Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002

Slides:



Advertisements
Similar presentations
1 Optimal focusing lattice for XFEL undulators: Numerical simulations Vitali Khachatryan, Artur Tarloyan CANDLE, DESY/MPY
Advertisements

Magnets for the ESRF upgrade phase II
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
SCU Measurements at LBNL
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Wrap-up 20 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Magnet designs for the ESRF-SR2
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
2 Lasers: Centimeters instead of Kilometers ? If we take a Petawatt laser pulse, I=10 21 W/cm 2 then the electric field is as high as E=10 14 eV/m=100.
Solenoid-Based Focusing Lens for a Superconducting RF Proton Linac Presentation prepared for AEM 11/08/20101I. Terechkine.
08/06/ FCC-ee with kinks Can we conserve polarized beams?
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Number of Blocks per Pole Diego Arbelaez. Option – Number of Blocks per Pole Required magnetic field tolerance of ~10 -4 For a single gap this can be.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
LCLS-II Physics Meeting, May 08, 2013 LCLS-II Undulator Tolerances Heinz-Dieter Nuhn LCLS-II Undulator Physics Manager May 8, 2013.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
FEL Simulations: Undulator Modeling Sven Reiche Start-end Workshop DESY-Zeuthen 08/20/03.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Overview Preparatory work at the MML BBA to define the reference orbit
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Correlated Misalignments Studies for LCLS-II SC Linac
Orbit Control For Diamond Light Source
Status of SPARC Undulator
ILC Z-pole Calibration Runs Main Linac performance
Coupling Correction at the Australian Synchrotron
Magnets for the ESRF upgrade phase II
LCLS Undulator Fiducialization
Undulator Tolerances for LCLS-II using SCUs
SCU Next Phase Meeting July 8, 2014.
Phase Adjustments: K vs
A Cold SCU Phase-Shifter
Advanced Research Electron Accelerator Laboratory
High Level Physics Applications for LCLS Commissioning
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Gain Computation Sven Reiche, UCLA April 24, 2002
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Coherent Synchrotron Radiation Study
JLEIC Collaboration meeting Spring 2016 Ion Polarization with Figure-8
Undulator X-ray Diagnostics P. Ilinski, E. Gluskin and N
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Final Break Length Choice AC Conductivity Wakefields
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
BEAM REALISTIC ERROR ORBIT IMPACT ON SASE PERFORMANCE
Breakout Session SC3 – Undulator
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002 Requirements for individual undulators Radiation considerations Undulator magnetic design and model calculations Initial results from prototype Controls LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Cell structure of the LCLS undulator line 3420 187 421 UNDULATOR 11055 mm Horizontal Steering Coil Vertical Steering Coil Beam Position Monitor X-Ray Diagnostics Quadrupoles LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Requirements for individual undulator segments - 1 Trajectory straightness Beam will be centered at the beam position monitors between undulators; trajectory must remain straight in undulators Allowed x and y deviation is 2 µm (0.2% increase in gain length) At 14.35 GeV, this corresponds to a second integral of the field of 9600 G-cm2 (or, at 4.5 GeV, 3000 G-cm2) Magnetic measurement reproducibility for second integral is now ~ 1000 G-cm2 LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Requirements for individual undulator segments - 2 Reduction in first-harmonic radiation at zero angle Allowed reduction is 4%. Corresponds to 1.1% increase in gain length In practice, the reduction can be calculated by comparing to the best of the undulators Phase deviation Allowed deviation from the design value (2π * integer) is 10° Corresponds to 1.7% increase in gain length Measurement reproducibility is now 0.5° LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Requirements for individual undulator segments - 3 Vertical alignment Undulator midplane must be determined (and aligned) to 50 microns vertically 50 microns displacement gives ~ 10° in phase slippage Combined effect of these errors is 3% growth in power gain length Requirements have all been met in the APS FEL LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Requirements for individual undulator segments - 4 Uniformity of magnetic field strength Error in magnetic field strength in an undulator by ∆B/B = 1.5 x 10-4 gives a phase error of 10° Simulations using the code RON agree, finding significant change in gain when variation reached 1.3 x 10-4 This is error in B of 1.7 G (or gap error of 1.2 µm) May impose requirements on temperature uniformity along the undulator line LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Undulator Ends Undulator ends will be tuned to keep trajectory straight Sequence of end pole field strengths near 1/4, -3/4, 1, -1 No offset and no angle kick Ends will be tuned for proper phase For APS undulators, phase can be adjusted by ±38° by tuning Alignment tolerance for installation is 1 mm Remote adjustment of phase will be possible LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Break lengths LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Radiation considerations - What damages magnets? Bending magnet irradiation (~40 keV photons), up to 280 Mrad: no effect* 60Co (1.17 MeV photons), up to 700 Mrad: no effect* 17 MeV electrons: at 260 Mrad, 9% remanence loss† Above a few MeV, the shower produced includes both electrons and photons, independent of whether the initial particle was electron or photon * Alderman, et al., ANL-APS LS-290. † Okuda, et al., NIM B 94 (1994) 227. LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Radiation considerations - What damages magnets? Radiation-induced demagnetization has been seen at both ESRF (6 GeV) and APS (7 GeV), so the 14.35 GeV LCLS should be quite capable of damaging magnets There is no space to pile Pb shielding upstream of each undulator. LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

How can likelihood of radiation damage be reduced? Controllable factors : Magnet grade - i.e., intrinsic coercivity iHc Lower coercivity of the magnet correlates with greater sensitivity to radiation damage (Van Vaerenbergh et al., RADECS 99 proceedings; Ikeda and Okuda, NIM A407 (1998) 439) Magnetic environment - i.e. local demagnetizing field in the magnet block Correlation found between stronger demagnetizing field during irradiation and greater likelihood of demagnetizing (Brown and Cost, J. Appl.Phys 63 (1988) 3537, and IEEE Trans Magn. 25 (1989) 3117) LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Magnet grades Data sheet from Shin-Etsu LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Calculated characteristics of magnetic model Period is 30 mm At 6 mm gap, Bpeak=13897 G Beff = 13481 G (13250 G desired) Keff = 3.776 (3.71 desired) force per pole = 258 N (or 58 lbs.) transverse position where ∆B/B=1.3x10-4 is at 2.9 mm LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Initial results from prototype undulator Actual field strength is stronger than predicted by model calculation Keff = 3.91 instead of 3.78 Gap of undulator will be adjusted (by about 0.3 mm) to compensate LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Controls - 1 Controls will be based on EPICS and will build on existing controls at APS Where possible, integrate with commercial off-the-shelf components Support multiple devices on single fieldbus network Custom design when needed APS-designed valve controller Vacuum interlocks Low frequency data collection for vacuum controls Short-haul wireless technology (e.g. Bluetooth) may integrate well LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS

Controls - 2 High motor count dictates dense control scheme; encoders assumed Diagnostics High speed cameras and frame grabbers (>120 Hz) should be available in the near-term PC based analysis is becoming industry norm Allows rapid analysis and easy upgrades Magnet power supplies controlled via fieldbus Phase correctors use PZT stages controlled with commercial hardware - few stages per controller Investigate custom hardware? LCLS DOE Review, April 24, 2002 Liz Moog, ANL / APS