Alternative Test Method and Monitoring Approval Robin Segall Measurement Technology Workshop December 6 – 8, 2010.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

Municipal Solid Waste Landfill NSPS/EG Requirements Illinois EPA Bureau of Air Mike Davidson 217/
The Wonderful World of HAP Regulations
MSW NESHAP Control Requirements Contains the same requirements as NSPS/EG. Requires gas collection and control system (GCCS) for same landfill as NSPS/EG.
National Emission Standards for Hazardous Air Pollutants: Municipal Solid Waste Landfills.
METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL FURNITURE SURFACE COATING MACT CLOSING 40 CFR PART 63 SUBPART RRRR July 2006.
Compliance Dates The final rule was published on January 25, 1995,
METAL COIL SURFACE COATING MACT CLOSING METAL COIL SURFACE COATING MACT CLOSING 40 CFR PART 63 SUBPART SSSS May CFR PART 63 SUBPART SSSS May 2006.
METAL FURNITURE SURFACE COATING MACT QUESTION & ANSWERS 40 CFR PART 63, SUBPART RRRR July 2006.
IRON & STEEL FOUNDRY MACT QUESTION & ANSWERS
IRON & STEEL FOUNDRY MACT CLOSING IRON & STEEL FOUNDRY MACT CLOSING 40 CFR PART 63 SUBPART EEEEE.
Review of NC Toxic Air Pollutant Rules (pursuant to Session Law ) North Carolina Division of Air Quality Stakeholder Meeting September 25, 2012.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
MACT Vacaturs & Section 112(j) Plywood MACT Vacatur Boiler MACT Vacatur & Section 112(j) rule Section 112(j) applicability Section 112(j) requirements.
Healthcare and Air Quality H2E Conference - Dec 6, 2007 K-State Pollution Prevention Institute Ryan Hamel.
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
1 The Credible Evidence Rule and Compliance Certifications Peter Westlin OAQPS, EMAD.
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Harmonization of Parts 60 and 75
TOPICS CONTACTING THE DEPARTMENT OF HEALTH FEDERAL GRANT FUNDING PERIODS CONTRACT TERMS AND CONDITIONS STATEMENT OF WORK MONITORING.
KEEA Conference October 2013 Carbon Pollution Standards for Power Plants under Section 111 of the CAA: How Energy Efficiency Can Help States Comply 1 Jackson.
Preparing for Compliance Monitoring Reviews Understanding CMS Protocols Used by Review Organizations January 14, 2009 Presented by: Margaret deHesse, RN,
Florida Pilot Initiative for the Performance Approach to Measurement Systems Stephen Arms Florida Department of Health.
Transportation Conformity and Development of Emission Budgets.
New Federal Regulations for Internal Combustion Engines Doug Parce.
EPA Rulemakings to Set GHG Emission Standards for Power Plants National Hydropower Association Webinar Kyle Danish February 14, 2014.
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
EMS Auditing Definitions
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Canada vs. USA Environmental Regulation (Why Canadians are better known for hockey) Georgia Basin-Puget Sound International Airshed Strategy Meeting September.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
1 OAQPS Guidance on -- “Consulting with Indian Tribal Governments” November 28, 2007.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
1 GRIC Tribal Implementation Plan Development Dan Blair, Air Program Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
Communication 2 Report Writing.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
ACADEMIC PERFORMANCE AUDIT ON AREA 1, 2 AND 3 Prepared By: Nor Aizar Abu Bakar Quality Academic Assurance Department.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
Nez Perce Tribe Experience with Enforcement and Tribal Credentials Mary Fauci Nez Perce Tribe.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
Federal Statute, Federal Regulations, State Policies, and State Procedures What’s the Difference? Mississippi Department of Education Office.
CAA Program Reporting Clarification Regarding Federally-Reportable Violations for Clean Air Act Stationary Sources (March 2010) (FRV Clarification Memo)
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
F&A Rates 101 Basics of F&A rates for Proposals, Grants, & Contracts Dr. Mindy S. Connolly, CPCM Sr. Sponsored Research Officer Office of Sponsored Projects.
Developing a Tribal Implementation Plan
Technical Manuals 1002 & 1003 Updates
National Ambient Air Quality Standards (NAAQS)
New Source Review (NSR) Program Basics
Preparing for Permit Review
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Draft Modeling Protocol for PM2.5
Clean Air Act (CAA) Purpose
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Tribal Authority Rule (TAR) Overview
EPA/OAQPS Pollutant Emissions Measurement Update 2019
Presentation transcript:

Alternative Test Method and Monitoring Approval Robin Segall Measurement Technology Workshop December 6 – 8, 2010

