Communications Infrastructure Security, Access & Restoration Bruce Allan, Chairman November 6, 2003.

Slides:



Advertisements
Similar presentations
1 Industry Brief Apr Outline How is Alberta preparing? How is Alberta preparing? Albertas Health Response Albertas Health Response Albertas Operational.
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Computer Concepts – Illustrated 8th edition
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Planning Reports and Proposals
Copyright © 2001, Prentice Hall, Inc. CHAPTER 15.
Museum Presentation Intermuseum Conservation Association.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Improving the Effectiveness of Interviewer Administered Surveys though Refusal Avoidance Training Grace E. ONeill Presented by Anne Russell U.S. Census.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
David Burdett May 11, 2004 Package Binding for WS CDL.
SOA for EGovernment 1 Emergency Services Enterprise Framework: A Service-Oriented Approach Sukumar Dwarkanath COMCARE Michael Daconta Oberon Associates.
International Telecommunication Union Accra, Ghana, June 2009 Emergency Communications Systems: Nigeria Bashir Gwandu, PhD, MBA, CEng MIEE, MIEEE.
World Telecommunication Development Conference May to 4 June 2010, Hyderabad, India Programme 1 Resolution 47 Riccardo Passerini Telecommunication.
ITU SYMPOSIUM, Arusha 1-3 April 2003 TELECENTERS TO CONNECT AFRICA WORLDSPACE EXPERIENCE Roxana Dunnette dipl.eng.MS.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
ITU Case Studies for Serbia, Germany, Poland and Hungary Mr Peter Vari ITU Expert.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
The 5S numbers game..
Digital Communication in Emergency Management. Presenters Name June 17, 2003 What is FEMA? 7,382 employees; up to 12,000 reservists 10 Regional Offices;
Site Safety Plans PFN ME 35B.
SIMS-201 The Telephone System Wired and Wireless.
Computers Are Your Future © 2005 Prentice-Hall, Inc.
The basics for simulations
Homeland Security at the FCC July 10, FCCs Homeland Security Focus Interagency Partnerships Industry Partnerships Infrastructure Protection Communications.
1. 2 Earthquake effects on health care facilities 2.
Cable and Satellite From Principles of Electronic Media (Davie & Upshaw, 2006)
1 Audio Video Production History of American Broadcasting Copyright © Texas Education Agency, All rights reserved. Images and other multimedia content.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Media Channel Study Media Channel Study - 1 Contents Main Objectives2 Survey Method3 Media Channels Studied4 Executive Summary5 Detailed Findings6.
1 Phase III: Planning Action Developing Improvement Plans.
Clock will move after 1 minute
WARNING This CD is protected by Copyright Laws. FOR HOME USE ONLY. Unauthorised copying, adaptation, rental, lending, distribution, extraction, charging.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Response Operations During and After a Space Weather Event Response Operations During and After a Space Weather Event 3 March 2011.
1 Amateur Radio Presentation. 2 Media Security and Reliability Council
1 IPAWS: The Integrated Public Alert and Warning System.
Disaster Recovery Planning Because It’s Time! Copyright Columbia University and Bentley College, This work is the intellectual property of the author.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Georgia Interoperability Network
1 Integrated Public Alert and Warning System (IPAWS) Overview and Commercial Mobile Alert System CMAS Introduction August 2009.
Working Group 2: Next Generation Alerting December 16, 2011 Co-Chairs: Damon Penn, Asst. Administrator, Nat’l Continuity Programs, DHS-FEMA Scott Tollefsen,
Disaster Communications System (DCS) Overview for State and Local Governments National Conference on Emergency Communications (NCEC) Panel 5: State and.
SHORT WAVE SERVICES: The Gateway to Africa August 2012.
1 Market Launch Presentation. 2 Media Security and Reliability Council
ENP Study Group Disaster Planning Session #6 BROUGHT TO YOU BY: THE FLORIDA NENA EDUCATION COMMITTEE.
Lisa Wood, CISA, CBRM, CBRA Compliance Auditor, Cyber Security
A Major Business Disruption A Strategy for Minimising the Downtime Anthony Hegarty Mitigating Risks.
SENTECH SHORTWAVE SERVICES:
Bruce Allan, Chairman November 6, 2002 Communications Infrastructure Security, Access & Restoration.
1 MSRC II David Barrett, Chairman, MSRC II November 30, 2005 President and CEO Hearst-Argyle Television.
1 Crisis Management / Emergency Management Overview.
1 Public Safety and Homeland Security Bureau Report: Presentation to the Commission January 15, 2009.
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
COMMISSION PRESENTATION January 13, Increase Access to Broadband Cable Modem Subscribers.
Timothy Putprush Baltimore, MD September 30, 2009 Federal Emergency Management Agency (FEMA) Integrated Public Alert and Warning System Presentation to.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
EXPECT THE UNEXPECTED Prepare Your Business for Disaster.
Business Continuity Steven S. Keleman, CPM. Emergency Management Prevention Response Preparation Mitigation Recovery.
Integrated Public Alert and Warning System
DTV SAMARTH COLLEGE OF ENGINEERING &TECHNOLOLOGY DEPARTMENT OF ELECTRONIC & COMMUNICATION ENGINEERING Subject Code [ ] 5th semester (E&C)
Presentation transcript:

