HAM SAS Test Plan at LASTI

Slides:



Advertisements
Similar presentations
Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Advertisements

LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
One Arm Cavity M0 L1 L2 TM M0 L1 L2 TRIPLE QUAD 16m R = 20m, T=1% R = ∞, T=1%  Optimally coupled cavity (no mode matched light reflected back)  Finesse.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
1 LIGO-G v3 Transmission Monitoring Telescope and Suspension – TMS Eric Gustafson aLIGO NSF Review LIGO Livingston Observatory April 25-27, 2011.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
Review of HAM Suspension Designs for Advanced LIGO Norna A Robertson HAM Isolation Requirements Review Caltech, July 11th 2005.
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
LIGO Magnetic External Pre-Isolator Richard Mittleman, David Ottaway & Gregg Harry April 18, 2003.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
Investigation of the influence of suspended optic’s motion on LIGO detector sensitivity Sanichiro Yoshida Southeastern Louisiana University.
LIGO-G M Advanced LIGO1 Mass Limits & Balancing Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO-G D 1 MEPI electroMagnetic External Pre-Isolator Backup alternative to the Hydraulic actuator approach Goal: maximum commonality with HEPI.
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
22nd March 2005 LIGO-G R Passive attenuation for the LIGO Output mode cleaner; HAM SAS R. DeSalvo, S. Marka, V. Sannibale, A. Takamori, C. Torrie,
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Interferometer Control Matt Evans …talk mostly taken from…
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Conceptual Design for Advanced LIGO Suspensions Norna A Robertson University of Glasgow and Stanford University for the GEO suspension team +contribution.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
Cavity Work at LASTI LSC-VIRGO Meeting, Hannover - 24 th October 2007 Lisa Barsotti and Matthew Evans for the LASTI group G D.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
New in-air seismic attenuation system for the next generation gravitational wave detector M.R. Blom, A. Bertolini, E. Hennes, A. Schimmel, H.J. Bulten,
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Modeling of the Effects of Beam Fluctuations from LIGO’s Input Optics Nafis Jamal Shivanand Sanichiro Yoshida Biplab Bhawal LSC Conference Aug ’05 LIGO-G Z.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
LIGO-G W LIGO Detector Commissioning Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Institute for Cosmic Ray Research Univ. of Tokyo Development of an RSE Interferometer Using the Third Harmonic Demodulation LIGO-G Z Osamu Miyakawa,
Aligning Advanced Detectors L. Barsotti, M. Evans, P. Fritschel LIGO/MIT Understanding Detector Performance and Ground-Based Detector Designs LIGO-G
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
Optical Spring Experiments With The Glasgow 10m Prototype Interferometer Matt Edgar.
G R Interferometer Sensing & Control P Fritschel 8 Oct 02.
LSC Meeting Baton Rouge, LA, V.Boschi for the HAM-SAS team Ben Abbott, Valerio Boschi, Dennis Coyne, Michael Forte, Jay Heefner, Yu-mei Huang,
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
Type-A SAS Local Control Simulation (Current Status)
First Lessons from the Advanced LIGO Integration Testing
Outline ideas/status K.A. Strain
LCGT Seismic Attenuation System LCGT-SAS
BSC HEPI Pier Amplification
Control of the KAGRA Cryogenic Vibration Isolation System
External forces from heat links in cryogenic suspensions
Design of Stable Power-Recycling Cavities
Way to many People to List
Seismic Developments at LASTI LIGO-G Z
LIGO Detector Commissioning
Status of LIGO Installation and Commissioning
R&D Highlights Seismic Isolation Suspensions ISC/40m
LIGO Detector Commissioning
Simulating the Advanced LIGO Interferometer Using the Real Control Code Juan F. Castillo.
HAM-SAS Mechanics Status of modeling V.Boschi, V. Sannibale.
Presentation transcript:

HAM SAS Test Plan at LASTI David Ottaway November 2005 LSC Meeting March ‘05

Overview The LASTI Seismic Environment The Seismic Requirements Testing SAS Installation and fit check Seismic isolation performance DC Stability and check of control band noise enhancement Interaction Tests Discussion LSC Meeting March ‘05

HAM Seismic Requirements 1 Based on LIGO-E990303-03-D – HAM Req. may relax Vacuum Compatibility Seismic Payload Optical Platform Interface Requirements Operational mode and start-up Isolation performance LSC Meeting March ‘05

HAM Requirements (2) -Actuation Course positioning: +/- 1mm – small accelerations Tidal correction: +/- 90 um – time constant of 10 minutes Microseism correction: +/- 10 um – time constant of 0.1 s Internal resonances: All un-damped resonances must be greater than 100 Hz Field emission: Must not compromise SUS performance Drift and thermal expansion: Shall not exceed 0.1 mm in translation and 100 urad over 30 days Power and Signal Transmission: Route must be provided for signal and power transmission to the optical table. Must not compromise seismic performance LSC Meeting March ‘05

LASTI Seismic Environment Data taken at 1.30 am for LASTI 20th order log polynomial fit LSC Meeting March ‘05

Installation and Fit Check HAM SAS to be used installed in the Yend HAM of LASTI Yend HAM space is tight Will test cartridge style installation Installation fixturing will be tested Will be installed on scissor tables Ability to test vacuum compatibility looks unlikely because of significant water load in unbaked LASTI vacuum – Further calculations required though LSC Meeting March ‘05

Isolation Performance Predicted horizontal performance shown Have 6 in-vacuum geophones available for test 4 Low-frequency vacuum out of loop in vacuum geophones to be provided Will use on floor ST2 to obtain transfer function to validate performance Need to check that DC stability does not compromise this performance Base on TF by V. Sannibale LSC Meeting March ‘05

DC Position and Angular Stability Do not have any guaranteed DC stability references Best bet is to lock the system to DC position sensors and check in loop performance Check that the DC stabilization loops do not significantly compromise the stability in the LIGO control band Optical levers could be used to measure the long term angular stability LSC Meeting March ‘05

SAS Cross Coupling In Advanced LIGO it is looking more likely that the Modecleaner and the Power Recycling Cavity mirrors will be mounted on common tables Control of heavy optics ~ (45 Kg for RM) will create angular and displacement inter-connection between the PRC and the MC Will test this an the ease of installing test-masses on to HAM tables by installing two mode cleaner optics and confirming cross coupling – A RM mirror would be better This will also test the ease of installation of suspended optics on SAS. LSC Meeting March ‘05