Fenestration Water Performance

Slides:



Advertisements
Similar presentations
Exterior Window and Door Frames
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Windows 18 Windows and Doors
The right choice: Windows and Door Frames Exterior Fixtures Hand Rails Electrical Boxes Hurricane Shutters Screen Enclosures.
Florida Product Approval System Validator Training December 11, 2012 Florida Product Approval System Validator Training December 11, 2012 Florida Building.
City of Palm Beach Gardens ARTISTIC BUS SHELTERS ARTISTIC BUS SHELTERS ITB PW ITB PW.
1 Introducing: the updated BCIS Product Approval Website the revised Product Approval Rule 9B-72 & S.B. 442 State of Florida Department of Community Affairs.
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
Lecture 22- Exterior Cladding Systems a.k.a skins ARCH 330 Materials & Methods Fall 2008.
From the 50’s to 5 Star Plus Burlington Free Press October 8, 1955.
Citizens Property Insurance Corporation Residential Wind Only Classification Plan November 11, 2002 Presented by: Tony Loughman Director of Underwriting.
VALUE ADVANTAGES OF FRP DOORS AND FRAMES. provides cost effective solutions for those applications where wood, hollow metal, aluminum or stainless steel.
ICC/NSSA Standards Preview Chapter 8 - Testing by Ernst W. Kiesling, P.E., Ph.D. Professor of Civil Engineering Texas Tech University and Executive Director.
P roduct Approval and the F lorida Building Code Building Codes and Standards Mo Madani, CBO, Technical Unit Manager Suzanne Davis, Product Approval Joe.
Chapter 8 Plot Plans.
Barrios Laura Bigott Dairet Vertical structure Solid Defines an area Delineates a building Types of walls: Load-bearing wall: supports.
Site Plans.
Drafting and Dimensioning the Architectural Floor Plan
Florida Product Approval System Validator Training February 1, 2010 Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Fire and Emergency Services Company Officer — Lesson 17 Fire and Emergency Services Company Officer, 4 th Edition Chapter 17 — Preincident Planning.
Water Management in Commercial Window Systems Ritz-Carlton Hotel St. Louis, MO.
Chapter 20 Doors and Windows. Chapter 20 Doors and Windows.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Wind Resistance for Equipment and Appliances 2007 FBC, Mechanical FBC, Fuel Gas FBC, Fuel Gas FBC, Residential FBC, Residential FBC, Building FBC, Building.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Cladding attachment.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
Residential Floor Plans
Floor Plan Sketch on 17” x 22” Graph Paper  Rough Scale Drawing  Room dimensions  Room Names  Basic House Characteristics AutoCAD floor plan including:
INSTALLATION DETAILS. Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
 CREATING A BUILDING PROJECT Create a building model using individual building elements. walls, windows, doors, floors, roofs, and so on. Create a building.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview.
Identifying Information: Building Exterior - 1 You observe damage to the frame on this exterior entry door. The door cannot be locked. LEVEL 3.
Window Installation: Pan Flashing and Air-Sealing to Prevent Water Intrusion Educational Overview Change title and presenter info to suit purpose. Revised.
Energy Codes and the Building Envelope
Understanding Architectural Blueprints
Do Now #7 What are the dimensions of the footing?
WALL Barrios Laura Bigott Dairet
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Impact of C&C loads due to ASCE/SEI 7-16
Automotive Engines Theory and Servicing
Polar King International, Inc
Structural Fire Engineering, October 2015, Dubrovnik, Croatia
Prepared by John R. Henry, P.E. Senior Staff Engineer
Wood Structures Topic 8 Quality Workmanship
Effective Building Enclosure Field Testing
Thank you to our Sponsors
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
Arch205 building construction wall systems
C.M. Scullion Associates Ltd
Energy Codes and the Building Envelope
Thermal Bypass Checklist Round-Table
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
House Construction Budget Plan
Industry Presentation on Water Penetration Testing
Wall and Ceiling Construction
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Wind, Water, Codes, Coverage
Evaluating and Improving a Manufacturing System Mock Preparation
Automotive Engines Theory and Servicing
Presentation transcript:

Fenestration Water Performance Presented by: Jaime D. Gascon Miami-Dade-County

Outline FBC Fenestration Perimeter Seal Requirements Water Testing Exceptions Window Walls Sliding Glass Doors Curtain Walls

FBC 6th Edition (2017) Building (HVHZ) 2411.3.1.6 The architect or professional engineer of record shall be required to detail on the drawings submitted for permit, rough opening dimensions, supporting framework, method of attachment and waterproofing procedures for all garage doors, passage doors, skylights, operative and inoperative windows in exterior walls. Said framework and method of attachment shall be designed and constructed so as to sufficiently resist the design wind pressures as outlined in Chapter 16 (High-Velocity Hurricane Zones). Exception: When detailed engineered shop drawings, along with the notices of product approval, produced by the manufacturer’s specialty engineer and approved by the architect or professional engineer of record, are admitted at the time of permit application, which completely identifies rough openings, supporting framework, method of attachment and waterproofing procedures are prepared and bear the signature and seal of a professional engineer.

Window Walls +80 psf and higher approvals (Miami-Dade and State) Good parts detail and required product seals Average - poor perimeter seal details

FL25883.1

Sliding Glass Doors Water performance testing does not specify how the test specimen is to be sealed to the wood test buck. TAS 202 requires loading the specimen to positive design load before performing the water test Water testing is performed at: 15% of positive design load 15 minute duration Spraying 5 gal/hr/sq.ft. (which is roughly 8” of rainfall per hr.) (MDC = 5 in/hr)

Sliding Glass Doors +80 psf and higher approvals (Miami-Dade and State) Good parts detail and required product seals Average - poor perimeter seal details

FL27113.1

FL23315.1

Curtain Walls +60 psf and higher approvals (Miami-Dade) Good parts detail and required product seals Good/average perimeter seal details

Final thoughts: Consider effectiveness of existing water testing exceptions for doors Better details in product approvals are required if these are the only details being relied on. Ample gap must be provided in areas requiring/allowing frame deflection in order to allow seal to elongate – not crack. Periodic maintenance check of all seals.