Closing Report Date: 2015-07-17 Authors: July 2015 July 2013 doc.: IEEE 802.11-13/0900r0 July 2015 Closing Report Date: 2015-07-17 Authors: Clint Chaplin, Chair (Imagicon) Clint Chaplin, Chair (Samsung)
Closing report for WNG SC for July 2015, Waikoloa, Hawaii, Hawaii, USA doc.: IEEE 802.11-13/0900r0 July 2015 Abstract Closing report for WNG SC for July 2015, Waikoloa, Hawaii, Hawaii, USA Clint Chaplin, Chair (Imagicon) Clint Chaplin, Chair (Samsung)
Presentations at July 2015 meeting doc.: IEEE 802.11-13/0900r0 July 2015 Presentations at July 2015 meeting Traffic steering between 802.11 and LTE on Self-Organizing Networks use case from SEMAFOUR (11-15-0847-01-0wng-SEMAFOUR_LTE_WiFi_Network_Access_Selection.pdf) – Thomas Kuerner Integrated Long Range Low Power Operation for IoT (11-15-0775-01-0wng-integrated-long-range-low-power-operation.pptx) – Tim Godfrey Regulatory frame work for the expansion of 802.11ac to 6-10GHz (11-15-0776-02-0wng-regulatory-framework-for-expansion-of-802-11ac-to-6-10ghz.pptx) – Friedbert Berens Minutes 11-15-0912-00-0wng-july-2015-wng-meeting-minutes-waikoloa.doc Plans for September 2015 1 2 hour session Clint Chaplin, Chair (Imagicon) Clint Chaplin, Chair (Samsung)