Private – Public Collaboration in Water Management.

Slides:



Advertisements
Similar presentations
Philip ter Woort Director, Head of Office Egypt
Advertisements

Municipal Solid Waste Management at Amman City
Organised by Civil Service College, Dhaka Md. Abu Rashed Senior Consultant (PPP) Infrastructure Investment Facilitation Center 18 February 2012 PPP Frameworks.
INVESTMENTS IN POWER SECTOR
Jubail Industrial City A $45 Billion Super Project
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
China: Water Management and Accounting Project May 22-24, 2006 Hague.
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
International Telecommunication Union HIPSSA Project Support for Harmonization of the ICT Policies in Sub-Sahara Africa The assessment of international.
Introduction to PPP in the EU RCC PPP Conference, Sarajevo, 25 September 2009 Michael Burnett, Director, European PPP Forum, European Institute of Public.
Concession Agreement Tirana International Airport Nene Tereza
Energy Conservation Energy Management.
Arabtec Construction Co. Submetted to : Dr Dana Adas By: Moshref Abu Zubedh Mahmoud Abu Alshawareb English in workplace 2010/2011 Arabtec construction.
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
Watco Companies Overview January 25, 2013 Southwestern Rail Conference
Modern Methods of Solid Household Waste Management
Water Distribution Systems – Part 1
Water scarcity in the Arab world: how to get from crisis to sustainable? Rania el Masri, Ph.D. Environment and Energy Policy Specialist Cairo, May 8, 2012.
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
How Governments Have Made Broadband Network Rollout Possible CANTO Conference & Exhibition 22 nd – 25 th July, 2012 – Miami Andrew Gorton Group Head of.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
1 Overview and Outlook for PPP Projects in Vilnius Mrs. Ruta Vainiene Adviser to the Mayor of the City of Vilnius November 22 nd, 2006 Vilnius.
Investment Strategy for Northern Ireland: Introduction & Overview Patrick McMeekin | Adviser | SIB 13 th February 2013.
Symposium on Road to sustainable land administration in Africa 7 th annual African conference and Exhibition on Geospatial information, technology and.
The Way into New Markets Key Partner of Czech Exporters and Their Customers Abroad June 26, 2013.
Research Department 1 Global Economic Crisis and the Israeli Economy Herzliya conference Dr. Karnit Flug Research Director, Bank of Israel February 2009.
First Solar FuelSmart™: Powering Energy Security
Kuwait Fund for Arab Economic Development Regional Infrastructure Development in Africa.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
PUBLIC PRIVATE PARTNERSHIPS Taking a Balanced Look…. Development Equity Associates Inc. Nov. 14,
FY BUDGET REVIEW Mayor Dwight C. Jones Byron C. Marshall, CAO.
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
Policy Design and Implement in Developing Countries Le Thu Trang (MET11305)
International Models for Affordable Housing: Lessons from the United Kingdom The Euromoney Egypt Housing Finance Conference - 25 May 2009 Trowers & Hamlins.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
May 2005 The French Water Services: Main present challenges.
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
SAUDI ELECTRICITY COMPANY (SEC)
„Extension and modernization of water and wastewater infrastructure in Arad County”
Public Utility for water supply and sewage „Naissus“ Niš City of Niš, Serbia Local governments: helping each other?
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
Dalian Water Supply Project February 26, 2004 Alyona Dubrovina Jim Horiuchi Henning Hummervoll.
Financing Urban Public Infrastructure
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen September.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
Strategic Plan For Al Muahannd Construction Company 2008/2015.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
Sewage Infrastructure Development in Israel The water Authority The Sewerage Infrastructure Development Administration.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
Alandur Sewerage Project Background: Municipality in Chennai Metropolitan Area Population of around 165,000. Before 1996, town did not have underground.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
2016 Danube Water Conference. External governance: An example of private sector participation 1.Introduction 2.Overview of the utility 3.Keys to success.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Erdeneburen HPP Project Implementation Unit
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Energy and Water Regulatory Commission (EWRC)
Severn Trent is a leading operator of U.S. water & wastewater assets
EPC Contracts and Project Finance in Power & Water Projects The perspective of the sponsors … and lenders Sebastien BERNARD General Counsel, Middle East.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
The Oregon Approach to Innovation in Infrastructure
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

Private – Public Collaboration in Water Management

index 1.Ownership Model. Ostrava (Czech Republic) 2.BOT Model. New Cairo (Egypt) 3.Performance Based O&M. Al Ain Wastewater System (Abu Dhabi, UAE) 2

- Datos principals de la actividad técnica del CYII - Mercado nacional - Mercado internacional Ownership Model. Ostrava (Czech Republic) 1 3

4 1. Ownership Model. Ostrava (Czech Republic ) Severomoravské vodovody a kanalizace Ostrava a.s. (SmVaK), is one of the four biggest water companies of the Czech Republic. It owns and operates the entire water and wastewater system in its geographical area. Ostrava Region Ostrava Prague Ostrava

