3.5 Community Contracts.

Slides:



Advertisements
Similar presentations
Grant Life Cycle TGF/LOG/150804/1.
Advertisements

Armenias Millennium Challenge Account: Assessing Impacts Ken Fortson, MPR Ester Hakobyan, MCA Anahit Petrosyan, MCA Anu Rangarajan, MPR Rebecca Tunstall,
Mozambique Sustainable Irrigation Development Project (PROIRRI) Early Stage Steps to a Future Impact Evaluation Herminia Pedro, MINAG - DE Paulino Balate.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
Sanitation is Business
Higher Apprenticeships Presented by Negat Lodhi November 2012.
Presentation to the Portfolio Committee on Human Settlements A progress report on Cooperative housing initiatives.
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
3.6 Case Study Irrigation Improvement Project: Developing Water Users Organizations.
GAFSP in the Kyrgyz Republic The Union of Water Users Associations of Kyrgyzstan Bali, May 2014.
Welcome in Kompong Thom!. Irrigation Service Centre Project Coordination meeting 24 August 2010.
3.3 Community Contracts. Rational Community Contracts To ensure that:  Irrigation rehabilitation and improvement works comply with the needs of the farmer.
Presentation by Alex Wilks on behalf of Counter Balance 24/2/10.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
Integrating Environmental Management Plans into Project Operational Manuals Agi Kiss Safeguards Training Workshop, Chisinau, Oct 28-31, 2008.
Presentation Somathilaka Kindelpitiya Community Development Specialist 21 st July, 2012.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Councillor Community Fund Isabell Procter Director of Resources Francis Fernandes Borough Secretary.
Name Position Organisation Date. What is data integration? Dataset A Dataset B Integrated dataset Education data + EMPLOYMENT data = understanding education.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
AMC Governance and Institutional Support. Objectives Build on existing capacity Ensure appropriate independence and credibility through transparency,
The Improvement of Village Infrastructure to Reduce Poverty in Rural Areas Indonesia Experience.
Chapter 11: Alternative Approach - Purchasing Systems.
3.1 Participatory Design. WHY PARTICIPATORY DESIGN?  To understand and agree priorities and make the best design for the system accordingly  To tap.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Accounting Standards Board Annual Report 2006
MINISTRY OF WOMEN’S EMPOWERMENT AND CHILD PROTECTION
The Design Team Carl James.
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Introduction to the Builders Law-
BREEDE-GOURITZ ANNUAL PERFORMANCE PLAN & STRATEGIC PLAN
DONOR COORDINATION MEETING Prishtina, 10 OCTOBER 2016.
The South African Library for the Blind (SALB) Strategic Plan 2019 and Annual Performance Plan 2017 / 2018 Blind people reading!
Implementation of the IPS MDTF
Sanitation is Business
Enhancing employers’ involvement in Social Protection policy debates
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Urban Future 7 DEVELOPMENT COOPERATION WITH CITIES from 1970s to 2020s
Organized by MAFF-NSSU Supported by ADB-TA8163
Objectives of the Training
Prepared by Ahlam Mahadeen M&E officer
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
PROJECT MANUAL Galina Georgieva Project Officer
THE UNITED REPUBLIC OF TANZANIA
VERMONT EMPLOYMENT GROWTH INCENTIVE (VEGI)
Particular Conditions of Contract & Appendix to Tender
Informal Sector Statistics
Policies extending social security coverage
Introduction to building contract
ESF and Social Partners
Introduction to Projects
Sectoral Operational Programme Human Resources Development
Resolution concerning statistics of Work, Employment & labour underutilization
ESF IMPLEMENTATION IN MALTA
United Nations Voluntary Fund on Disability (UNVFD)
Community Solar Clearinghouse Solution: Initial Assessment Review
Bosnia and Herzegovina Community Development Project
Rural Partnerships between Small Farmers and Private Sector
Irrigation Improvement Project: Developing Water Users Organizations
APEC Project Cycle Overview
IN THE CONTEXT OF THE NATIONAL RURAL DEVELOPMENT PROGRAMME
Thematic areas and overview of the opportunities for bilateral cooperation under the Active Citizens Fund Bulgaria Bilateral Workshop between Bulgarian.
Obtaining & Retaining Funds for RWS Schemes from Outside Sources
ECA Quality Control Arrangements
IN THE CONTEXT OF THE NATIONAL RURAL DEVELOPMENT PROGRAMME
Aim of presentation CBSC was tasked to propose to the Council via IRCC to provide information on the minimum resources needed to support a sustainable.
Presentation transcript:

3.5 Community Contracts

Rational Community Contracts To ensure that: Irrigation rehabilitation and improvement works comply with the needs of the farmer beneficiaries and Farmers are willing and able to take responsibility for the O&M afterwards. For the same reason, farmers are required to contribute towards the construction costs.

Expected benefits of WUA Contracts Enhancing community ownership and sustainability of the project Increasing the capacity and skills of the community Generating employment and economic opportunities within the community Facilitating the achievement of desired project objectives Facilitating the collection of beneficiary contribution

Conditions for WUA Contracts Type of Works: small works, such as earthworks and simple repair of irrigation structures. Contract Price: is limited to US$ 10,000 per contract. Eligible WUA: only those WUAs are eligible which: (i) are registered as a legal entity, and (ii) have a managing board that is accountable to the member-farmers as a whole.

Review of WUA Sub-projects The applications are reviewed by the PIU: Applications are in line with the results of participatory designs. Proposed works are on the priority list of the WUA Proposed works are within the technical capability of the WUA (not too complicated) Proposed works can be done entirely with locally available materials, machinery/equipment and craftsmen/artisans

Review of WUA Sub-projects Cost estimate of proposed works does not exceed the $ 10,000 limit The WUA is registered as a legal entity The WUA has sufficient institutional capacity to implement the works The number of WUA contracts approved for the applying WUA is reasonable

Review of WUA Sub-projects PIUs advise and assist the WUA in improving and finalizing the applications.

Estimating Contract Price Prepare “bill of quantities” required for the work. Estimate costs according to market price. Sign the bill of quantities, costs and total contract price.

Types of WUA Contracts Earth works (desilting, repair of embankments) Small gabion protection works Stone masonry and brick works Gate welding, painting and lubrication Repair of gate doors and other simple steel works Installation of cable lifting gears

Types of WUA Contracts

Construction Support Group (CSG) The CSG provides the WUAs with the following kind of assistance: Technical advice on work methods, organization and materials Measurement/recording of volumes of work done and materials used Supervision of works Preparation of physical progress reports for (on behalf of) the WUA

Quality and Quantity Control To provide the required close guidance and supervision, the PIU set up a “Construction Support Group (CSG) in each project area comprising: Qualified engineers to provide technical guidance to WUAs during the implementation of the works Qualified quantity surveyors to measure progress of the work and to help the WUAs in providing expense justification, which is required for the release of further disbursement tranches.

WUA Construction Manager The WUA appoints a construction manager. The construction manager is responsible for: Organizing and supervising the work. Preparing progress reports. Signing on request for installments (tranches). Signing on completion of works.

Number of WUA Contracts.. Planned: Wadi Zabid Wadi Tuban 173 96 77 Signed: 150 94 56 Completed: 27 7 20 Under implementation: 54 37 17

Main Constraints Delay of works, due to.. Shortage of WUA capabilities. Difficulty in providing “Letter of Guaranties”.