1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- MHK Alex Fleming: PI Dehlsen.

Slides:



Advertisements
Similar presentations
Understanding Student Learning Objectives (S.L.O.s)
Advertisements

Requirements Engineering Processes – 2
Houston Marine Insurance Seminar September 17th, 2007
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
SHOW ME THE MONEY BUDGETING 101.
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Strategic Planning & New Activity Development September 2013.
NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
Learner-Centered Education Course Redesign Initiative Builds upon work of prior LCE grants Will award grants of $40,000 - $50,000, with the option.
Herbert Maguire, CPA, CGFM, MBA Commonwealth of Pennsylvania
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
Board of Early Education and Care Retreat June 30,
Marine Institute Memorial University of Newfoundland Liferaft Operational Performance James Boone – Offshore Safety and Survival Centre.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
11 June 2009 American Control ConferenceSt. Louis, MO Control of Wind Turbines: Past, Present and Future.
IBM Corporate Environmental Affairs and Product Safety
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Water-to-Wire (W2W) Project Dr. Edward C. Lovelace Free Flow Power
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
NIH RESEARCH CONTRACTS
DBE Uniform Reporting: Understanding and Avoiding Common Errors Office of Civil Rights January 2014.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Advanced Project Schedule Risk Analysis
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
GENERAL SERVICES DEPARTMENT Risk Management Division Risk Management Information Systems Project Certification - Implementation Phase April 22, 2009.
Integrated Business Statistics Program (IBSP) Introduction Daniela Ravindra Director, Enterprise Statistics Division November 9th, 2010.
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
Working with Wind Energy Stirling: March 2011 Nico Beute 1.
1 FL EDI R3 Test Requirements Rule 69L , F.A.C.
Offshore Wind Floating Foundations the competitive technology
Dave Corbus, Dan Prascher Presentation at the 24 th ASME Wind Energy Symposium January 10-13, 2005 Analysis and Comparison of Test Results from the Small.
Sungmoon Jung, PhD, Florida State University
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Slab Creek Small Hydro Project PI: Scott.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Underwater Active Acoustic Monitoring (AAM) Network for Marine and Hydrokinetic.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
Presentation to 2007 Tidal Energy Conference Ketchikan, AK January 24, 2007 Providing Diversity for Alaska’s Energy Future A New Source of Emission-Free.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Dynamic Response and Control of the Hywind Demo Floating Wind Turbine
An Experimental Investigation on Loading, Performance, and Wake Interactions between Floating VAWTs ____________________________________________ Morteza.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced Anchoring Technology Dallas Meggitt Sound & Sea Technology, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Active Flow Control on Bidirectional Rotors for Tidal MHK Applications C.P. van.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- AWP Alex Fleming: PI Dehlsen.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced, High Power, Next Scale, Wave Energy Conversion Device Dr. Philip R.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Near Space Systems Inc. Small Hydropower Research and Development Technology.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Development of Open, Water-Lubricated Polycrystalline Diamond Thrust Bearings.
Computational Modelling of Unsteady Rotor Effects Duncan McNae – PhD candidate Professor J Michael R Graham.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reedsport PB150 Deployment and Ocean Test Project Dr. Philip R. Hart Ocean Power.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review PB500, 500kW Utility-Scale PowerBuoy Project Dr. Philip R. Hart Ocean Power Technologies.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review THOR’ s Power Method for Hydrokinetic Devices Turner Hunt THOR Energy Group LLC.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Ocean Currents along the United.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Poncelet Kinetics RHK100 Prototype Steven Selvaggio Whitestone Power and Communications.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review An Assessment of Lifecycle Cost in the U.S. over Time Mirko Previsic RE Vision.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reference Model Development Richard Jepsen Sandia National Labs
Evan Gaertner University of Massachusetts, Amherst IGERT Seminar Series October 1st, 2015 Floating Offshore Wind Turbine Aerodynamics.
1 Short introduction of Flumill October Executive summary - Flumill CFD Tank test Tow test Pilot testing at EMEC ѵ ѵ ѵ ѵ Low weight Low cost Easy.
Wind Energy Basics The Kidwind Project
H2020 Proposals LIFES 50 PLUS James Battensby – Technical Bid Manager 23 rd June 2015.
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- MHK Alex Fleming: PI Dehlsen Associates, LLC September 26,11

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Principal Objective of the Aquantis Project –Developing technology to harness the energy resource in the Gulf Stream Primary Challenges –Achieving an acceptable cost of energy –Understanding the resource impact on system performance –Designing a structure that withstands the large hydrodynamic loads –Designing a moored platform with static and dynamic stability –Designing a robust system with 20-year life –Developing a cost-effective installation and maintenance strategy –Determining effective computational and experimental tools –Understanding potential environmental impacts

3 | Wind and Water Power Programeere.energy.gov Technical Approach Key Issues and Methodology –Resource assessment Assess existing Gulf-Stream ADCP data Deploy instrumentation array to acquire better data –Stability, mooring, and anchoring Use unsteady CFD and a rotorcraft code to develop hydrodynamic coefficients Revise a proven Navy coefficient-based simulation tool for to assess platform stability (static and dynamic) Use Orcina marine dynamic analysis software (OrcaFlex) for mooring Determine installation and maintenance strategies –Cost-of-energy model Revise an existing model based on wind power Focus on capital and operational & maintenance (O&M) costs Base all system decisions on cost of energy