Communications Infrastructure Security, Access & Restoration Bruce Allan, Chairman November 6, 2003

22 Address the risks and vulnerabilities of our nation's television, radio, multi-channel video, microwave, and satellite infrastructure in the event of terrorist attack, natural disaster or other manmade catastrophe. Assess current security and restoration capabilities to identify best practices, needed enhancements, and recommended changes. Review current media infrastructure redundancy within and between each industry segment. Evaluate the impact of digital technology on security, infrastructure redundancy, and service restoration. Charter of Communications Infrastructure Working Group

3 Task ForcesChair PreventionGlenn Reitmeier, NBC RestorationBob Seidel, CBS Future Technologies/Ira Goldstone, Tribune Digital Solutions Working Group Organization

44 Media Survey MediaAssociation Survey Questionnaires Distributed RespondentsMarket Coverage RadioNAB % Television NAB APTS % CableNCTA221883% SatelliteSBCA22100%

55 Have a Disaster Recovery Plan Media Survey – Key Findings 15% 47% 71% Radio TVCable Have Rehearsed Their Disaster Recovery Plan Radio TV Cable 7% 17% 58% 7% 13% 11% Radio TVCable Have Reciprocity Agreements with Other Local Media Companies Updated Disaster Recovery Plan After 9/ % 36% 58% Radio TVCable

66 Media Survey – Key Findings Radio TVCable 72% 85% 87% Have Secure Access Radio TV 38% 80% Transmission Site News Origination Facilities

77 Have a Backup Transmitter and Antenna Capability Media Survey – Key Findings 54% Radio TV 43% Radio TV 60% 41% Have an Alternate Site for News/Programming Back up capabilities - Cable 76% of cable respondents receive their primary signal feed from over-the air broadcasters with limited backup capability 62% of the cable systems surveyed have redundant routes from headends to hubs 88% of cable subscribers are served by headends that have access to the internet 32% Radio TV 50% Can activate backup communication links to transmitters in 15 minutes

8 Best Practice Recommendations Prevention Prevention: Radio, Local Television & Cable Television: –Physical Security: Appropriate physical security, augmented by security personnel and/or video surveillance at all key facilities. –Backup Power: Diverse power grid sources Backup power at key facilities –Redundant Communications: Robust and redundant communications for external/remote news sources Backup signal feeds to primary satellite sites. Backup signal feeds to transmitter/hub sites. –Redundant Facilities: Broadcasters with local news origination should have emergency origination capability at a second location (e.g. backup studio, ENG truck). Geographically diverse backup transmitter access, if feasible. Collaborate with colleagues and government authorities to increase site diversity and redundancy.

