Durability Growth through HALT/HASS and Accelerated Testing

Slides:



Advertisements
Similar presentations
VFD Production Process & QA
Advertisements

PAGE 1 Product Quality & Reliability Drop, Tumble Seal & Accelerated Failure Mode (AFM) MC95 Andrew Biondo Director Quality Engineering.
Understanding of Long-Term Stability By Marek Lis Sr Application Engineer Texas Instruments -Tucson.
ELECTROMAGNETIC COMPATIBILITY Dr. Donald Church Senior Staff Engineer International Rectifier Automotive Systems November 17, 2005.
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Druck- und Temperaturmesstechnik Testing Procedure MH-2 Mobile Hydraulic Testing Procedure 1 Pressure Transmitter MH-2.
1 New build-up technique with copper bump AGP Process.
The Physics of Hybrid Vehicles. J. Russell Lemon
An innovative tool for the review of health and safety work practices and the implementation of effective controls of particulate exposures.
Analog Communications
Lighting concepts – Ballasts and Lighting Controls
Modelling and Simulation 7. September 2014 / Dr. –Ing Naveed Ramzan 1 Instrumentation and control Department of Chemical Engineering, U.E.T. Lahore Pakistan.
Line focus principle Heal effect Ratings Tube failure
An Electronic System Power Supply Example
TÜV SÜD Product Service GmbH 1 Highly Accelerated Life Tests and Highly Accelerated Stress Screens (HALT & HASS) Helping to reduce time to market and improve.
Refrigerators.
EFFECT OF DESIGN FACTORS ON THERMAL FATIGUE CRACKING OF DIE CASTING DIES John F. Wallace David Schwam Sebastian Birceanu Case Western Reserve University.
An Experimental Study and Fatigue Damage Model for Fretting Fatigue
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance Jim Pontius Donald Barnes.
Analysis of thermal failure of electronic components
Outline of Presentation Introduction to Analog Interfaces, Inc. Introduction to the Indenter Polymer Aging Monitor Principle of Indenter measurements How.
Characteristics of Instruments P M V Subbarao Professor Mechanical Engineering Department A Step Towards Design of Instruments….
AIR CONDITIONING (COOLING) UNIT 40 TYPICAL OPERATING CONDITIONS
SMJ 4812 Project Mgmt and Maintenance Eng.
Enhancing Reliability through HALT.  Introduction to HALT  Benefits of HALT  The HALT process.
Reliability Extending the Quality Concept. Kim Pries ASQ  CQA  CQE  CSSBB  CRE APICS  CPIM Director of Product Integrity & Reliability for Stoneridge.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
Reliability Laboratory Presentation on Setting up Reliability Laboratory Presented by Dr. G.H. Massiha Department of Industrial Technology University of.
Lecture 31 Electrical Instrumentation. Lecture 32 Electrical Instrumentation Electrical instrumentation is the process of acquiring data about one or.
Lecture161 Instrumentation Prof. Phillips March 14, 2003.
3-1 Introduction Experiment Random Random experiment.
ENVIRONMENTAL TESTING OVERVIEW QUALIFICATION TESTS MIL-STD-810 F PRODUCTION SCREENING HIGH ACCELERATED TESTS (HALT & HASS) ENVIRONMENTAL STRESSES SCREENING.
Classification of Instruments :
Product Design and Qualification (Validation) Testing for HPHT Systems
Shock and Vibration Testing
1 CTIS # Prepared By John Yurtin Updated Connection Systems Training Vibration & Fretting Corrosion Vibration.
Topic 1 different attributes that characterize sensors ETEC 6405.
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Pressure and Speed Limits
Slide # 1 Velocity sensor Specifications for electromagnetic velocity sensor Velocity sensors can utilize the same principles of displacement sensor, and.
TAPPINGMODE™ IMAGING APPLICATIONS AND TECHNOLOGY
T.M.F.T: Thermal Mechanical Fatigue Testing Wale Adewole Siyé Baker Heriberto Cortes Wesley Hawk Ashley McKnight.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Glenn Research Center at Lewis Field Random Vibration Testing of Hardware Tutorial 1 Fatigue Life Assessment William O. Hughes/7735 Mark E. McNelis/7735.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Chapter 8 Alternating Current Circuits. AC Circuit An AC circuit consists of a combination of circuit elements and an AC generator or source An AC circuit.
Electric Current Chapter 34.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
M.Nuzaihan DMT 243 – Chapter 5 Fundamental Design For Reliability What is Design for Reliability, Microsystems Failure & Failure Mechanisms, Fundamental.
Gonzales, Jamil M. Tengedan, Billy R.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Failure Modes and Effects Analysis (FMEA)
Failure Modes, Effects and Criticality Analysis
DESIGN OF A 9MHZ 15KW CW AMPLIFIER FOR RHIC Shane Dillon CTO.
1 TRANSDUCER. 2 Contents To understand the basic concept of Transducer To learn about Block diagram of transducer Different Applications of transducers.
© 2016 Minitab, Inc. Reliability for Your Company's Survival Bonnie Stone, Minitab October 19,
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Gayle K. Martin November 14, 2016
Martin Shaw – Reliability Solutions
Business Processes Organization and Roles
University of Alabama in Huntsville
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Value Proposition Value Engineering Through Design Optimization and source Substitution Effective SPC Deployment ESD Safe Storage and Handling Full Component/Board/System.
HALT: Notebook Computer Case Study
Unit I Module 3 - RCM Terminology and Concepts
FATIGUE FATIGUE Dr. Mohammed Abdulrazzaq
Durability testing for mechanical engine control units and accessories
DFMEA, Thermal Derating CAF, VIA Fatigue
Presentation transcript:

