Contract Changes Construction contracts are unique because owner can make unilateral changes to contract (with consideration)

Slides:



Advertisements
Similar presentations
When Consideration Is Not Required Copyright © Texas Education Agency, All rights reserved.
Advertisements

CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
1. Parties have contractual capacity 2. Contract has legal purpose 3. Offer 4. Acceptance 5. Consideration 6. Statute of Frauds compliance.
Contract formation Review notes form Chapter 5 of the book Each contract carries a promise and performance expectation Legal enforcement promotes economic.
Contractual Obligations
1 CHAPTER CHAPTER 10 2 What You Will Learn: Why It Is Important:  How to explain the purpose of the Statute of Frauds  How to explain the legal.
Chapter 1: Legal Ethics 1. © 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use.
Mutual Consideration ● 9-1 What is Consideration? ● 9-2 Legal Value and Bargained-For Exchange ● 9-3 When is Consideration Not Required?
Contract Presentation.. Offer and Acceptance Questions: 1.What are the requirements of an offer? 2.How are acceptances Created? 3.What are the elements.
Section 10.2.
9-1 General Requirements - Enforceable Contract 1.Offer and acceptance 2.Consideration 3.Legal object 4.Competent parties 5.Legal form.
Chapter 14 Statute of Frauds and Equitable Exceptions
Contract Law for Paralegals: Traditional and E-Contracts © 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Writing and E-Commerce.
© 2015 OnCourse Learning Chapter 6 Real Estate Contracts.
1 Ch. 18 Outline 1. Damages 2. Rescission and Restitution 3. Specific Performance 4. Reformation 5. Recovery Based on Quasi Contract 6. Election of Remedies.
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
©2001 West Legal Studies in Business. All Rights Reserved. 1 Chapter 18: Contracts — Breach of Contract and Remedies.
© 2007 Prentice Hall, Business Law, sixth edition, Henry R. Cheeseman Chapter 14 Writing and Formality Chapter 14 Writing and Formality.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Creating an Enforceable Contract OBE 118, Section 10 Fall 2004.
Unit 6 Contracts. Definition n An agreement between two or more parties enforceable in court.
© 2007 by West Legal Studies in Business / A Division of Thomson Learning CHAPTER 9 Contract Performance, Breach, and Remedies.
Making a Contract Enforceable OBE 118, Section 3 Fall 2004 Was Consideration given? Was there Capacity to Contract? Legal Subject Matter? Was there Genuine.
CHAPTERCHAPTER McGraw-Hill/Irwin©2008 The McGraw-Hill Companies, All Rights Reserved Statute of Frauds SIXSIX.
Business Law - Week 3 Class Agenda Other information: Good Samaritan Law | International Law Review Week 2 Case Study Break Discussion: Contracts continued.
What contracts must be in writing to be enforceable? What contracts must be in writing to be enforceable? If it is possible for a contract to be performed.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© 2004 West Legal Studies in Business A Division of Thomson Learning 1 Chapter 17 Contracts: Breach of Contract and Remedies Chapter 17 Contracts: Breach.
Construction Engineering 380 Contract Interpretation.
How Contracts Arise What Are Contracts? Any agreement enforceable by law.
Chapter 9 Mutual Consideration. Consideration Main purpose of consideration is to distinguish between social promises and more serious transactions where.
© 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 18 Contracts—Breach and Remedies Copyright © 2009 South-Western Legal Studies in Business, a part of South-Western Cengage Learning. Jentz Miller.
 A party may be discharged from a valid contract by:  A condition occurring -- or not occurring.  Full performance or material breach by the other.
Plans and Specifications Plans and specs are contract documents Defects in construction can be caused by design flaw (plans and specs were wrong) Defects.
1. 2 BUT FIRST SOME ADDITIONAL BUT IMPORTANT DEFINITIONS AND LEGAL CONCEPTS.
MT 311 Seminar 6. Copyright © 2010 South-Western Legal Studies in Business, a part of South-Western Cengage Learning. 2 Contract Discharge Conditions.
© 2004 West Legal Studies in Business A Division of Thomson Learning 1 Chapter 14 Contracts: Statute of Frauds Chapter 14 Contracts: Statute of Frauds.
Comprehensive Volume, 18 th Edition Chapter 17: Form of Paper and Electronic Contracts.
What is a condition precedent, and how does it affect a party’s duty to perform a contract? What is a condition precedent, and how does it affect a party’s.
What is the difference between compensatory damages and consequential damages? What are nominal damages, and when do courts award nominal damages?  What.
Consideration Objective 3.01 Chapter 8 – Page 173.
Real Estate Principles and Practices Chapter 6 Contracts and Business Law © 2010 by South-Western, Cengage Learning.
LAW for Business and Personal Use © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
Chapter 6 Real Estate Contracts 2010©Cengage Learning. All Rights Reserved.
LAW for Business and Personal Use © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Illegal Agreements Chapter When Courts will Enforce Most illegal contracts are void and unenforceable However, the law can allow for restitution…
Ch. 7 Consumer Law and Contracts 7-1 Sales Contracts.
Chapter 18 Contracts in Writing Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
Contracts and Intellectual Property Law
Chapter 19: Breach of Contract and Remedies
Chapter 19: Breach of Contract and Remedies
Chapter 16: Contracts – The Writing Requirement and Electronic Records
Chapter 10: Contracts — Breach of Contract and Remedies
Chapter 15 Discharge of Contracts
Organize the Required Parts and Forms of a Contract
Chapter Five. Consideration
Fundamental Legal Principles
Things to look for in owner contracts
Contracts That Must Be in Writing and E-Signatures
SA Legal Contract Review and Submission Process Training
STATUTE OF FRAUDS AND EQUITIBLE EXCEPTIONS
Chapter 10 Legal Purpose and Proper Form
Chapter 10 Elements of a Contract.
BUSINESS LAW TEXT AND CASES
Unique General Conditions of the Alabama Building Commission (ABC)
STATUTE OF FRAUDS AND EQUITIBLE EXCEPTIONS
Chapter 14 Statute of Frauds and Equitable Exceptions
CHAPTER 9 Test review.
Presentation transcript:

