Modification Proposal 115 – ‘Correct Apportionment of NDM Error’

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
DESC Action DE0301 & DE0302 (New Project Nexus Allocation Algorithm) 4th April 2012.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
Mod 0194 Presentation on the conclusions reached by British Gas Nick Wye On behalf of the I&C Group.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
Supplier Energy Theft Scheme 10 th August Introduction The following slides are only intended as a strawman proposal on how a Supplier Energy.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
UNC Modification Proposal 0202 National Grid Distribution
Options for Mod 640 Replacement
Performance Assurance Framework Risk Register Consultation Summary
Action 0002: Meter Error Notifications
Review Group 178 SSP as Domestic only.
Incentives 26 September 2018.
Orifice plate meter error resolution – cash flows
Modification th July 2008.
MOD 232 Proposal, Richard Dutton 16th December2008
CSEPs Reconciliation Proposals
Project Nexus Workgroup
UNC Modification Proposal 0362
Nexus Requirements To support the current business processes
Mod Proposal 0268 : AQ Backstop Date
Genuine Reconciliation
AUG Query Responses 21st November 2013.
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
Overview of RbD Risk Modelling 31 March 2008
Reconciliation Volume Impacts 25 January 2008
Modification Proposal 136
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
Unidentified Gas (UIG)
Development Work Group 194
Erika Melén, Senior Settlements Analyst Modification Proposal 141a
Enabling Large Scale Utilisation of Class 3
National Agent Scheme for Gas Theft Detection – Proposed Funding Arrangements Chris Hill – RWE Npower.
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Modification Proposal 115 – ‘Correct Apportionment of NDM Error’

Contents Process Walkthrough Overview of Measurement Issues & Incentives Reconciliation EUC charging bands Next steps

End to End Process Walkthrough 1 2 3, 4 5 6 7 Supplier Inputs Throughout the supply chain there are a number of areas where inaccurate measurement can occur. LDZ Off-take metering System leakage End user Theft Unregistered sites Supply point metering Supplier inputs e.g. AQ Review process Deeming algorithms

Overview of Measurement Issues and Incentives Potential Measurement Issue Measurement risk borne by SSP sector Evidence of Measurement more prevalent in SSP sector Incentives LDZ Off-take Metering Yes No Incentive on GDNO’s to gain reward by maximising throughput. System Leakage Shrinkage cost incentive on GDNO’s. Rewards under estimation of shrinkage methodology. End User Theft Perverse incentive on LSP shippers. Penalises detection of theft. Unregistered Sites No incentive upon LSP Shippers to identify unregistered sites. Supply Point Metering There are stronger incentives on SSP shippers. Supplier Inputs e.g. AQ Review process Greater perverse incentives on LSP shippers to use inappropriate behaviours. Deeming Algorithms

Reconciliation The normal effect of a reconciliation is to correct a discrepancy between deemed energy (derived from AQ’s) and actual usage (derived from meter readings). The net effect of LSP NDM reconciliations over the past 9 years have consistently resulted in net debits to RbD. Figures relating to last three years are: 2006 13.62 TWH 2005 11.03 TWH 2004 11.80 TWH This supports a view that there is a tendency for AQ’s to be over deemed. There are NO known reasons why SSP AQ’s would not be at least as over deemed as LSP AQ’s There is however stronger incentives on the SSP sector to prevent under deeming – because of the RbD mechanism itself There is no evidence of any under deeming of AQ’s in the SSP sector

Reconciliation (continued) The effect of a reconciliation to the SSP sector should be the application of a credit and not a charge. The RbD charge is a consequence of the various measurement deficiencies described earlier. The output from Domestic Monitor Panel, suggested that for gas years 2002/3, 2003/4 and 2004/5 there was c500 kwh per customer verification variance. This equates to c2.5% to 3% of underlying unverified SSP volumes being allocated each year. This is consistent with the results of our own analysis which we have undertaken internally.

Key Messages Throughout the supply chain there are multiple potential measurement failure points. The consequences of such measurement failures are borne by the SSP sector. There is no reason why the SSP sector should bear any more risk or reward than the LSP sector. There are numerous perverse incentives prevalent in the current arrangements. There is no evidence whatsoever that the outcome of any SSP reconciliations would result in the application of a charge to the SSP sector. On the contrary, DMP data, market sector analysis and extensive Centrica portfolio analysis all support the view that RbD should be borne equally by both the LSP and SSP sector.

EUC Charging Bands Transportation charges comprise a comparatively small proportion of the charges associated with RbD Three options where considered viable and analysis was undertaken, for the application of these charges to the LSP sector: Charge all sectors the same rate (i.e. SSP charge) This would have be consistent with the application of charges under the Mod 640 mechanism All sectors would receive equal treatment Charge the LSP sector an average of all SSP and LSP charging rates Charge the LSP sector an average of all LSP charging rates Initial analysis suggested that the vast majority of the LSP market would receive a rate equal or lower than it’s average charge rate. Centricas initial preference is for option (1) but is prepared to support either of the 3 options should a clear preference from the group exist.

Next Steps Completion of Workstream Report at March Distribution Workstream. Provision of Workstream Report to April Modification Panel for consideration and issue for consultation.