Durability Growth through HALT/HASS and Accelerated Testing Elite Electronic Engineering HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Topics Covered Review Your Requirements Overview of Accelerated Stress Testing HALT HALT Equipment, Test Methods, Expectations HASS Other Accelerated Tests Summary Q&A HALT/HASS and Accelerated Testing

Test Requirements & Goals Is Testing Desired by Manufacturer to Reduce Cost of Development, Manufacturing, and Warranty Obligations? Mandated by Manufacturer’s Client? What are your expectations and goals for this testing? HALT/HASS and Accelerated Testing

New Product Development Testing Screens HALT, HAST, ESD, Power Cycle, EMI RTCA DO-160 MIL-810, SAE J1455 Temp, Vibration, Shock, Waterproofness, Altitude, Humidity New Product Failure Modes HASS Analysis Phase Development Phase Qualification Testing Qual Retest Qualitative Testing Manufacturing Screen Quantitative Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Quantitative Testing Success Run Testing Test to Failure- Weibull Reliability Block Diagrams .98 .98 .95 .80 =0.73 .65 HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Which Tests To Run Input from all departments Determine failure modes (FMEA) Consider complete life cycle of product Suggest stresses that will precipitate failures Maximum Stress vs Time Dependent Develop test plan Execute test HALT/HASS and Accelerated Testing

Time Dependent Failure Mechanisms Accelerating Factors Failure Mode Failure Mechanism Loss of signal Silicon Diffusion Temperature Power Failure Dielectric Breakdown Electric Field Electromigration Temperature & Power Cycling Intermittent Output Corrosion & Oxidation of Fractures Humidity, Voltage, Temperature Dendrite Growth Humidity, Temperature Water Intrusion Seal Leaks Pressure Cracked Solder Joint Fatigue Thermal cycling & vibration HALT/HASS and Accelerated Testing

HALT Testing (Qualitative) Highly Accelerated Life Testing (HALT) Temperature and Thermal Shock (60C/min) Vibration 6 axis simultaneous (6 DOF) Very high stress levels to achieve time compression & quickly find the weakest links. Additional stresses likely to precipitate flaws can be used as a part of the HALT/HASS program. power cycling, voltage /electrical stress HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Design Optimization Provide data to designers for risk assessment Weak links- opportunity to improve the product before the design is “locked in”. Build in lifetimes of use in its field environment, “very large margins”. Proactive technique focusing on the mode and mechanism of failure, not on the specifications or the level of stress. No pass/fail criteria HALT specification. Some HALT specifications describe a “common method” Product Comparisons Side-by-side evaluation of various products and product revisions under similar extreme stress HASS Endpoints Large margins enables the use of high levels of stress in the HASS screen. Leave several if not many lifetimes of use remaining in the product. Enables the use of HASS to quickly detect any slippage that might occur in the manufacturing process. HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Halt Chamber Workspace 42”x42”x40” Heating & Cooling -100C to +200C >60C/min depending on product loading and temperature range HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Heating Elements Nichrome Coils FLA 135A Min Service 175A 460VAC 3ph Airflow 4,000CFM HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing LN2 Cooling 4.5GPM 30 PSIG HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing RS Vibration Table Multi-axis repetitive shock 3 linear, 3 rotational Axes 2Hz-10,000Hz Up to 60GRMS (depending on loading) Table Size 30” x 30” Payload up to 400lbs (reduced vibration amplitude) Compressed Air 90PSIG, 48CFM HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing RS Impactors HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Components on PWB Ckt board resonant frequencies Chip capacitors and die bond wires HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing RS vs. ED HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing RS vs. ED ED (Electrodynamic Vibration) Controllable Vibration Spectra 5Hz-2000Hz Single Axis 2” Displacement RS Random Only 6 Axis 30Hz-10,000Hz 10x -15x higher peak accel vs. ED HALT/HASS and Accelerated Testing

