EPA Region IV and ADEM NPDES Permit Coordination

Slides:



Advertisements
Similar presentations
Whole Effluent Toxicity (WET) Testing Water Quality Standards Workgroup Meeting June 26, 2007.
Advertisements

Clean Water Act Section 402 Issues Facing Kentucky Kentucky Professional Engineers in Mining Seminar September 6, 2013 Lloyd Cress, Kentucky Coal Association.
Clean Water Act Permitting and Operational Discharges from Vessels An Overview February 2007.
Glenda L. Dean Water Division Chief Alabama Department of Environmental Management November 7, 2012 Manufacture Alabama Environmental Conference Prattville,
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Adem.alabama.gov Association of County Commissions of Alabama December 4, 2014 Montgomery, Alabama Small Mining General Permit Jeffery W. Kitchens, Chief.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
Title V Program Evaluations 1 st Round Overview Gregg Worley Section Chief Air Permits Section EPA Region IV.
Proposed Amendments to Chapter 15 Article III Air Quality Control Public Hearing Presented by the Orange County Environmental Protection Division June.
Total Maximum Daily Loads in MS4 Storm Water Programs.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Administrative Law The Enactment of Rules and Regulations.
Adem.alabama.gov ADEM’s Monitoring Summary Reports Alabama – Tombigbee CWP Stakeholders Meeting Montgomery, Alabama 3 February 2010 Lisa Huff – ADEM Field.
Jamie Doucett MassDEP. What Problems Are We Solving? Current regulations are inadequate to address technologies other than recycling and composting Are.
Bacteria Rulemaking Inclusion of Bacteria Limits in TPDES Permits.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Storm Water Permit Program Authority to regulate storm water discharges derives from 40 CFR Illinois EPA is delegated authority to administer this.
 40 CFR § (d)(1)(v) “(W)hen the permitting authority determines, using the procedures in paragraph (d)(1)(ii) of this section, toxicity testing.
 40 CFR § (d)(1)(v) “(W)hen the permitting authority determines, using the procedures in paragraph (d)(1)(ii) of this section, toxicity testing.
Connie Brower NC DENR Division of Water Resources.
 40 CFR § (d)(1)(v) “(W)hen the permitting authority determines, using the procedures in paragraph (d)(1)(ii) of this section, toxicity testing.
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
Arkansas Dept. of Environmental Quality Regulation No
Framework for CSO Control Planning
Evan Kane, DWR Ken Pickle, DEMLR Jon RisGAARD, DWR
Overview of Part 213 Amendments Senate Bill 717 – Act 381 of 2016
Ohio Department of Transportation
Waste Discharge Permit: Paradise Irrigation District
HB 328 SITING OF SOLID WASTE MANAGEMNT FACILITIES
Highlights of the New NPDES Permit
2017 Environmental Trade Fair Shannon Gibson
Environmental Protection Agency
Introduction to Air Quality Permitting
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Module 19a: Water Quality Certification
NRC Export and Import Licensing 10 CFR Part 110
Triennial Review of Water Quality Standards Proposed Rulemaking
NH MS4 Stormwater Permit -- Guidance for NHDES related provisions
Compliance Monitoring Activities State Inspections
Overview of the Reissuance of 401 Water Quality General Certifications
Sacramento County Stormwater Quality Program
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
Division of Mining & Reclamation
DEEP Changes to Pretreatment Programs
Unresolved Reg 2 Issues and Triennial Review Preview Raymond E
Michigan Dept. of Environmental Quality Water Resources Division
Single Event Violations
Environmental Management Commission January 10, 2013
Department of Environmental Quality
LEGAL UPDATES IN WATER LAW
John Tinger U.S. EPA Region IX
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Enforcing the NAAQS Case Study Sean Taylor
Class I Redesignations
Westcas position paper
Wastewater Permitting Updates
Air Quality Permitting
Update on Whole Effluent Toxicity (WET)
TCEQ Environmental Trade Fair Water Quality Division
Update on Whole Effluent Toxicity (WET)
Indiana Department of Environmental Management Office of Water Quality
Sacramento County Stormwater Quality Program
May 15, 2018 David Paylor, Director
Procedures to Implement the Texas Surface Water Quality Standards
From Sewers to Sanddabs: Orange County Sanitation District
Presentation transcript:

