On the Korean Contributions for

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

X Band Vacuum Devices Presented by: Tony Johns,
THALES ELECTRON DEVICES
1.0 MW / 175 MHz Source for IFMIF: a study of alternatives
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
2009/3/3US High Gradient Research Collaboration Workshop 1 Design Studies of an X-band Multi- beam Klystron S. Fukuda KEK Accelerator Laboratory, KEK.
Erk Jensen CERN, Geneva, Switzerland... some thoughts to trigger discussion...
Polarized photoemission
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
1 Main Linac Design Chris Adolphsen GDE SLAC April 6-7, 2006 MAC Review at FNAL.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
Design Status of IOT for ILC
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
Summary of Accelerator System (WG2) 김귀년 경북대학교. Presentations for WG2 -Polarized Electron Source for ILC in Korea - ( 김귀년 ( 경북대 ), 박성주 (PAL)) - ILC Bunch.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
 High Power RF Systems (352 MHZ - 12 GHz)  High Efficiency Power Sources  High Voltage Systems  High Gradient Accelerating Structures.
I. Syratchev, April 2015, EuCARD2, Barcelona. Review of Efficient RF Sources I. Syratchev, CERN.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Marc Ross The Normal-Conducting Linear Collider preparation - status and plans.
CLIC meeting, Prospects for developing new tubes I. Syratchev, CERN.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
The selection of operating mode for 10MW L-band MBK with high efficiency Institute of Electronics, Chinese Academy of Sciences Beijing, China November.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, February, CERN. I. Syratchev Roadmap for CLIC high-efficiency klystron development I. Syratchev, CERN.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Considerations on Drive Beam Klystrons and Phase Stability Erk Jensen, BE-RF RF and Beam Physics Meeting on CLIC Drive Beam Generation12-August th.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
A 500 MeV S-band Low Cost Electron Beam Source for ILC Keep Alive Source Goal: MeV, 3 nC, ~ 1 mm on ILC Ti Target Wei Gai, ANL.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
Heung-Sik Kang Pohang Accelerator Laboratory
Copyright 2007, Toshiba Corporation. Prospects of X-band Klystron Based on Experience of High Power Klystron Development in TETD 31 st /Jan./2013 Toshiba.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Status and plans of drive beam components and tests Status and plans of drive beam components and tests CLIC review, March 1 st, 2016Steffen Döbert, BE-RF.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
ILC Power and Cooling VM Workshop
Prospects for developing new tubes
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Syratchev(CERN) on behalf of
High efficiency work and MBK development for accelerators
Prospects for high-efficiency klystrons
Thales Klystrons for Linacs
Uppsala Commitment to ESS and FREIA Planning
A frequency choice for the SPL machine: Impact on hardware
Chris Adolphsen Sergei Nagaitsev
Klystron efficiency.
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Klystron based. Updates 2017.
Klystron Power Supplies for ILC
CEPC RF Power Sources System
Nick Walker (DESY) EU GDE Meeting Oxford
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Saclay Test Facilities
CEPC RF Power Source System
DTL for MEIC Ion Injection
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

On the Korean Contributions for ILC RF Sources 2nd ILC Workshop in Korea December 28-29, 2004 포항공대 가속기연구소 박 성 주

ILC RF Requirements based on TESLA500

Example of ILC Layout

Comparision between Commercial MBKs THALES TH1801 CPI VKL-8301 TOSHIBA E3736 Frequency [GHz] 1.3 ← RF Output Power [MW] 10 Beam Voltage / Current [kV/A] 117 / 131 Beam Perveance 3.3 Efficiency [%] 65 Number of Beams 7 6 Cathode Loading [A/cm2] 5.5 < 2.5 < 2.1 RF Pulse Duration [ms] 1.5 Rep. Rate [Hz] Gain [dB] 48.2 Expected Lifetime [hour] 40,000 100,000

Appearances of Commercial MBKs THALES TH1801 CPI VKL-8301 TOSHIBA E3736

Estimation of Wall-Plug Power for RF System

Possibility of MBK Fabrication in Korea Tube related capabilities in Korea: PAL have full capabilities for providing pulsed 80-MW S-band RF system. KAPRA is developing CW 1-MW 700-MHz Klystron for PEFP proton linac. There are considerable activities in Universities (SNU, POSTECH,…). In-house tube R&D can be performed but not recommended. Localization of tube design followed by the acquisition of fabrication drawings (if possible !) would be the right choice for fast fabrication. Possible collaboration scheme: PAL-KAPRA for high-power RF technologies and infra-structures. Distributed resources (mainly among Universities) for investigating various physics & engineering isssues.

PAL’s Potential for MBK Fabrication Special facilities for klystron fabrication XHV Baking Station Various Furnaces HP Microwave Test-Lab Infra-Structures Chemical Cleaning Shop, Plating Facility, Welding Shop, 3D CMM,… Magnetic Field Measurement Facilities Full-line of Microwave Equipments High-Quality Manpowers Beam-Dynamics Experts Mechanical Engineers High-Power Electrical Engineers RF Engineers (LL & HL) XHV Experts were involved in the PLS construction, now in the PAL XFEL project Expected Production Rate: ~ 10 tubes/year