Steps Involved with HALT STEP 1: Pre-HALT Planning Discuss product with multi-functional team Develop test plan Bench test to confirm operation before starting HALT HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 2: Preparing for the HALT Setup Design appropriate vibration fixture Tune chamber proportional & integral parameters Configure air flow for maximum product temperature change rate Apply thermocouples and accelerometers to device under test Setup functional test equipment HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 3: Thermal Step Stressing Cold Begin at ambient Step down in 5°C or 10°C increments Use caution as fundamental limit is approached Approximate dwell time of 10 minutes at each temperature Allow sufficient time to run functional tests Find and fix failures Verify operation of thermal safeties Disable safeties to determine actual operating & destruct limits Continue until fundamental limit of technology is reached Practice continuous failure monitoring HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 4: Thermal Step Stressing Hot Begin at ambient Step up in 5°C or 10°C increments Use caution as fundamental limit is approached Approximate dwell time of 10 minutes at each temperature Allow sufficient time to run functional tests Find and fix failures Verify operation of thermal safeties Disable safeties to determine actual operating & destruct limits Continue until fundamental limit of technology is reached Practice continuous failure monitoring HALT/HASS and Accelerated Testing

Limits Encountered in HALT Data from Gregg Hobbs of Hobbs Engineering Lower Destruct Limit Destruct Margin Lower Operating Limit Margin Upper Operating Limit Margin Upper Destruct Limit Destruct Margin Product Specs Stress HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 5: Rapid Thermal Cycling Transition temperature at maximum product temperature change rates Select temperatures 5°C inside upper and lower operational limits Reduce change rate by 10°C/min if product cannot withstand maximum rate Continue thermal cycling until operating limit (°C/min) is found Continue cycling for a minimum of 10 minutes Apply functional testing and continuous failure monitoring Depending on the product or application, this step is sometimes omitted HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 6: Vibration Step Stress Understand how product responds to vibration input Vibration is stepped-up in increments, normally 3-5 Grms on the product Dwell time of 10 minutes at each level is typically sufficient Start dwell once product reaches vibration set point Continue until operational or destruct limit is found Apply additional product stresses during process HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 7: Combined Environments Develop thermal profile Use established thermal operating limits, dwell times and change rates Incorporate functional tests and continuous failure monitoring Begin with constant vibration level of approximately 3-5 Grms Step up in 3-5 Grms increments upon completion of each thermal cycle Use tickle vibration when higher Grms levels are reached Add 3-5 Grms tickle to determine if failures were precipitated at high G level but only detectable at lower G level HALT/HASS and Accelerated Testing

Suggested HALT Process Per GMW 8287 HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Other Stresses The Product Determines the Stress Power Cycling Output Loading Voltage/Electrical Stresses Humidity (HAST) Pressure Altitude Corrosion HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Process STEP 8: Lessons Learned Determine root cause of all failures that occurred Meet with design engineers to discuss HALT results Management cost justification & risk assessment Determine and implement corrective action Perform Verification HALT Insure problems are fixed and new problems were not introduced Periodically evaluate product as it is subjected to engineering changes HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Other considerations Quantity of Samples Product Improvement Preparation for HASS/HASA Comparison Testing Fixturing Stimulation vs. Simulation Product and Fixture Weight Test Uniformity Lower Operating Limit Margin HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing   Response Level Test Location Control Level Grms- X Grms-Y Grms-Z Mean 1 5 21.2 19.2 13.4 17.9 25 79.8 73.0 55.0 69.3 MAX (55) 158.1 138.3 112.6 136.3 2 14.2 14.6 9.8 12.9 73.3 68.4 50.3 64.0 150.1 134.2 105.6 130.0 3 10.5 13.8 8.1 10.8 42.6 55.6 37.3 45.2 85.5 113.6 80.7 93.3 4 16.6 17.4 10.1 14.7 68.1 67.5 44.5 60.0 145.3 140.3 99.7 128.4 19.1 18.4 11.3 16.3 77.1 69.5 50.0 65.5 157.4 140.5 110.5 136.1 20.5 12.1 16.8 75.1 72.3 51.9 66.4 140.7 112.8 137.2 HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Failure Analysis Services HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing Failure Analysis Services “SEM photographs showing and overall view (top, ~40x) and a typical closer view (bottom, ~800x) showing some surface debris but no damage to the integrated circuit from sample D4.” HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HALT Testing HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Other Uses of HALT Component Selection Did vendor perform HALT AND HASS? Use to verify products operating limits. Use to select most robust product. Vendor Selection If subcontracting, vendor needs to meet your standards (Halt and Hass equipment, should be the same.) HALT/HASS and Accelerated Testing

