Proposed Transitional Gas Exit Arrangements

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Modification Proposal 0283 Update
EU Implementation Programme
Exit Capacity User Commitment – Transmission Workstream update
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Credit Modification Proposals Update
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Transmission Workstream 2nd December 2010
Revised Tender Timescale for DN Interruption Arrangements
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
Flat, flex, assured pressures Network Development Statement
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Presentation transcript:

Proposed Transitional Gas Exit Arrangements Presentation to Transmission Workstream 01 September 2005

Contents Impact of Delay to Enduring Arrangements Proposed Transitory Arrangements Impacted areas Consultation timetable

Update on Authority Decisions Authority decision on Network Sales concluded that NTS Exit arrangements required reform to be introduced in two phases: “Interim” Arrangements established new commercial framework recognising the new NTS/DN interface “Enduring” Arrangements (by September 2005) to introduce more market based arrangements effective from gas year 2008/09 On 24 June, Authority announced delay to implementation of Enduring Arrangements until September 2007 for release of capacity rights from gas year 2010/11

Implications of delay Regime requires to be extended to cover gas years 2008/09 and 2009/10 Regime requires to address within and beyond typical 3 year investment lead time Concept of “Transitional Arrangements”

Transitory Arrangements - Proposed Principles Capacity products and contracting/invoicing parties unchanged Capacity requests/allocations extended to 30 Sept 2010 Shippers – continuation of current rules DNOs – extend to one further year ahead Incremental investments to be backed by firm financial commitment Additional information from DCs and DNs to support 5 year NTS development plan Seek to implement Oct 05

Impacted Areas UNC – Capacity registration and information exchange IExCR – Incremental Exit Capacity Release Methodology Statement SC4B – Standard Condition 4B (Connection charging methodology) ARCA – Advanced Reservation of Capacity Agreement requires for DNs

Proposed UNC Modifications Two UNC Modifications have been raised: 1) 0038: Re-introduce formal planning information from DNs (“PS3”) 2) 0046: Extend sunset clauses to allow DNs to request and NTS to confirm capacity beyond September 2008 Considered required to help demonstrate that Transco NTS and DNs are meeting Safety Case requirements in the absence of any other enduring mechanism formalise mechanism by which Transco NTS and DNs agree capacity entitlements 3 years ahead ensure sufficient lead time for required investments

Modification 0046 - Interim Arrangements Shipper Users able to request increases in Firm Capacity or redesignation of Interruptible Supply Points as Firm until 30 Sept 2008 Offtake Capacity Statement for each DNO sets out for each of its NTS/LDZ offtakes for each Gas Year until 30 Sept 2008: NTS Offtake (Flat and Flexibility) Capacity Assured Offtake Pressures DNOs can request increase or decrease to these amounts during June-July each year (“the Application Window”) Transco NTS responds by 30 Sept each year with updated Offtake Capacity Statements Incremental capacity requests assessed in accordance with Incremental Exit Capacity Release Methodology Statement (IExCR)

Modification 0046 - Transitional Arrangements Delay to implementation of enduring offtake arrangements requires development of transitional arrangements Gas Years 2008/09 and 2009/10 Modification 0046 proposes to extend sunset clauses in UNC to Sept 2010 such that Shipper Users able to register increases in Firm Capacity or redesignation of Interruptible Supply Points as Firm up to Sept 2010 DNO Users able to register capacity for 2008/09 as soon as possible and 2009/10 next June/July

Modification 0046 - Proposed Timetable Application Window Requests for Amended Cap. – Relevant Gas Years Requests for Initial Capacity – Relevant Gas Year Transco NTS Response to Capacity Request Two weeks after implementation of Proposal 2008/09 Six weeks after implementation of Proposal June/July 2006 2006/07 2007/08 2009/10 30 September 2006 June/July 2007 30 September 2007 June/July 2008 30 September 2008 June/July 2009 30 September 2009

Modification 0046 - Transco NTS assessment NTS Offtake Capacity requests Incremental capacity requests assessed in accordance with revised IExCR Methodology Statement Require consideration as to when appropriate for Transco NTS to invest in NTS Transco NTS to consult on revised IExCR over period of consultation on Mod 0046 Assured Offtake Pressure requests Transco NTS will accept requests up to previous Gas Year value Higher pressure requests assessed in accordance with current criteria in UNC ie. whether Transco NTS would be able to make gas available for offtake in all feasible conditions

Transitional IExCR Incremental Capacity requests Requests in excess of following values deemed to be requests for “incremental capacity” NTS Exit Capacity prevailing registered quantities held by Shippers at NTS Exit Points NTS Offtake (Flat/Flex) Capacity as stated in the prevailing Offtake Capacity Statement for previous Gas Year I.e request for 2008/09 based on 2007/08 allocation

Transitional IExCR Allocation of incremental capacity requests * In accordance with SC4B 'Transco NTS Statement of principles and methods to be used to determine charges for National Transmission System Connection Services'

DN ARCA - Principles Extension of principles applied to NTS direct connects DN ARCA required in accordance with proposed conditions in SC4B ie. where require Specific Reinforcement for incremental NTS Offtake (Flat) Capacity > 20 mtpa; and/or any incremental NTS Offtake (Flexibility) Capacity Will state level of financial commitment from DN and amount of “reserved” capacity Each specific agreement based on a generic form of agreement - based on Langage ARCA Transco NTS and DNO to agree delivery date for reserved capacity, but delivery date can be delayed due to specific events beyond Transco NTS control eg. granting of relevant provisions Disputes referred to Ofgem

DN ARCA - Liabilities DNO User required to book stated levels of capacity or pay Transco NTS the “Outstanding Amount”: ARCA Commitment – Booked Incremental NTS Offtake (Flat/Flex) Capacity x prevailing NTS Exit Capacity Charge over first 2 years of capacity availability where “ARCA commitment” is 1 years NTS Exit Capacity Charge for incremental NTS Offtake (Flat/Flex) Capacity Transco NTS liabilities covered by existing UNC failure to make available for offtake payments

Timetable Mod 0046 Consultation 19 Aug – 9 Sept FMR to be submitted to Ofgem for decision [23 Sept] Supporting documents Consultation [25 Aug – 22 Sept] Submit to Ofgem for decision [28 Sept]