Project Cost as per DPP Total Project Cost GOB RPA DPA Total 103,46.49 Figure in Lac BDT Total Project Cost GOB RPA DPA Total 103,46.49 899,99.99 56,19.36 1059,65.84
GOB = 103,46.49 Salary & Allowance = 6% VAT & Tax = 92% Other = 2%
v+t Contract Amount A + 100-(v+t) x A A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax
v+t Tax Calculation A + 100-(v+t) x A x Tax % A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax
v+t VAT Calculation A + 100-(v+t) x A x VAT % A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax
A = 1,000,000.00 v = 10 % t = 5%
Contract Amount 10,00,000+ 10+5 x 10,00,000 100-(10+5)
Contract Amount = 1,176,470.59 v = ? t = ?
Contract A = 1,176,470.59 v = 117,647.06 t = 58,823.53
A = 1,000,000.00 v = 7 % t = 3%
Contract Amount = 1,111,111.11 v = ? t = ?
Contract Amount = 1,111,111.11 v = 77,777.78 t = 33,333.33