9 Best Practice Recommendations Prevention Collaborative Planning All Local Media (e.g., Television Broadcasters, Cable Operators and Radio Broadcasters) in a market should collaborate to increase their collective geographic diversity and to establish redundant interconnections capable of supporting emergency operations. Television broadcasters should examine the possibility of using DTV facilities as backup for analog. Cable systems and local broadcasters in a market should work jointly to develop prevention plans. Cable systems should have some capability to obtain news and information in an emergency situation. (May include ENG/SNG trucks, satellite links or signal reception from local television broadcasters.) Radio broadcasters should work with television broadcasters and cable operators to establish diverse primary and backup signal feeds from local television broadcasters and cable systems for use in emergency situations.

10 The Restoration Task Force has been charged with assessing the communications industrys ability to restore broadcast service following a national disaster or terrorist attack First hand experience in responding to disaster situations has provided the basis for many of the recommended Restoration Best Practices: Hurricane Andrew (1992) World Trade Center (2001) N.E. Power Grid Failure (2003) The quickest and most effective restoration process results from broadcasters having redundant facilities, emergency back-up power, and a well prepared and rehearsed recovery plan. Restoration Working Group

11 Best Practice Recommendations Restoration Restoration: –Encourage radio and television broadcasters, cable companies, direct broadcast satellite (DBS) and digital satellite radio providers to develop and implement written disaster recovery plans to deal with short-term disruptions and catastrophic failure in primary transmission and studio facilities. –Urge local stations and other media organizations to update their disaster recovery plans as events warrant, and regularly conduct emergency drills at least once annually. –Establish market-by-market restoration committees consisting of all FCC licensees, MSOs and other electronic media including television, radio, cable DBS, digital satellite radio and telecommunications carriers.

12 Implement studio and transmitter operational reciprocity arrangements to ensure signal availability in all markets. Develop plans for utilization of ENG trucks as emergency alternate studios, with microwave links at transmitter sites for both analog and digital services. Create plans for alternate paths to cable headends. Alternate emergency distribution paths would include: – DTV transmitter to cable headend, down converted to NTSC. –SNG to DBS to cable headend and DBS to homes; –Cross-connecting cable systems. –Opening local-to-local DBS; –Opening local-to-local DBS service to all subscribers on an emergency basis. –Low data rate Internet links. –Portable microwave links. Best Practice Recommendations Restoration

13 Develop recovery timelines in situations where backup facilities exist. Stations with backup facilities should be prepared to provide service within 15 minutes of loss of primary facility. Propose that the Federal Emergency Management Agency (FEMA) administer emergency response broadcast equipment packages. –Regional storage depots for use only in emergency situations. –Mobile recovery systems to include: VHF, UHF, AM & FM transmission units. Mobile generators. 500-foot & 100-foot tower sections. Establish federal preemption authority during declared national emergencies for replacement towers and other essential broadcast and content delivery needs. Restore broadcast telecommunications. –Satellite phones to be available. –Stations encouraged to establish amateur radio facility in studio. –Utilize portable handheld units and alternate 450 MHz communications repeater sites. Best Practice Recommendations Restoration

14 Best Practice Recommendations Future Technologies/Digital Solutions –Leverage existing digital television tool-set, including over-the-air, cable and satellite, to develop new emergency notification standards and practices. Use of multiple video and audio channels. Channel designation. Close captioning. ACAP middleware standard.

15 Sep-02Dec-02Mar-03Jun-03Sep-03Dec-03 Prevention Define Work Plan National Review Regional Review Metropolitan Review Restoration Evaluate Redundancy Develop Restoration Plan Digital Solutions Design Survey Work Group Meetings Aug 7th Cinti Dec 11th Wash March 19th Wash June 18th Wash Sept 17th Wash Chairman's Meetings Task Force Meetings Scheduled by Task Force Chairs Finalize Recommendations Jun-02 Document Current Restoration Capabilities/Deficiencies Review Digital Landscape Identify Issues/Solutions Monthly Conference Calls Working Group Calendar Tampa Model City Workshop Dec 2nd

16 Participate in Tampa Model City Workshop Finalize national level, DBS, and Satellite radio assessments Develop disaster recovery plan template Expand the pool of ideas and prototypes of digital applications Complete final report by February 29th. Next Steps