Palo Verde-COI RAS Retirement

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
Goshen Area Bus Reconfiguration
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Northwest Quadrant Joint Security Study Southern Company Headquarters Birmingham, Alabama August 12, 2002 Presented by Saeed Arabi.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
WECC Joint Synchronized Information Subcommittee
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2014 New York Independent System Operator, Inc. All Rights Reserved. Emergency Transfer Criteria NYSRC Reliability.
California Energy Commission Workshop Nuclear Power Plant Issues
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
Review of BPA Voltage Control Conference
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Stability analysis on WECC Systems with Wind Penetration and Composite Load Model Hyungdon Joo and Melissa Yuan Mentor Yidan Lu Professor Kevin Tomsovic.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Houston Area Dynamic Reactive Project March 11,
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Project WECC-0100 Update Reliability Subcommittee February 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Operations Report Kent Saathoff System Operations ERCOT.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
BPA Pacific DC Intertie (PDCI) Upgrade Project WECC Path Rating Process PDCI 3220 MW North to South Phase 1 Kick-off Meeting October 23, :00-4:00.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Announcements Please read Chapter 6
Modeling DER in Transmission Planning CAISO Experience
Freeport Area Master Plan Project -
Visibility Ramu Ramanathan 10/1/2007.
Calvert City Power I, L.L.C. (“Calvert”) Purpose of Meeting
Barrilla Junction Area Transmission Improvements Project
Black Start Overview.
Phase Angle Limitations
WECC Load Modeling and Validation Group Meeting
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Proposal to Remove from Service the PV-COI RAS
Eleanor Ewry Base Case Coordination Subgroup Chair
Next Steps in Load Modeling
Updates to the Path Rating Process for Approval by the PCC
Compliance Report to ERCOT TAC February 2007
Presented by: LADWP November 14, 2017
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
I-5 Corridor Reinforcement Project
Project WECC-0100 Update Load Modeling Task Force
DEC System Voltage Planning - June 2018
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
CMPLDWG Composite Model with Distributed Generation Approval
Jonathan young ColumbiaGrid
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
CMPLDWG Composite Model with Distributed Generation Approval
Project WECC-0100 Update Reliability Subcommittee
WECC Load Modeling and Validation Group Meeting
WECC Joint Synchronized Information Subcommittee
TONBRIDGE POWER GREEN LINE
User Experience with New Solar PV Models California ISO
Project WECC-0100 Update Load Modeling Task Force
Proposal to Remove from Service the PV-COI RAS
Palo Verde-COI RAS Retirement
Presentation transcript:

Palo Verde-COI RAS Retirement Philip Augustin August 20, 2017

Overview Historical Background Study Motivation Technical Justification Summary of Study Results Recommendation 08/22/2017

Historical Background Originally developed after a 2004 analysis of system impacts on the transfer capability of Path 66, California Oregon Intertie (COI), following planned upgrades on three Palo Verde generating units: Winter / Summer PV Unit #2 – November 2003 (121MW / 92MW) PV Unit #1 – November 2005 (121MW / 92MW) PV Unit #3 – November 2007 (121MW / 92MW) 2004 Technical Studies indicated impacts on California Oregon Inter-Tie (COI): Pre PV unit upgrades showed minimum of 134MVAR margin on COI system busses Post PV unit upgrades study case diverged, indicated zero MVAR margin on COI system busses Direct Load Tripping of 150MW in Phoenix Area restored MVAR margin to 139MVAR The COI was stressed in multiple cases, and the loss of two upgraded Palo Verde units in certain instances, no positive reactive power margin on the COI system buses 08/22/2017

Historical Background To mitigate a potential voltage collapse, a Direct Load Tripping (DLT) RAS was designed with the following specifications: Scheme is armed when output of any two units at Palo Verde exceeds 2550MW Simultaneous loss of two (2) Palo Verde units is defined as loss of two (2) Palo Verde units within a time period of 5 minutes or less. DLT will occur in one second or less. A minimum of 120 MW of load is to shed, but 150 MW is armed to trip. Load restoration is done by manual commands only. 08/22/2017

08/22/2017

Study Motivation SRP began a project to evaluate the operation, coordination, and effectiveness of the PV-COI RAS in compliance with PRC-012–014 and WECC‐010 TPL‐001‐WECC‐CRT‐3 A third party consultant was hired to perform the technical analysis The transmission system has changed since the PV-COI RAS was installed BPA installed series capacitors on John Day–Grizzly #1 and #2 500 kV lines BPA installed a 308MVAR Shunt capacitor installed at Slatt 500 kV bus All transient stability analysis was conducted using version 19.0_02 of GE PSLF. 08/22/2017

Summary of proposed WECC‐010 TPL‐001‐WECC‐CRT‐3 performance criteria Following fault clearing, the voltage shall recover to 80% of the pre‐contingency voltage within 20 seconds of the initiating events for all P1 through P7 events, for each applicable BES bus serving load. Following fault clearing and voltage recovery above 80%, voltage at each applicable BES bus serving load shall not dip below 70% of pre‐contingency voltage for more than 30 cycles nor remain below 80% of pre‐contingency voltage for more than two seconds, for all P1 through P7. For three phase faults, all oscillations that do not show positive damping within 10 seconds after the start of the studied event were continued out to 30 seconds. Oscillations that do not show positive damping after 30 seconds shall be deemed unstable. 08/22/2017

Technical Study Assumptions Power flow, voltage, and transient stability assessments were performed to determine the present-day need of the PV-COI RAS that direct trips Arizona area load for loss of two (2) Palo Verde units. System performance was evaluated against applicable NERC/ WECC and CAISO Reliability Standards and Performance Criteria. Additionally BPA indicated a VAR minimum requirement of 100 MVAR at several buses in the NW. All voltage stability analysis was conducted using version 19.0_02 of GE PSLF and benchmarked against version 21.0_02. 08/22/2017

Summary of Study Results Power flow results identified that there are no elements that exceed its emergency thermal limit for loss of two Palo Verde units. Voltage stability analysis identified that with WECC Path 66 (COI) increased by 2.5%, the loss of two Palo Verde units solved with adequate reactive margin with or without the load dropping RAS. Transient stability results identified that the system is stable and positively damped for loss of two (2) Palo Verde units with and without the load dropping RAS. The contingency conforms to the WECC‐0100 TPL‐001‐WECC‐CRT‐3 System Performance criteria. 08/22/2017

Study Conclusion The study results show that with the COI stressed to its limit and without the PV-COI RAS in service: The system continues to meet all power flow, voltage, stability, and transient stability criteria There is a minimum of 472MVAR of reactive margin on the COI system busses, well above the 134MVAR of margin that the PV-COI RAS was originally designed to maintain 08/22/2017

Recommendation from the study results Based on the study results, SRP recommends that the PV-COI RAS be removed from service by December 31, 2017 and decommissioned at a later date. The Path Operator BPA, is currently reviewing the study results 08/22/2017