5 Main WTPs Reservoirs Transport Pipelines 1. Ownership Model. Ostrava (Czech Republic )

6 Population served:1,267,532 House Connections:120,764 Network pipeline length (km):4,820 WTP´s:49 Reservoirs:388 WWTP´s:68 Sewer length (km):1,565 Potable Network Efficiency (%): Ownership Model. Ostrava (Czech Republic )

CAGR = 5.61% Investment on infrastructure (million )

Average Potable Water Tariff In Czech ():1.30 Average Wastewater Tariff In Czech (): 1.13 SmVaK Potable Water Tariff ():1.21 SmVaK Wastewater Tariff ():1.07 SmVaK Water Tariffs are below the average values in Czech Republic 1. Ownership Model. Ostrava (Czech Republic )

Web Portal and Call Center 1. Ownership Model. Ostrava (Czech Republic )

From October 2006, SmVaK s Quality Assurance System is certified (ISO 9001, y OHSAS 18001) 1. Ownership Model. Ostrava (Czech Republic )

- Datos principals de la actividad técnica del CYII - Mercado nacional - Mercado internacional BOT Model. New Cairo (Egypt) 2 11

2. BOT Model. New Cairo (Egypt) aqualia - SPV company founded by OCI and aqualia on a 50%-50% basis - First PPP in Egypt - 250,000 m3/d waste water treatment plant - Reuse of treated Effluent and sludge is Orasqualias obligation - Investment of MEGP 786 (102 Million USD) - Awards : · Best PPP in Project Finance in the world year 2010 by Global Water Intelligence · Received from HM Queen Noor of Jordan the award of best PPP project of the year 2010 in Paris. · Best African PPP in Project Finance year 2010 by EUROMONEY

2. BOT Model. New Cairo (Egypt) Arab Republic of Egypt CAPW – Tech. Regulator Ministry of Housing – NUCA. New Cairo Ministry of Finance – PPP Unit PPP AGREEMENT aqualia infraestructuras OCI aqualia 5% 50% 45% DIRECT AGREEMENT NSGB CIB Arab Africa Ahli United Backer and McKenzie Lawyer FACILITY AGREEMENT Orasqualia for Operation O&M AGREEMENT Orasqualia for Construction EPC AGREEMENT Zulficar / Lawyers Enviro-Civec= Independent Technical Advisor Cairo Consult – Engineering Subcontractor OCI aqualia 50%

2. BOT Model. New Cairo (Egypt) Project Key Dates: - PPP Contract effectiveness : Initial Scheduled Plant Operational Date : Extended Scheduled Plant Operational Date (Due to the Revolution FM): First invoice for Capacity Charge (on a quarterly basis) : First Payment of Capacity Charge: before (as per Contract terms) - First Loan Installment (on a biannual basis): Start Commissioning: End of May 2012

- Datos principals de la actividad técnica del CYII - Mercado nacional - Mercado internacional Performance Based O&M. Al Ain Wastewater System (Abu Dhabi, UAE) 3 15

3. Performance Based O&M. Al Ain Wastewater System (Abu Dhabi, UAE)

Project Main figures ItemUnitsValue Area of sewerage districtkm211,106 Resident PopulationNo.470,255 Residential Customer ConnectionsNo.52,800 Commercial Customer ConnectionsNo.7,340 Industrial (Trade) Customer ConnectionsNo.816 Total Lenght of sewerKm2,301 Total Lenght of sewer >400mmKm262 Total lenght of sewerage pumping mainKm147 Total number of pumping stationsNo.77 Total capacity of pumping stationsl/s2,140 Total number of terminal pumping stationsNo.42 Total capacity of terminal pumping stationsl/s900 Average daily flow handled by NetworkMl/d137 Daily peak flow handled by NetworkMl/d155 Process electricity consumption Collection NetworksM Wh/yr5,492

3. Performance Based O&M. Al Ain Wastewater System (Abu Dhabi, UAE) Sewer flooding events TSE Quality TSE Delivery Asset availability Energy use Odour Complaints Health & Safety Performance measurement through KPI´s. Payment is modified according to performance through a pain-gain system

3. Performance Based O&M. Al Ain Wastewater System (Abu Dhabi, UAE) Example of KPI: Energy use

ConclusionsConclusions 1.There are many different PPP schemes, all of which are applicable in the Kingdom. 2.Key to the success of a PPP is the correct allocation of risks between public and private partners. 3.Capital investment can be included in the private side through ownership or capital return, or it can be supplied exclusively by the public side.

ConclusionsConclusions If capital is supplied by the private sector: -The public budget has more financial capability for other uses. -In the case of the Kingdom, the cost of finance will be slightly higher. -When a PPP model is implemented where there is a good balance between contractor-operator and investors, then the overall balance of pricing is very beneficial due to internal synergies. -The project must be bankable and correct international risk allocation is critical.

Private – Public Collaboration in Water Management