Background Federal emissions standards typically specify performance test methods and monitoring Specific source, or other stakeholder group, may need or want to use alternative to required test method or monitoring

Discussion Topics Federal regulations and policies governing: Authority for approval of alternatives Delegation of that authority Approval process Alternative test methods Alternative monitoring Criteria for approval Alternative test methods Alternative monitoring Relevant Resources

Relevant Regulations Part 60 – NSPS Part 61 – NESHAP Part 63 – NESHAP for source categories of MACT

Relevant Regulations, cont. Administrators authority to approve alternatives to test methods and monitoring requirements is codified in General Provisions to Parts 60, 61, & 63 Test Methods - §§60.8(b), 61.18(h), 63.7(f) Monitoring - §§60.13(l), 61.14(g), 63.8(f)

Test Method vs. Monitoring Section 63.2 defines test method as a validated procedure for sampling, preparing, and analyzing for an air pollutant specified in a relevant standard as the performance test procedure. In actuality, the test procedure used to determine compliance could be a test method or a monitoring procedure E.g., Subpart Da SO 2 and NO x CEMS performance specifications and QA procedures

Delegation of Approval Authority for Alternative Test Methods & Monitoring EPA Internal Delegations Manual – Delegations and EPA External (States & Locals) 40 CFR 63, Subpart E EPA 305/B – How to Review and Issue CAA Applicability Determinations and Alternative Monitoring Explains that Parts 60 and 61 may follow Part 63 guidance

Categorization of Alternatives or Changes Definitions in Subpart E, §63.90(a) Minor, intermediate, major change to test method Minor, intermediate, major change to monitoring Affect level of delegation of approval authority Major Minor Major Minor Intermediate

Definition: Minor Change to Test Method Site-specific No national significance No effect on stringency of standard Made to accommodate site-specific constraints

Definition: Intermediate Change to Test Method Modification involves proven technology Site-specific, but could have national significance Potential to decrease stringency of standard, but demonstrated that will not

Definition: Major Change to Test Method Modification is an entirely new method and/or involves unproven technology May be site-specific, but will usually set a national precedent Broadly applicable

EPA Internal Delegations Test MethodsMonitoring Major Changes OAQPSRegions Intermediate Changes OAQPS (Regions) Regions Minor Changes Regions

Delegation to States/Locals Policy codified in 40 CFR 63, Subpart E Regions may delegate to S/L approval authority for: Minor changes to test methods and monitoring - typically done Intermediate changes to test methods and monitoring, where appropriate

Approval Process for Major or Intermediate Changes to Test Methods Determine delegated authority Written request to delegated authority Include supporting information Appropriate cc:s Acknowledge request Review of request Request additional info, if needed Issue official letter of approval/disapproval

Approval Process for Minor Changes to Test Methods Determine delegated authority State/Local or Region Request to delegated authority via site- specific test plan, letter, or verbally (during a test) Consideration of request Approval/disapproval via test plan approval or official letter, or test report if change approved during test program)

Approval Process for Major or Intermediate Changes to Monitoring Detrmine delegated authority Typically Region Written request to delegated authority Include supporting information/justification Appropriate cc:s Review of request Request additional info, if needed Issue official letter of approval/disapproval

Approval Process for Minor Changes to Monitoring Determine delegated authority State/Local or Region Request to delegated authority via letter or site-specific performance evaluation plan Consideration of request Approval/disapproval via performance evaluation plan approval or official letter

Criteria for Approval of Alternative Test Methods Must produce results adequate for the Administrators determination of compliance From definition of alternative method in General Provisions to 40 CFR Parts 60, 61, and 63 That has been demonstrated to the Administrators satisfaction using Method 301 From definition of alternative test method in General Provisions to 40 CFR Part 63 Applies to intermediate and major changes

Criteria for Approval of Alternative Monitoring Like an alternative method, alternative monitoring must allow the Administrator to make adequate determination of compliance Examples of approvable alternative monitoring are included in §§60.13(l), 61.14(g), and 63.8(f) New approvals should be consistent with prior approvals Applicability Determination index Consultation with other Regions and OECA

Resources on Alternative Test Methods Broad approvals on EMC website at Federal Register Notices also at Details on regulations (1/30/2007) Yearly compilation of broad approvals Guideline on making requests at CFR 63, Subpart E

Resources on Alternative Monitoring Detailed guidance document: How to Review and Issue Clean Air Act Applicability Determinations and Alternative Monitoring (EPA 305-B ) Approved monitoring alternatives in Applicability Determination Index (ADI) on EPA/OECA website at CFR 63, Subpart E

Questions?