C200, C200N, C200Z (2½ ” – 10”) C200A (2½ ”- 6”).

Slides:



Advertisements
Similar presentations
350, 350XL 1¼ - 2. Modification Overview Production of the 1¼ began in 2004 and is current. Production of the 1¼ began in 2004 and is current.
Advertisements

RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
”-10”.
½”-10”.
475, 475V, 475XL 4”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
720A ½”-2”.
420, 420XL ¾”-1”.
007 2½”-3”.
RPDA 4AN 21/2” – 6”.
2000SS 2½”-12”.
DCDA4A 21/2” – 6”.
DCDA4AN 2½” – 6”.
830, 831 4”- 6”.
DCV, DCVE ½”-2”.
007DCDA 2½”-3”.
½”- 2”.
3000CIV 21/2”-10”.
½”-10”.
007DCDA 2”.
450 2½”- 3”.
DC4A (LF) ½”-2”.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
909 3/4”-2”.
4000B (M3) ½”-2”.
850 2½”-10”.
DC-500 ½”- 1”.
LF856 2½”-10”.
350, 350XL ¾”- 1”.
850 (LF) ½”- 2”.
2000SS 2½”-12”.
DC4A 21/2” – 6”.
975 2½”-10”.
3000B 2”.
774 2½”-12”.
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C400, C400N, C400Z 21/2”-10”.
C300, C300N, C300Z (21/2”–10”) C300A (21/2”- 6”).
2000CIV 2½ ”-10”.
007 2½”-3”.
375DA 2½”-10”.
919 ¾”-2”.
950DA 21/2”-10”.
007DCDA 2½”-3”.
M400, M400N, M400Z 21/2”-10”.
757DCDA, 757N DCDA (21/2”–10”) 757A DCDA (21/2”- 6”)
007DCDA 2”.
3000B 2”.
2000B (M3) ½”-2”.
DC4AN 2½” – 6”.
450DA 4”-10”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
709 3/4”-2”.
709 2½ ”-10”.
Presentation transcript:

C200, C200N, C200Z (2½ ” – 10”) C200A (2½ ”- 6”)

Modification Overview Production began in 2000 under the Hunter name. In 2002 it was produced as the Ames Colt (C) Series. (a) suffix after the model number indicates the original version that contains a bi-link check valve. Discontinued in 2008. The current version contains a tri-link check valve. Repair steps are the same for both check models.

Check Cover Removal 21/2”-6” Cover slides back and is o-ring sealed. Remove test cock # 3 from the body. Insert a screwdriver through the hole on top of the cover sleeve. Using both hands, rotate the cover ¼ turn clockwise and counter-clockwise to break o-ring seal.

Check Cover Removal 21/2”-6” Slowly slide the cover sleeve to the downstream side of the housing. Once fully pulled back, turn the sleeve 90 degrees.

Check Valve Removal 21/2”-6” Check valve modules. Modules are o-ring sealed. Remove the check retainer. Remove check 1 first, then check 2. Using a flat blade screwdriver, gently pry the module out of the body.

Check Cover Removal 8”-10” For the 8-10” sizes, remove both Victaulic couplers. Remove test cock # 3 from the body. Slide the cover downstream.

Check Valve Removal 8”-10” Modules are o-ring sealed. Remove the 3 check retainers. Remove check 1 first, then check 2. Using a flat blade screwdriver, gently pry the module out of the body.

Check Seat Removal The check seat is part of the module. If seat is damaged, the entire module will have to be replaced.

Check Disc Replacement 21/2”-4” The check modules are spring loaded. Insert a screwdriver through the hole in the linkage and let it rest in the arbors on the module. Remove the “E”-clip and pin connecting the linkage. The clapper will open with no tension.

Check Disc Replacement 21/2”-4” Remove the screws on the disc retainer. Once disc is replaced, reassemble in reverse order. Do not remove the spring assembly.

Check Disc Replacement 6”-10” Locate the service hole on the side of the check module. Use a ½”-13 x 5 fully threaded bolt. Thread the bolt until the hole in the linkage is aligned with the notches in the spring arbors. Insert a long phillips screwdriver through the hole and arbors.

Check Disc Replacement 6”-10” Back the bolt out until the spring tension is transferred to the screwdriver. Remove retaining clip and pin from linkage. Spring assembly can be removed from the module. Remove screws from disc retainer.

Check Valve Reassembly Notes Reassemble check valves in reverse order. Apply lubricant to o-rings. Replace check 2 first, then check 1.