PQB Meeting March 05, 2009.

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
PQB Photocathode Analyzing Power Study May 19, 2009.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Short Tutorial on Causes of Position Differences… …and what we can do about them (most slides stolen from Cates PAVI ’04 talk)
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
PQB Meeting Intermediate Frequency (IF) Cards Study & BPMs Summary March 24, 2009.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Fast Helicity Reversal Riad Suleiman Injector Group June 2, 2009.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Parity Quality Beam (PQB) Study Injector Group September 2008.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
PREX Issues. Outline New issue: souce systematics and Aug. 07 run. Update on old issues. Progress at SU.
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
A 500 MeV S-band Low Cost Electron Beam Source for ILC Keep Alive Source Goal: MeV, 3 nC, ~ 1 mm on ILC Ti Target Wei Gai, ANL.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Parity Violation Experiments & Beam Requirements
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
Jefferson Lab, Newport News, U.S.A.
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
DC Injector and Space Charge Simulation Status
Accelerator Physics Technical System Group Review
G0 Backward Angle Accelerator Preparations
G0 Accelerator Planning Meeting (11/1/05)
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
5 MeV Mott Measurement for CEBAF Operations group
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
QWeak Collaboration Meeting
Low Level RF Status Outline LLRF controls system overview
Qweak Coordination Meeting
Polarized Source Development Run Results
Adiabatic Damping and Parity Quality of Low Energy
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Injector Studies Using Superlattice Photocathode
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
Advanced Research Electron Accelerator Laboratory
Low Level RF Status Outline LLRF controls system overview
Polarized Source: Recent Activities
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
Operational Experience with LCLS RF systems
B-Team Meeting October 28, 2009
Spot-Size Reduction 4/5/2017.
Injector Commissioning & Optimization
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Isotope Readiness Review Run Plans
Presentation transcript:

PQB Meeting March 05, 2009

PQB Tasks Task: Fast Helicity Reversal Required by Qweak – Hall B knows. Does Hall A want Fast Reversal? Everyone needs to know. Status: 30 Hz Reversal: The standard PQB at 30 Hz Reversal was achieved. 250 Hz Reversal: The PQB was similar to 30 Hz Reversal otherwise for the very large 60 Hz line noise in position differences. 1 kHz Reversal: The PQB was very similar to 30 Hz Reversal (even better), less sensitive to 60 Hz line noise than at 250 Hz Reversal. Issues: Parity DAQ did work at 1 kHz and 500, 100 and 60 µs but partially with 10 µs. BPMs “Transport” style IF cards are affecting short T-Settle studies: Changed iocse11 IF cards to “LINAC”– almost finished with analysis – once done, request to change: Injector iocse12 and iocse19. Hall C iocse18 and iocse14 (Hall C iocse17 has “LINAC” IF cards). Hall A? First, what about fast reversal? Need to find the “right” T-Settle (ideally 50 µs).

Build new Helicity Board: Charge Feedback: New feedback scheme needed: No slow controls (EPICS), zeroed the asymmetry for each of the 4-helicity sequences. Requires new hardware: Use “Injector Net” for faster communications. New IA Electronics. New Helicity Board: 2 new outputs to the IA. Build new Helicity Board: Goal: easy to program, more outputs (IA, Clock). Will meet soon to write a spec sheet. Check Helicity Magnets, Mott Polarimeters at 1 kHz: Checked fine at 250 Hz last year. Need to check at 1 kHz – need new IF cards in the 5 MeV region. Eliminate 60 Hz Line Noise: Found noise from 500 keV PSS Dipole Current Sensor – will be fixed. More noise still there; Ion Pumps VIP0L02/3 local power supplies (ATLis Task submitted).

Task: Halls Crosstalk and the Effect on Parity Quality Beam Did Hall C current and laser phase scans and measured Hall A PQB in Injector – No crosstalk observed, repeat once QE is bad. Did Hall C IA scan and measured Hall A charge asymmetry in Injector (change charge asymmetry of one beam, measure effect on the other) – No crosstalk observed. Need to measure crosstalk in the Halls to look for RF beam loading (ATLis Task submitted). Task: Eliminate the Vacuum Window Birefringence by Rotating the LLGun2 Photocathode Tried once (see plot on next slide). Repeat again before photocathode activation. Task: Accelerator FFB Measurement of PQB: Runs fine on Hall A iocse9 and Hall C iocse14. Need to implement in Injector iocs.

PC OFF 1 kHz 100 µs TRANSPORT IF Cards

PC ON 1 kHz 100 µs TRANSPORT IF Cards

PC ON 1 kHz 100 µs New LINAC IF Cards

The Photocathode Rotation