Central Region Working Group

Slides:



Advertisements
Similar presentations
Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Advertisements

Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
ALCW15 Mike Harrison AD&I and Change Request status.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Status of ILC Global Timing Ewan Paterson For Global Timing Working Group Masao Kuriki, David Rubin, Benno List, Ewan Paterson, Kaoru Yokoya LCWS 2014.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
ADIJ Report ( , KY) Before studying the possible tunnel layout for the conventional source, the tunnel for the undulator source must be discussed.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Date Event Global Design Effort 1 ALCPG Briefing on ILC Cost Reduction Studies Ewan Paterson Personal Views GDE May 15, 08.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
CR1: Insert Dogleg K. Yokoya CMB mtg /9/25 CMB Yokoya1.
Summary of Day1 of the Mini-WS and Santander Plan K. Yokoya CRWG 9, KEK 2016/4/19 MiniWS summary1.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
K. Yokoya CRWG, ECFALC2016, KEK
Central Region Group Status and Positron Region
CRWG Overview K. Yokoya LCWS16 Morioka.
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
ILC2016x 12/08/2016 LCWS2016 (Morioka, Japan).
ILC-CR-0004 Main Linac extension: Implementation status
Introduction and Meeting Objectives
ILC Accelerator Update
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Auxiliary Positron Source
LCWS2015 : Beam Dynamics / M. Woodley
Summary of CRWG+CFS+Positron Mini-WS
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
AD & I : BDS Lattice Design Changes
Cost Comparison of Undulator and e-Driven Systems
Electron Polarization In MEIC
Beam Delivery System Schedule at ILC2010
Kaoru Yokoya CRWG Meeting, Feb.2, 2016
Electron Source Configuration
Linear Collider Positron Source Update
Extract from today’s talk given to DCB
Linear Collider Positron Source and Central Integration Update
Overview of Day One – 29 Feb 2016
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions and the Impact on Operations Ewan Paterson LCWS15 Meeting NOV 3, /24/2019.
ATF project meeting, Feb KEK, Junji Urakawa Contents :
ILC - Global Design Effort
Presentation transcript:

Central Region Working Group K. Yokoya 2015-1215 CRWG meeting ADI, 2015-1210, Yokoya

Charge (1) To develop a conceptual design for the central region of the ILC at a level of detail consistent with a change request and sufficient to define the CFS features of this area of the machine. The central region = downstream of the two main linacs: e- source, Undulator driven e+ source, DR transfer lines (but not DR), RTML, BDS including associated hardware (dumps, collimators, spoilers etc..) IR ADI, 2015-1210, Yokoya

Charge (2) Should assume Positron source Detector Hall layout as specified in CR-003. Tunnel geometry as specified in CR-004 (2x1.5km extension) and lattice ILC2015b. ML tunnel cross-section as outlined for a 1.5 m central shielding wall (CR12 --- note the number changed 1312). Positron source Should be based on the undulator driven, positron source as modified by CR-011. To be understood as the relocation of the 5GeV booster upstream Should not incorporate any active features of a conventional positron source (e.g. klystron galleries, additional shielding, etc..) at this time. Should however satisfy yourselves that the CFS layout you propose is consistent with the possibility of the subsequent adoption of such a source should that prove advantageous at some point in the future. ADI, 2015-1210, Yokoya

Charge (3) Some of the information you will likely need is not completely specified at this time. Hopefully it will be available soon. The Working Group will thus need to exercise a degree of judgment in how it approaches this task. Avoid the temptation of trying to produce an engineering level of detail. We are not scoped for such a task at this time It is important to develop the central region concept in a timely way since changes have been made since the TDR and we need to progress towards a Kitakami site specific CFS footprint. The Working Group should attempt to derive a cost- neutral (or cost reducing) approach though I appreciate that the TDR baseline was estimated in a somewhat generic fashion for this part of the machine thus cost comparisons might prove difficult. ADI, 2015-1210, Yokoya

Charge (4) You should plan towards having a working concept for the ECFA workshop in Santander, in June 2016 (May 30 – Jun 5). ADI, 2015-1210, Yokoya

Members BDS: Glen White, Toshiyuki Okugi, Sources: Masao Kuriki, CFS: Masanobu Miyahara, Tomoyuki Sanuki, General: Benno List, Ewan Paterson, Kaoru Yokoya Meetings Normally Tuesday, standard time (6pm California, 3pm EU, 11pm Japan) Right after CFS (1hr earlier) …… what to do in DST? Same time as TB First meeting on Dec.15 Every other week Archives? ADI, 2015-1210, Yokoya

What must be considered? (1) Positron line Relocation of booster linac  decided already Positron spin rotator 2 parallel line for up and down polarization (strong request from physics and positron groups) Superconducting or normal-conducting solenoid? Lattice in the undulator region --> positron group Lattice in the booster  positron group Auxiliary positron source ADI, 2015-1210, Yokoya

What must be considered? (2) Positron line Global timing chicane (where?) Insert a chicane with orbit length > 46cm (+-23cm) in the transfer line of produced positron to the DR 3 possibilities At 400MeV At 5GeV in BDS tunnel  lattice 2015b will include this At 5GeV after the bend to DR Controllability Range of online control Fine feedback for IP?? 400MeV 5GeV DR ADI, 2015-1210, Yokoya

Okugi. LCWS2015 ADI, 2015-1210, Yokoya

What must be considered? (3) BDS line Muon wall Related to the transverse size of BDS tunnel Relation to the background To be studied by BDS group Beam diagnostics section  Okugi Collimator area Required shielding Amount of radiation  BDS Beam dump (emergency dump, tune-up dumps, main dumps) Abort kicker  BDS Flat-top length Dump hall design Who? By when? Emergency signal ADI, 2015-1210, Yokoya

Okugi. LCWS2015 ADI, 2015-1210, Yokoya

What must be considered? (4) Tunnel shape/size Shielding wall Local shielding in e+ target region, collimator region  estimation by positron group Laser hut But don’t go into detail of CFS ADI, 2015-1210, Yokoya

What must be considered? (5) Must take into account Installation path Where are the access halls?  CFS, cryogenics Commissioning scenario Human access when positron beam is on?? Ewan Safety issues Possible accidents Must work with close link to CFS, BDS, positron Else?? ADI, 2015-1210, Yokoya

Central Region Redundancy From Ewan’s slides at LCWS TDR Electron source 2 guns, 2 lasers Buncher: spare klystron 5GeV booster : 21 cryomodules + 3 spare, spare klystron Energy compressor: 2x5MW klystrons installed Positron Spare undulator? Spare target, flux concentrator, capture section Warm RF, booster linac, ECS ? ALL OF THE ABOVE NEED TO BE, UPDATED, AGREED UPON TO BE CONSISTENT WITH CFS LAYOUTS AND LATTICE, AND ARE INDEPENDENT OF THE DISCUSSION OF A THINNER SHIELD WALL OR TUNNEL CROSS-SECTION . AUXILLIARY OR ALTERNATIVE E+ SOURCE DESIGNS WILL HAVE A LARGE LOCAL (over 1 or 2 km) IMPACT ON THE LATTER. ADI, 2015-1210, Yokoya

Next meeting 2016 Jan. 5 23:00 Japan, 15:00 Europe, 6:00 west coast ADI, 2015-1210, Yokoya