EVLA Construction Status

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

May 22/ SAGE Meeting1 EVLA Hardware Systems: Status and Prognosis Rick Perley.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Project Management Mark McKinnon Project Manager.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Rick PerleyEVLA Advisory Panel Meeting May , Scientific Impact of Descopes Rick Perley.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Rick PerleyNSF Mid-Project Review May 11-12, Scientific Impact of Descopes Rick Perley.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Bryan Butler EVLA Computing Division Head
EVLA Basic Operations Jim Ulvestad
EVLA Availability - or - When Can I Use It?
Computing Architecture
Committee Charge Fred K.Y. Lo
First Light Science: Observing Strategies
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Atacama Large Millimeter Array
EVLA Status and Prospects
Software Requirements
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Some Illustrative Use Cases
EVLA Advisory Committee Meeting
Science Commissioning
EVLA Advisory Committee Meeting System Status
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Prototype Correlator Testing
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA Operations Jim Ulvestad
Correlator Growth Path
Rick Perley NRAO - Socorro
EVLA Technical Performance
Presentation transcript:

EVLA Construction Status Mark McKinnon EVLA Project Manager

Full frequency coverage from 1 to 50 GHz. Key EVLA Project Goals Fundamental Goal: By building on existing infrastructure, multiply ten-fold the VLA’s observational capabilities. Full frequency coverage from 1 to 50 GHz. 8 frequency bands with cryogenic receivers. Two separately-tunable polarization pairs, with no restrictions on their tuning (unlike current VLA). 1 mJy point-source continuum sensitivity (most bands) New correlator with 8 GHz/polarization capability 16384 minimum channels/baseline with full polarization Full recirculation capability for increased flexibility 128 independently tunable frequency slots. Noise-limited full-beam imaging in all Stokes parameters. SAGE meeting, May 22-23, 2007

Organization Work on EVLA is subdivided into 11 WBS elements EVLA project is embedded within NRAO-NM Operations Benefits from effort contributed by operations But, can be adversely affected by low operations budget EVLA Organization Chart SAGE meeting, May 22-23, 2007

Budget Funding $59M total from NSF @ ~$5M/year through 2011 WIDAR correlator (~$17M) from Canadian partner $2M from Mexican partner ~$16M in NRAO-Ops contributed effort Project contingency In January 2007, contingency increased to highest level in project history (16% of cost to complete) Currently, contingency is estimated at $2.9M (11.3%) Could be as low as $2.2M (8.6%) depending upon outcome of upcoming negotiation on joint software development effort with ALMA Descope Options Not considering at this time Possibilities: Solar mode … $0.2M X-band … $1.0M Ku-band … $1.3M Project contingency, as percent of cost to complete the project, for all actions approved by the control change board as of March 2007 SAGE meeting, May 22-23, 2007

Schedule Coarse schedule: Last antenna - Q2 2010 Correlator operational – Q3 2010 Last receiver (X) - Q3 2013 On track to achieve goal of retrofitting 12 antennas to the EVLA design by Sep 30, 2007 (see Perley talk) Account for over 25% of VLA antenna hours In Sep 2006, accelerated rate for antenna retrofits as schedule recovery measure Correlator delivery paces “real” EVLA capability (see Rupen talk) Install prototype correlator (testing only) – Q2 2008 Begin board installation for final correlator – Q2 2009 Complete installation – Q2 2010 SAGE meeting, May 22-23, 2007

Maintain antenna retrofitting rate EVLA Emphasis in FY2008 Maintain antenna retrofitting rate Potential impact of VLBA tiger team visits in summer 2007 Continue to expedite receiver production Continue focus on C-band OMT and Ka-band receiver for new, early, science capability? Closely monitor correlator progress, and expedite schedule where possible Ensure software delivery is matched to hardware capabilities (see Butler talk) Near term: Monitor and control, observation preparation, and post-processing software for prototype correlator Mid term: Ongoing development of user-facing software Long term: Algorithm development for wide-band, wide-field imaging SAGE meeting, May 22-23, 2007