HASS- Highly Accelerated Stress Screening HASS is used as a production quality screen quickly identify any weaknesses that might enter the product due to changes or malfunctions in the manufacturing process. Each weakness detected, represents an opportunity to take corrective action prior to shipping large quantities of flawed product. The screen is “tuned” so that it detects weak product while still leaving several, if not many lifetimes of field use in the shipped product. HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HASS Testing HASS- 100% Production Screening HASA- 1-10% Production Auditing Safety of of HASS Repeat screen a minimum of 20 times Assuming remove less than 5% life Failures after less than 10 times, too harsh Re-HALT- Confirm margins HALT/HASS and Accelerated Testing

Other Accelerated Stress Testing Acceleration Factors Temperature Arrhenius Model Humidity Arrhenius-Peck Model Vibration Miner Criteria Voltage Inverse Power Law Product Life Cycling CALT Testing Test to Failure & Apply Weibull Analysis HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Product Life Cycling Calibrated Accelerated Life Testing (CALT) Suggest primary fatigue mechanism Simulate loads at three stress levels 90% of foolish load (first test) 80% of first test load Third stress level Depends on first two and ultimate life Test all units to failure Plot S-N curve, Determine AF’s Generate Weibull Plot HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Product Life Cycling Accelerated Life Testing “Accelerated Testing: Statistical Models, Test Plans, and Data Analysis” By Wayne Nelson CALT GMW 8758 Example Automatic Lubricating System HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing CALT Test Example Simulate loads at three stress levels Monitor test counting cycles to failure HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing CALT Test Example Collect Failure Data Plot and determine Inverse Power Relationship AF = (Saccel/Snormal)b HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing CALT Test Example Sort and apply median ranks Generate Weibull Plot HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing CALT Test Example Weibull Plot Obtain distribution parameters Reliability metrics B1, B10 Reliability vs life Reliability Block Diagrams HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HAST Testing Accelerated Humidity Testing HAST (Highly Accelerated Stress Testing) JESD22-A110 B Compress 1000 Hour 85/85 Humidity to 96 Hours High Temperatures may stimulate uncorrelated failures Arrhenius-Peck Accelerated Model for Temperature Humidity HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing HAST Testing “…Photographs showing environmental damage to the solder joints of A8.” HALT/HASS and Accelerated Testing

Instrumentation & Data Acquisition Yokagawa DL708 Scope Ten Systems In-House 4, 8, and 16 Channel LeCroy Digital Storage Scopes 1.5GHz Bandwidth, 8GS/s, 16M data points Seven Systems In-House 400MHz, 500Mhz scopes Agilent 34970A Data Acquisition System 120 Single Ended or 60 Differential Input AC/DC, Volts, Amps, Frequency, Ohms HALT/HASS and Accelerated Testing

Advanced Material Center Materials Testing and Failure Analysis Physical Testing Thermal Testing Chemical Testing Light & Appearance Exposure Testing Product Comparisons Location: Ottawa, Illinois www.amc-testlabs.com HALT/HASS and Accelerated Testing

Advanced Material Center Physical Testing Tensile Tear Dart Flextural Friction Surface Tension Specific Gravity Density COF HALT/HASS and Accelerated Testing

Advanced Material Center Thermal Analysis Differential Scanning Calorimeter (DSC) Melt range Purity Thermal Mechanical Analyzer (TMA) Expansion/Contraction Thermal Gravimetric Analyzer (TGA) Thermal degradation Ash HALT/HASS and Accelerated Testing

Materials Engineering Incorporated Complete Metallurgical Laboratory Failure Analysis Analysis of Processing Problems Contamination Identification Engineering Support/Consulting Laboratory Testing Specialized Testing Litigation Support and Expert Testimony Location: Virgil, Illinois www.materials-engr.com HALT/HASS and Accelerated Testing

Materials Engineering Incorporated Complete Metallurgical Laboratory Scanning Electron Microscope (SEM) with EDS OES Chemical Composition Metallography and Microscopy Microhardness and Hardness Electrical Conductivity Density/Specific Gravity Surface Roughness (Ra) Pressure and Torque Testing Specialized Product and Component Testing ISO 17025 Accredited by A2LA HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Other Tests to Failure HALT/HASS and Accelerated Testing

HALT/HASS and Accelerated Testing Other Tests to Failure HALT/HASS and Accelerated Testing

Durability Growth to HALT HASS Any Questions? Thank You! HALT/HASS and Accelerated Testing