EPA Region IV and ADEM NPDES Permit Coordination CMAA Annual Meeting May 28, 2015 Orange Beach, Alabama Glenda Dean Alabama Department of Environmental Management adem.alabama.gov

Presentation Overview Discussion of the EPA and State NPDES permit coordination process and recent issues that in the future have the potential to significantly impact regulated entities

2008 ADEM / EPA Memorandum of Agreement ADEM / EPA Memorandum of Agreement (MOA) Primary Sections are: Review of New or Revised Rules, Regulations or Statutes State and EPA Responsibilities Permit Review and Issuances* Compliance Monitoring and Evaluation Program Enforcement Pretreatment Program Review * Permit Review Section based on Applicable Federal Regulations established at 40 CFR Parts 122 and 123

Permit Review and Issuances EPA “Draft” Permit Review 30 Day Review Timeframe (General Permits 90 Days) EPA may Extend Review to Full 90 Days EPA may Provide Written Comments, Recommendations or Objection If Interim Objection, EPA has 90 Days to provide Specific Grounds for Objection If General Objection, EPA has Remainder of 90 Days to provide Specific Grounds for Objection

2008 ADEM / EPA Memorandum of Agreement EPA “Proposed” Permit Review EPA Review Waived Unless: State proposes to issue a Permit Significantly Different from Draft Permit; EPA has provided Objections to Draft Permit; Significant Comments were Received During Public Hearing and/or Public Notice; or Significant Issues were raised by a State which may be affected by the Discharge. If any of the above, then EPA has 15 Days to Review the Proposed Permit, including Comments and Response to Comments, unless EPA Extends Review to Full 90 Days

2008 ADEM / EPA Memorandum of Agreement General Objections to a “Draft” or “Proposed” Permit Specific Grounds shall Include: Reasons for Objection, Including Sections of CWA or Regulations; and Actions that must be taken to Eliminate the Objection. If State Fails to Either Request a Hearing on the EPA Objection or Resubmit a Revised Permit within 90 Days of Receipt of the Objection, then Exclusive Authority to Issue the Permit Passes to EPA for One Permit Term.

Recent EPA Comments: Coal Mine Permits Prior to Jan 2015, 90 Day Extension for Review of most Draft Coal Permits EPA Comments/Recommendations focused primarily on: Application Data Effluent and/or In-Stream Sampling – Representative and Proximity to Drinking Water Intake(s) Permit Conditions Effluent and/or In-Stream Monitoring Wet Limits (Acute vs. Chronic) Adaptive Management Plans (AMPs) In-Stream Biological-Based Limits Specific Conductance (SC) / Total Dissolved Solids (TDS) Requirements

Adaptive Management Plan (AMP) Incorporates Best Management Practices (BMP)-Based Thresholds Triggers for SC, WET, and In-Stream Biological-Based Limits Failures; and Corrective Action when Triggers are reached. WET and In-Stream Biological-Based Limits would be Independent and Enforceable Conditions of the Permit Separate from the AMP

EPA Rationale EPA Interpretation/Protection of State Narrative Water Quality Standards Reasonable Potential Analysis (RPA) for Narrative Standards In-Stream Data for SC, TDS and Macroinvertebrate Data WET Effluent Data

Discussion Outcome Discussions with EPA Resulted in: AMP and Biological-Based Limits would not be required Continue Current Effluent TDS and WET Monitoring Requirements Continue RPA based on Application Data, Available In-Stream Water Quality Data Add Sulfates to ADEM Trend Stations

In Closing On-going issue with Interpretation of State Narrative Quality Standards In future will not be surprised if EPA revisits AMP and Biological-Based Limits Appears EPA still considers SC a “Pollutant”

Contact Information Glenda Dean Chief, Water Division gld@adem.state.al.us 334-271-7823 Jeff Kitchens Chief, SW Management Branch jwk@adem.state.al.us 334-271-7974 Catherine McNeil Chief, Mining and Natural Resource Section CMcNeil@adem.state.al.us 334-271-7835