4 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule: Initiation date: 10/01/10 Planned completion date: 8/31/13 Contract Award - Effective Date 09/01/ date signed 09/15/2010. Total Contract Cost - $4,005,625 (DOE Funded Costs - $2,400,000; Dehlsen Associates matching funded costs - $1,605,625) – period of performance 09/01/2010 through 08/31/ Conditional award - upon successful completion of negotiations, the conditional status will be lifted. Modification 001 – date signed 08/11/2011 – continued conditional status, added provision 25: NEPA requirements, and added attachments for IP provisions, Statement of Project Objectives, Reporting Requirements, and Budget Information Modification 002 – date signed 09/14/ removed conditional status, extended period of performance to 8/31/2013, changed method of payment to ASAP Reimbursement system Milestones _Go/No-Go : Next Steps Budget: Siting Study for a Hydrokinetic Energy Project Located Offshore Southeast Florida Completion Status Summary of Tasks Task 1. Dynamic Stability and Simulation10% Task 2. Fabrication and Instrumentation 0%- Beginning Nov. 15 th 2011 Task 3Experimental Validation: Tow Tank Test 0 %- Tow Tank Test begins March 15 th 2012 Task 4. Documentation 2% Budget History-MHK FY2010 (10/01/ /30/11)FY2011 (10/01/ /30/12)FY2012 (10/01/ /30/13) DOECost-shareDOECost-shareDOECost-share $243,000$0$1,200,000$800,000$957,000$805,625

5 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Stability, Mooring, and Anchoring –Prepared Top Level Requirements defining system requirements with an emphasis on position control, ease of Aquantis Inspection, Maintenance and Repair (IM&R), cost reduction –Mooring System Analysis using ORCAFLEX Iterative design resulted in preference for two forward semi-taut anchor legs, one rear vertical leg –Developed IM&R methods and scenarios to all development of associated costs

6 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Stability, Mooring, and Anchoring –Static pitch plane stability has been performed for platform configurations utilizing 2 rotors (2.5MW) and 4 rotors (3.2MW) –Static pitch plane stability requires determination of a mooring point(s) in which the hydrostatic forces (in-water weight and buoyancy) of the various major components are balanced about the mooring point to producing zero platform pitch throughout the Gulf Stream current flow range (0 to 2.5 m/s) –Develop target weights and buoyancy values for all major components and establish required locations for center of gravity and center of buoyancy that satisfy pitch plane stability criteria –Investigated various platform net buoyancy-to-drag (rotor thrust) values to obtain mooring line lengths from the platform to ocean floor. Net buoyancy values in the range of 1,100 to 1,800 kN appear to be most practical in terms of providing viable platform structural and cost characteristics. This results in net buoyancy-to-drag ratios in the range of 0.20 to 0.33 at the design current of 1.6 m/s

7 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Stability, Mooring, and Anchoring –Investigated weight, buoyancy and mooring point location for the following platform configurations 2-rotor platform with an airfoil-shaped wing structure above the nacelles and buoyancy pods located aft above the wing to provide static pitch plane stability 2-rotor platform with a high net buoyancy wing structure above the nacelles 4-rotor platform with a simple shaped wing structure located between and on the nacelle centerline 4-rotor platform with a simple shaped wing structure above the nacelles 4-rotor platform with a 3-legged buoyant truss structure with nacelles mounted between truss frame members –Variants on the 4-rotor platform include: 4-rotors mounted down-wind of the support structure (wing or truss) 4-rotors mounted up-wind of the support structure 2-rotors mounted down-wind and 2-rotors mounted up-wind

8 | Wind and Water Power Programeere.energy.gov Challenges to Date Challenge: designing the Aquantis system without full knowledge of the Gulf Stream resourceincluding extreme loads and knowledge of the seafloor properties –Mitigation Approach: acquire new and better resource data Challenge: designing the Aquantis system to maximize the rated power and to minimize the expense of the anchoring –Mitigation Approach: vary the number of turbines, the diameter of the turbines, the number of anchors, and the number of mooring lines –Mitigation Approach: acquire better knowledge of the seabed floor

9 | Wind and Water Power Programeere.energy.gov Challenges to Date Challenge: designing the Aquantis system to achieve the weight and buoyancy characteristicswith proper mooring line attachments and turbine locationsthat allow for stability at all speeds –Mitigation Approach: (1) Use the Navy coefficient-based simulation tool and Orcaflex to evaluate different concepts; and (2) develop a proper small-scale test to measure pitch and yawing moments as a function of angle of attack, and simulate a moored platform in a current

10 | Wind and Water Power Programeere.energy.gov Challenges to Date Challenge: determining the installation, operational, and maintenance costs for the Aquantis System Mitigation Approach: (1)Consideration of IM&R capability early in design spiral (2)Components selection to reduce maintenance requirements (3)Evaluate buy vs lease options for vessels

11 | Wind and Water Power Programeere.energy.gov Next Steps- Milestones Design Milestone Target DateTRLStatus 1. CONCEPTUAL DESIGN May 5-7, 20115Complete 2. FINALIZE CONFIGURATION Sept. 15, PRELIMINARY DESIGN TR1 - Oct. 18 th, BUILD 1:20 SCALE MODEL TR2 - Nov 15 th, TOW TANK TEST OF MODEL TR3 - Mar 15 th, CRITICAL DESIGN REVIEW TR4 - Oct. 15 th, FULL SCALE DRIVE TRAIN TR5 - Nov. 15 th, AT SEA TEST OF MODEL TR6 – Feb. 21 st, BUILD FULL SCALE PROTO TR7 - Mar. 15 th, AT SEA TEST OF FULL SCALE PROTO TR8 - June 21 st, 20147