts, in turn, may be other assemblies, components, materials or products. Component - A part that is made on the shop floor (also defined as material on which labor has been performed).  Some companies use the terms Assemblies and Components interchangeably in their discussions of Bills of Material structure. Defining them separately is preferable. Material - The type and size of raw material from which a part is made, such as 3/4x48x120 particle board or 6-inch brass railing, or a purchased part. Material  is always purchased.

Assembly Chart I An assembly chart gives a broad overview of how several parts manufactured separately are to be assembled to make the final product. It is an analog model of the assembly process. Circles with a single link denote basic components, circles with several links denote assembly operations/subassemblies, and squares represent inspection operations.

Assembly Chart II

Route Sheet A route sheet specifies the operations required for a part as well as the sequence of the machines visited for these operations. It may also provide the set-up time for each machine, processing time and labor time. It shows how a part is to be produced, which machine are needed, the tools to use, estimated setup times for the machines and production in terms for the machines and production in terms of the number of units expected per hour from each machine. One routing sheet is required for each part in the assembly.

Route Sheet for one Component of the Gate Valve Route sheet summarizes whether a part will be purchased or produced, how the production of a part will be achieved, what equipment will be used, and how long it take to perform each operation.

Operations Process Chart By superimposing the route sheets and the assembly chart, a chart results that gives an overview of the flow within the facility. This chart is the operations process chart.

Precedence Diagram for Assembling the Gate Valve A precedence diagram establishes the prerequisite assembly steps that must be completed before performing a given assembly step.

Process Design & Analysis It is a design or analysis of how a product and its componets are produced.The information consists of: Operation sequence of each product/part (included make or buy analysis for each part) Machine, equipment, tools, fixtures, etc. Operation sequence of assemblies and packout. Standard time for each work element.

Process Design & Analysis Determining the conveyor rate, assembly and packout lines and painting/finishing system Line balancing for each assembly and packout lines. Load work cells. Developing of workstation drawing for each operation using motion economy and ergonomics.

Make-Or-Buy Decisions 1. Cost 2. Capacity 3. Quality 4. Speed 5. Reliability 6. Expertise 6

Make-or-Buy Reasons to make Cheaper to make Company has experience making it Idle production capacity available Compatibility and fit with company’s planned lines of business Part is proprietary Wish to avoid dependency an outside supplier Part fragility requiring high packing and transportation Costs Transportation costs are high

Make-or-Buy Reasons to buy Cheaper to buy Production facilities are unavailable Avoid fluctuating or seasonal demand Inexperience with manufacturing process Existence and availability of suppliers Maintain existing supplier relationship Higher reliability and quality

Machine & Equipment Selection The Number of Machines Needed? These questions can be answered when we know: How many finished goods are needed per day? Which machine runs what parts? What is the time standard for each operation?

Machine & Equipment Selection Advantage: Make efficient use of capital equipment purchase budget Make efficient use of maintenance and operating budget Increase machine utilization Make efficient use of available space

Calculation of Number of Machine p = production rates(units/day) τ = working hours per day(hours) η = machine efficiency t = operation time(hours) Using Backward Analysis (for the sequencing production processws) and each process has a certain scrap, number of production unit to fulfill the demand : Sl = % scrap pf process l Nol = number of output for process l Nil = number of input for process l

Calculation of machine requirements 1 2 3 P1 P2 P3 INPUT OUTPUT Nil Nil = Nol + Scrap Scrap Nol

Personnel Requirement Analysis N = number of types of operations Oi = aggregate number of operations of type i required on all the pseudo/real products manufactured per day Ti = standard time for an average operation Oi H = total production time available per day η = assumed production efficiency of the plant

Space Requirement & Availability Space for facilities Space for operator movement, loading & unloading parts Space for incoming material & WIP Space for auxiliary equipment Space for future expansion and growth

Production space requirement sheet