Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017.

Slides:



Advertisements
Similar presentations
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg Short Bunches at FLASH.
Advertisements

Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Beam stability (direction/flux) 2.Absolute  beam flux.
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
Progress on the final TWIST measurement of James Bueno, University of British Columbia and TRIUMF on behalf of the Triumf Weak Interaction Symmetry Test.
Beam profile vs time Analyzed Vx vs Vy distributions vs time for –Run 72 (13:26:02 – 28:25) –Run 73 (13:36:10 – 13:37:30) –Run 74 (43:12 – 44:21) Binned.
PQB Photocathode Analyzing Power Study May 19, 2009.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Wire scanner controls at SLAC. Subgroup for one emittance measurement station Wire to select Scan range Park position Selection x,y,u Single scan Start.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
5 MeV Mott Polarimeter Progress Riad Suleiman April 10, 2012.
May 17, 2006Sebastian Baunack, PAVI06 The Parity Violation A4 Experiment at forward and backward angles Strange Form Factors The Mainz A4 Experiment Result.
UC Davis June st Rosi Reed Low Energy Test Run Results Rosi Reed University of California at Davis.
Energy Scan of Hadron (  0 ) Suppression and Flow in Au+Au Collisions at PHENIX Norbert Novitzky for PHENIX collaboration University of Jyväskylä, Finland.
Parity Quality Beam (PQB) Study Injector Group September 2008.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Hycal Energy Resolution, Timing, &Trigger Efficiency, A cumulative study. Chris Mauney.
Update on the Fermi bubbles analysis. V.Kulikovskiy 1.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
HBD Transmission Monitor Update III: Noise Analysis B. Azmoun & S. Stoll BNL HBD Working Group Meeting 10/10/06.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
RHIC pC polarimeter what has been achieved and what needs to be done Osamu Jinnouchi RBRC 2/10/05 RSC meeting.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
ArgonneResult_ ppt1 Comparison of data and simulation of Argonne Beam Test July 10, 2004 Tsunefumi Mizuno
Equalization of Medipix2 imaging detector energy thresholds using measurement of polychromatic X-ray beam attenuation Josef Uher a,b, Jan Jakubek c a CSIRO.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
Kevin Lynch MuLan Collaboration Boston University CIPANP 2006 A new precision determination of the muon lifetime Berkeley, Boston, Illinois, ITU, James.
Monitoring Energy Gains Using the Double and Single Arm Compton Processes Yelena Prok PrimEx Collaboration Meeting March 18, 2006.
Rainer Stamen, Norman Gee
HERD Prototype Beam Test
Mott Polarimeter at CEBAF
Some Result of HyCal Resolution
D. J. Margaziotis HAPPEX Collaboration Meeting
The h double helicity asymmetry and cross section
Tilecal Pion Response and Energy Resolution
HFRadMon. Status and Performance.
DCH calibrations 2013 Gordon Lim, UCI.
Open Tasks for PrimEx-II Run
Recent Results on Proton Helicity Structure Studies from PHENIX
Results of HyCal Analyses
G0 PC Installation and Beam Studies
Beam Instrumentation Meeting – Dan Peterson
EM Linearity using calibration constants from Geant4
G0 Beam Polarization T. Horn, D. Gaskell Jefferson Lab
Time resolution in TileCal
e+ Vertical Beam Size during CESR-c Collisions
Scaling Properties of Identified Hadron Transverse Momentum Spectra
Current status Minjung Kim.
e+ Vertical Beam Size during CESR-c Collisions
fK+K- yield analysis update
Slope measurements from test-beam irradiations
Run5 Analysis of RHIC-pC Polarimeter
G0 PC Installation and Beam Studies
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
ATLAS full run-2 luminosity combination
Status of the cross section analysis in e! e
Presentation transcript:

Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017

Official Run II

Rate Systematic Studies Run II: Relative rate scan of all foils at constant beam current of 1 µA with Pockels Cell OFF: 8413 – 8424 Relative rate scan of all foils at constant beam current of 1 µA and no timing veto: 8548 – 8560

With official asymmetries PC Off Rates With official asymmetries

With official asymmetries No Timing Veto Rates With official asymmetries

Summary Relative rates depend on range of Gaussian fit of energy spectra (i.e., 7500-11000 or 8000-9000) since each fit-range gives different mean and sigma RUN II rate scan with Pockels Cell Off – taken at start of RUN II with initial beam steering – is very consistent with rates from asymmetry runs and with correction applied Run II rate scan with no timing veto – taken at end of RUN II – is very consistent with rates from asymmetry runs and with correction applied

DAQ Dead Time Study

Energy vs Time-of-flight

8545

8539

8495

8551

8552

8560