Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration

Slides:



Advertisements
Similar presentations
LCGT Program Advisory Board (June , Kashiwa, Chiba) On behalf of LCGT special working group Masaki Ando (Department of Physics, Kyoto University)
Advertisements

BS and Mirrors for the LCGT Norikatsu Mio, PSC Univ. of Tokyo Eiichi Hirose, ICRR Univ. of Tokyo December 13, 2011 CSIRO, Lindfield Australia.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Cryo-payload Kazuhiro Yamamoto Institute for Cosmic Ray Research
Status of LCGT and CLIO Masatake Ohashi (ICRR, The University of TOKYO) and LCGT, CLIO collaborators TAUP2007 Sendai, Japan 2007/9/12.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
T Akutsu 1, S Telada 2, T Uchiyama 1, S Miyoki 1, K Yamamoto 1, M Ohashi 1, K Kuroda 1, N Kanda 3 and CLIO Collaboration. 1 ICRR, Univ. of Tokyo, 2 AIST,
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
2009/6/25Amaldi 8 in NewYork City1 Thermal-noise-limited underground interferometer CLIO Kazuhiro Agatsuma and CLIO Collaborators Institute for Cosmic.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The University of Tokyo KAGRA external review (Cryogenic payload) 18 April 2012.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Summary of iKAGRA Test Run Apr 11-25, 2016 Yuta Michimura Department of Physics, University of Tokyo May 9, 2016JGW-T
Vibration measurements at KAGRA site
Cryogenic development in KAGRA
Performance test of KAGRA cryostat at site
Main Interferometer Subsystem
Possible KAGRA Upgrades
Main Interferometer Subsystem
KAGRA+ Upgrade Plans Yuta Michimura1, Kentaro Komori1
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
Kazuhiro Yamamoto on behalf of KAGRA collaboration
Performance test of KAGRA cryostat at site
Yuta Michimura Department of Physics, University of Tokyo
Radiation shield vibration measurement at KAGRA site
Kazuaki Kuroda On behalf of LCGT Collaboration
Vibration measurements at KAGRA site
Yoichi Aso on behalf of the LCGT ISC Group
Control of the KAGRA Cryogenic Vibration Isolation System
Vibration Isolation Systems
KAGRA+ Upgrade Plans Yuta Michimura1, Kentaro Komori1
Possible KAGRA Upgrades
Possibility of Upgrading KAGRA
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
KAGRA+ Upgrade Plans Yuta Michimura1, Kentaro Komori1
Possible KAGRA Upgrades
KAGRA+ Upgrade Plans Yuta Michimura1, Kentaro Komori1
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of Issues for KAGRA+
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
Development of vibration isolation systems for LCGT VII
KAGRA – 3km Cryogenic Laser Interferometer
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Presentation transcript:

Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration ELiTES 5th general meeting Feb 8, 2017 Status of KAGRA Yuta Michimura Department of Physics, University of Tokyo on behalf of the KAGRA Collaboration

KAGRA Project Constructed in Kamioka mine Underground and cryogenic 300+ collaborators from 90+ institutes Kamioka

Roadmap of KAGRA Completed first test run at room temperature. Working for cryogenic test run. Baseline KAGRA (bKAGRA) in 3 phases. 2016 2017 2018 2019 2020 Suspension installation Cryogenics development Cryo. payload installation Cryo. payload upgrade Cool down Cool down IFO upgrade Noise hunting Initial KAGRA Michelson at room temp. Test run Phase 1 Michelson at cryogenic temp. Test run Phase 2 RSE at cryogenic temp. Test run Phase 3 RSE at cryogenic temp. Observation run

Observation Scenario With 25-40 Mpc in 2020, 40-140 Mpc in 2021 Living Reviews in Relativity 19, 1 (2016) to be updated

KAGRA Full Configuration RSE interferometer Sapphire test masses at 23 K ETMY Sapphire 23 K 3 km IMC ITMY PRM PR2 IFI ITMX ETMX Laser 1064 nm 200 W 3 km BS PR3 SR2 SR3 SRM GW signal

Initial KAGRA Configuration 3 km Michelson at room temperature Low power Simplified suspension At air pressure ETMY IMC PR2 IFI ETMX Laser 1064 nm 2 W BS PR3 GW Signal

iKAGRA Test Run in 2016 Period - March 25 to 31 - April 11 to 25 Purpose - confirm layout of the 3 km vacuum ducts - test controls, data transfer, observation shift, etc. - get environmental data - obtain experiences of the management and operation of the km-class interferometer http://kyodonews.net/news/2016/03/25/54510

iKAGRA Sensitivity ~3e-15 /rtHz @ 100 Hz Limited by seismic noise, acoustic noise and ADC noise Reduction possible in bKAGRA seismic noise acoustic noise ADC noise plot by T. Shimoda, M. Nakano, Y. Michimura

Data Transfer Real time transfer to ICRR Kashiwa and Osaka City Univ. (~3 sec latency, ~ 200 MB/sec) Delayed mirroring at Academia Sinica, Taiwan and KISTI, Daejeon 7.5 TB in total figure by N. Kanda

Hardware Injection Right after 2nd iKAGRA run signal injection Right after 2nd iKAGRA run Gravitational waveforms of CBC, Supernovae, etc. Important end-to-end test Laser Data Acquisition Transfer Analysis GW?

Next step: bKAGRA Phase 1 3 km Michelson Sapphire ETMs at cryogenic temperature Deadline: March 2018 ETMY Cryogenic sapphire IMC PRM PR2 IFI ETMX Laser 1064 nm 2 W misaligned BS PR3 SR2 SR3 GW signal

bKAGRA Phase 1 Schedule More suspensions, cryogenics, PSL upgrade PR3 2017 2018 1 2 3 4 5 6 7 8 9 10 11 12 PR3 PRM PR2 BS SR2 SR3 ETMY upper ETMX upper ETMY cryo-payload ETMX cryo-payload ETMs coating HCB ETMY cool down PSL upgrade ETMX cool down IMC initial alignment Lock

Suspension Installation Test hanging, pre-assembly on-going at the site ETMY BS PR3

Cryogenics Magnetic noise, vibration measurements at cryostats at the site on-going Cryopayload test at KEK, HCB test at NAOJ Risk of ETM coating delay (preparing spares) accelerometer test assembly HCB test

Input Optics Upgrade Input Mode Cleaner (IMC) magnets replaced Input Mode Matching Telescope (IMMT) suspensions installed iKAGRA Pre-stabilized Laser (PSL) disassembled, bKAGRA PSL being assembled IMMT1 iKAGRA PSL (gone!)

Summary Successfully completed the first test run at room temperature (iKAGRA) Working hard for the first cryogenic test run by March 2018 (bKAGRA Phase 1) The first observation run in ~2020 Stay tuned to KAGRA elog (klog) http://klog.icrr.u-tokyo.ac.jp/osl/

Extra Slides

KAGRA Sensitivity If sapphire mirrors are at 23 K, input power is at 55 W