Contract Changes Construction contracts are unique because owner can make unilateral changes to contract (with consideration)

Contract Changes Changes in scope require change orders Changes in time require delay or acceleration claims Most claims are handled in change orders Change orders must be in writing and confirmed Contractor entitled to OHP

Contract Changes Document the changes in scope or time Estimate costs Estimate time Submit request for change order per contract Get approval (dual or three-way signature) Handouts of standard forms

Contract Changes Field changes are used when there is no time for prior approval Explain and document (notification clause) Architect issues change directive, then contractor submits claim (court or arbitrator) Constructive change for extra work caused by defective plans and specs or owner misrepresentation (MSP airport) Contractor not responsible for synthesis and coordination of plans and specs

Contract Changes Scope changes are different than constructive changes- owner adds work If scope change becomes excessive, original contract can be voided Contractor entitled to payment after new contract is agreed to Each party must give consideration (prevents holdings tactics

Contract Changes “evidence of writing” required for certain transactions Sale of goods over $500 (UCC) Scope of work exceeds one year Involves purchase, lease or mortgage of property Promises to pay debt of another Agency contracts Scope exceeds life of the entity Agreements on consideration of marriage

Contract Changes Owners entitled to change the contract Suppliers entitled to consideration, but “pre-existing duty” takes precedence Promissory estoppel Party has given reason to believe payment is due Other party relied on that promise in conduct Other party performs work and incurs costs

Contract Changes Waiver- any party can agree to relinquish a right or ignore contract clauses Delays Inexcusable- contractor pays costs Excusable- each party absorbs costs- contract delays are usually spelled out in contract Law delays are granted by court or statute Compensatory- owner pays contractor for additional costs

Contract Changes Acceleration claims Speed up construction Increase rate of work Refusal to grant extension is same as acceleration claim Liquidated damages and no damages for delay clauses are very difficult to enforce (exculpatory) Notice and documentation are critical Delays within schedule float are not qualified (conveying system at MSP airport)