Risky Business Standalone ISO9001:2015 Risk-Based Thinking and Integration of Risk Management with ISO9001:2015.

Slides:



Advertisements
Similar presentations
Internal Control–Integrated Framework
Advertisements

International Risk Management Standard AS/NZS ISO 31000
PROJECT RISK MANAGEMENT
Lisanne Sison Director ERM Bickmore
Service Design – Section 4.5 Service Continuity Management.
Overview of Key Rule Features
TEMPUS ME-TEMPUS-JPHES
ISO 9001:2015 “Risk Based Thinking”
8 Managing Risk Teaching Strategies
RISK MANAGEMENT IN SOFTWARE ENGINEERING RISK MANAGEMENT IN SOFTWARE ENGINEERING Prepared by Prepared by Sneha Mudumba Sneha Mudumba.
A Review ISO 9001:2015 Draft What’s Important to Know Now
ISO 9001:2015 “Risk Based Thinking”
CSR Project, 3 cr. Corporate Responsibility, C-module (15 cr.) or free-choise studies Introduction to Corporate responsibility, 1,5-3 cr. (depending on.
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Creating a Risk-Based CAPA Process
Developing a result-oriented Operational Plan Training
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
THE PROCESS APPROACH. Basic Concepts of Quality Outline Introduction to the Process Approach Types of Process Identification of Processes Process Analysis.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
The common structure and ISO 9001:2015 additions
ISO 9001:2015 Risk-based thinking
Project Management Risk and Quality.
BSBPMG508A Manage Project Risk Manage Project Risk Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG508A.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
TEMPUS ME-TEMPUS-JPHES “IMPROVEMENT OF PARTNERSHIP WITH ENTERPISES BY ENHENCEMENT OF A REGIONAL QUALITY MANAGEMENT POTENTIALS IN WBC” TEMPUS
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
ISO 9001:2015 Risk-based thinking
ISO 9001:2015 Risk-based thinking
Steve Barfoot, President Advantage International Registrar, Inc.
An Overview on Risk Management
Training Course on Integrated Management System for Regulatory Body
Software Risk Management
BUSINESS DRIVEN TECHNOLOGY
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
8 Managing Risk (Premium).
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
Risk Management for Technology Projects
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Fundamentals of ISO.
Quality Risk Management
INTRODUCTION TO ISO 9001:2015 FOR IMPLEMENTATION Varinder Kumar CISA, ISO27001 LA, ISO 9001 LA, ITIL, CEH, MEPGP IT, Certificate course in PII & Privacy.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Quality Management Systems – Requirements
ISO 9001:2015 versus ISO 9001:2008 And ISO 9000:2015 – Fundamentals and vocabulary versus ISO 9000:2005.
Presented By: Daniel J. Brown, CQA
ISO 9001:2015 What you need to know
Agenda Who are we? 1 Introductions Journey so far 2
Transition ISO 9001:2008 to ISO 9001:2015
Risk Management with Minimum Weight
Risk management in Software Engineering
Integrated Management System
Edit Nemeth, Vice Chair of IACOP
Edit Nemeth, Vice Chair of IACOP
Risk Management Process (Revised)
ISO 9001:2015 Risk-based thinking
ISO 9001:2015 Risk-based thinking
Failure Mode and Effect Analysis
ET-CAC Report Kevin ALDER Agenda item 6-3 (1)
ISO 9001:2015 FOR BUSINESS DEVELOPMENT
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
A New Concept for Laboratory Quality Management Systems
PFMEA Summary Process Steps
Presentation transcript:

Risky Business Standalone ISO9001:2015 Risk-Based Thinking and Integration of Risk Management with ISO9001:2015

Presenters Clark Leiphart Senior Quality Engineer, Modular Mining Christina Cook, J.D. Manager, Global Commercial Operations, Modular Mining.

