Mod 621A Supporting analysis

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Tariff Code Update 23 rd June EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Mod 0428 Charge Impact October Affected Supply Point Population.
Customer Charge On behalf of all DNs 19 November 2010.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Smart Grid Tariff Changes
Background Current balance of LDZ System and Customer charges
Accompanying Narrative
Storage users in entry/exit regimes suffer from double charges for transmission
EU Tariffs Code Update Based on Refined Draft as of 30th October
Harmonization of Cross Border Transmission Tariffs between
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Transmission Planning Code – Draft Document
Review Group 291- Ofgem Update
Background and Process
Transmission Workstream 4th July 2007
GRI NW TRANSPARENCY PROJECT
Mod 0621 Amendments to Gas Transmission Charging Regime
Mod 0621 Amendments to Gas Transmission Charging Regime
LDZ System Charges – Structure Methodology 26 July 2010
Transmission Pricing & Regional Electric Markets
Mod 0621 Amendments to Gas Transmission Charging Regime
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Danishtah Parker 0621 Workgroup 26 April 2018
PARCA Security and Termination Amounts
UNC 0621L: Amendments to Gas Transmission Charging Regime
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Proposer: Malcolm Montgomery Panel Date: 20/10/16
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Joint Office Presentation for Modification 0678
EU/GB Charging Project – Delivery Timescales
Mod 0621 Amendments to Gas Transmission Charging Regime
Long Term Non Firm Capacity Update
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Draft Mod: Update of default System Marginal Prices
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
Mark Freeman 29th January 2007
Entry Overrun Calculation
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Purchased Gas Cost Adjustment (PGA) 101
Purchased Gas Cost Adjustment (PGA) 101
Presentation transcript:

Mod 621A Supporting analysis Nick Wye Mod 621 Meeting 28 March 2018

Mod 621A - refresher Proposes an increase in the “storage discount” from 50% to 86% for both implementation phases Proposes non-application of capacity-based revenue top-up charge, in the enduring phase, on storage capacity bookings

Justification Numerous reasons why discount should be greater than 50% CWD model is simplistic based on the premise that revenue should be allocated on the basis of capacity and distance. It does not reflect costs (or benefits) incurred by the NTS It is based on average flows rather than peak/off-peak flows, so again difficult to marry with cost reflectivity, where system is built to meet peak flow/demand expectations It is based on average distances rather than actual distances between entry and exit points (see relative prices of exit points close to entry points with those with lower average distances between all entry points and individual exit points) The above can be remedied by shorthaul and/or diluting the overall distance impact, but storage cannot access shorthaul and is both an entry and exit point. Storage is embedded in the UK network and its operational relationship is symbiotic with the SO Gas which is delivered, stored and redelivered to the system has already paid transmission access charges at entry and exit points

WWA/GSOG paper – July 2017 Main points Storage is a parking service (confirmed by Ofgem in its GTCR conclusions). Ofgem argued that commodity charges (and we presume revenue top-up charges) should not be applied to storage as it has already contributed to historical costs. This could equally apply to all transmission charges as CWD is a methodology for recovering historical, current and future costs all of which are paid by gas entering and exiting (but not parked) in the system…….charges on storage result in double counting and overcharging. Storage can be compared to linepack. It is embedded and injects during “low” demand and delivers during “high” demand. As such, it provides balancing assistance to National Grid. If charges are to be more cost-reflective then given the system is built to meet peak demand levels then it could be argues that storage should be exempt from exit charges (as storage delivers on peak days).

Main points (cont) Storage provides transmission benefits of between £40m to £70m p.a. through investment savings Storage produces significant externalities (societal benefits) not realised by storage owners. These translate into security of supply benefits which can be allowed for in accordance with the EU TAR and Authority’s principal objective

Why 86%? An assessment based on a shorthaul type tariff with storage satisfying local demand to ensure improved cost-reflectivity in charging. See WWA paper 14 Dec 2017 https://www.gasgovernance.co.uk/0621/141217 Modelling looked at costs of injection and delivery to and from storage to an exit point, compared to costs of transporting gas directly to the same exit point The average increase in unit cost of transportation for all storage points was 36% In total, applying the min. 50% discount and the additional 36% discount to ensure fairer treatment for storage the total discount is 86%

Transitional Phase impacts Entry Storage discount Expected Revenue Recovery Entry Total Under-recovery CRRC IP Top Up 50% -£49m -£252m 0.0302 0.0231 86% -£78m -£253m Change 59% 0.4% 0% Exit Storage discount Expected Revenue Recovery Exit Total Under-recovery CRRC IP Top Up 50% -£26m -£175m 0.0204 0.0182 86% -£38m -£177m 0.0206 0.0183 46% 1.1% 0.98% 0.54% 0.0

Enduring 50% discount – entry prices

Enduring 86% discount - entry

Enduring 50% discount - exit

Enduring 86% discount - exit

Enduring firm entry price comparison

Enduring firm exit price comparison

Increasing the discount to 100% Repeated the modelling using same underlying assumptions with an increased storage discount Results show little impact, due to relatively low levels of storage bookings combined with significant levels of existing entry capacity acquired at these points

Transitional Phase impacts Storage discount Expected Revenue Recovery Entry Total Under-recovery CRRC IP Top Up 50% -£49m -£252m 0.0302 0.0231 100% -£89m -£253m Change 81% 0.4% 0% Storage discount Expected Revenue Recovery Exit Total Under-recovery CRRC IP Top Up 50% -£26m -£175m 0.0204 0.0182 100% -£43m -£181m 0.0211 0.0188 65% 3.4% 3.3% 0.0

Enduring firm entry price comparison

Enduring firm exit price comparison