Outline Definitions Simple Method for using risk with ISO9001 More Comprehensive Method for using ISO31000 risk principles Tools and further research

Risk –Definitions PMI: An uncertain event that, if it occurs, has a positive or negative effect on a project’s objectives. ISO9000: risk: effect of uncertainty Note 1 to entry: An effect is a deviation from the expected — positive or negative. Note 2 to entry: Uncertainty is the state, even partial, of deficiency of information (3.8.2) related to, understanding, or knowledge of, an event, its consequence, or likelihood. Note 3 to entry: Risk is often characterized by reference to potential events (as defined in ISO Guide 73:2009, 3.5.1.3) and consequences (as defined in ISO Guide 73:2009, 3.6.1.3), or a combination of these. Note 4 to entry: Risk is often expressed in terms of a combination of the consequences of an event (including changes in circumstances) and the associated likelihood (as defined in ISO Guide 73:2009, 3.6.1.1) of occurrence. Note 5 to entry: The word “risk” is sometimes used when there is the possibility of only negative consequences.

Risk –Definitions and Assumptions ISO9001 Assumptions: The concept of risk has always been a component of ISO 9001 and ISO 14001, by requiring the organization to plan its processes and manage its business to avoid undesirable results. Organizations have typically done this by putting greater emphasis on planning and controlling processes that have the biggest impact on the quality of the products and services they provide. The way in which organizations manage risk varies depending on their business context (e.g. the criticality of the products and services being provided, complexity of the processes, and the potential consequences of failure)

Risk –Definitions and Assumptions ISO31000 Assumptions: Risk management is a central part of the strategic management of any organization. It is the process whereby organizations methodically address the risks attached to their activities. This is a process-based approach: 9001 Nomenclature 31000 Nomenclature Plan Design Do Implement Check Monitor Act Improve

9001:2015 Risky Excerpts Context of the Organizations Clause 4.4 f) - QMS and its processes - determine the risks and opportunities in accordance with the requirements of 6.1.1 (see below) and plan and implement the appropriate actions to address them Leadership Clause 5.1.1d) promoting the use of the process approach and risk based thinking Clause 5.1.2 b) Customer Focus - the risks and opportunities that can affect conformity of products and services…..

9001:2015 Risky Excerpts Planning Clause 6.1.1 & 6.1.2 - Actions to address risk and opportunities.. proportionate to the potential impact….. Operation 8.1 Operational planning and control - review the consequences of unintended changes taking action to mitigate any adverse effects, as necessary

9001:2015 Example Combining Management Review, Auditing and Corrective/Preventive Action Systematically As a part of Management Review, we deal with opportunities and problems on the basis of a simple model: Risk / Consequence High Med Low Vote

9001:2015 Example Management Review – Within each area of the agenda, order items on the basis of risk, and assure adequate assignment of resources. ISO 9001 Customer Feedback (ticket surveys, escalations, customer visits, and field campaigns) ISO 9001 Process and Product Conformity(risk based) ISO 9001 Audit Planning and Results-(risk based) ISO 9001 Update on status of Corrective and Preventive Actions(risk based) ISO 9001 Risk Assessment and Management based on results of 1-4(prioritized) Changes to the ISO9001 quality management system and recommendations for QMS improvement Review/Follow Up on Prioritized Action Items

9001:2015 Example Auditing

9001:2015 Example CAPAs

31000 Risky Excerpts Establishing the context Risk Identification Risk Analysis Risk Evaluation Risk Treatment Periodic Monitoring and Review

31000 Risk Template

31000 Risk Template

9001:2015 and 31000 Examples Concluding Thoughts Even though 9001:2015 does not REQUIRE a formal risk management methodology, there is an opportunity to consistently use risk management throughout a company, on products and services offered to customers, as well as on internal operational processes. The integration and management of risk across the organization should yield an increase in operational efficiency and a common internal vocabulary to pursue opportunities and reduce unintended consequences.

Links and References To be added before uploading to ASQ0707