1 Introduction to Engineering Economy Engineering Economy is about making decisions It is based on the systematic evaluation of the costs and benefits.

Slides:



Advertisements
Similar presentations
Engineering economics
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Chapter 03: Mortgage Loan Foundations: The Time Value of Money
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 06: Mortgages: Additional Concepts, Analysis, and Applications
Time Value of Money Concepts
Job Order Costing Chapter 4.
Flexible Budgets, Variances, and Management Control: II
STATEMENT OF CASH FLOWS
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 11 The Time Value of Money.
Applications of Percents
Baltimore, MD 6/29/04 Presented by: Michael J. Kelly, CHU, RHU Qualified Sick Pay Plan Presentation.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
Mathematics of Compound Interest
Risk, Return, and the Time Value of Money
Time Value of Money.
Copyright © Cengage Learning. All rights reserved.
Teacher instructions:
PSU Study Session Fall 2010 Dan Sprik
Teens 2 lesson ten saving and investing presentation slides 04/09.
Unit 11 Insurance North Carolina Driver and Traffic Safety Education Association 1 INSURANCE UNIT 11.
RISK MANAGEMENT Chapter Nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Key Concepts Understand the key issues related to credit management
1 (of 31) FIN 200: Personal Finance Topic 7-Project and Annuities Lawrence Schrenk, Instructor.
LIFE, FIRE, AND AUTO INSURANCE Chapter Twenty Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Key Concepts Understand different ways interest rates are quoted
Credit Card Traps and PowerPay Debt Reduction Program.
Financial Management Series Number 3 Using Net Present Value To Evaluate The Value of Money Over Time Alan Probst Local Government Specialist Local Government.
Key Concepts and Skills
Break Time Remaining 10:00.
The basics for simulations
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
CHAPTER 10 CREDIT You’re in Charge
World of Credit By: Kunal Jolly. What is Credit? Credit mean that you have an opportunity to use someone elses money to meet your own requirements.
1 Roadmap for Investing Wisely for a Lifetime Leslie Lum Bellevue Community College.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Cost-Volume-Profit Relationships
1 Chapter 6 Buying & Selling a Car Ken Long New River Community College Dublin, VA 24084
MCQ Chapter 07.
Chapter 4: Time Value of Money
The Time Value of Money.
Chapter ChEn 4253 Terry A. Ring
Time Value of Money Time value of money: $1 received today is not the same as $1 received in the future. How do we equate cash flows received or paid at.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Time Value of Money Concepts
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
Present value, annuity, perpetuity
Planning for Profit and Cost Control
Before Between After.
Introduction to Valuation: The Time Value of Money
Building: Knowledge, Security, Confidence Setting Financial Goals FDIC Money Smart for Young Adults.
Chapter 5: Time Value of Money: The Basic Concepts
Static Equilibrium; Elasticity and Fracture
Fundamentals of Cost Analysis for Decision Making
Clock will move after 1 minute
Copyright © 2007 Prentice-Hall. All rights reserved 1 Long-Term Liabilities Chapter 15.
PSSA Preparation.
Ch.11 Shareholders’ Equity
Product Costing in Service and Manufacturing Entities
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Select a time to count down from the clock above
Decision-Making Steps
Key Concepts and Skills
EGN 3615 — Spring 12 ENGINEERING ECONOMICS WITH SOCIAL AND GLOBAL IMPLICATIONS 1.
Introduction to. Sep. 4, 1997 r Engineering economy relates or applies many concepts from economics, mathematics, finance, accounting, statistics, and.
Engineering Economic Analysis - 9th Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 1.
1 Introduction to Engineering Spring 2007 Lecture 10: Engineering Economics.
INTRODUCTION TO ENGINEERING ECONOMY
Presentation transcript:

1 Introduction to Engineering Economy Engineering Economy is about making decisions It is based on the systematic evaluation of the costs and benefits of proposed technical projects The principles and methodology of engineering economy are utilized to analyze alternative uses of financial resources, particularly in relation to the physical assets and the operation of an organization.

2 Example 1: How BD100 a month can grow Year Interest0%1%3%6%9%12% 1BD1,200BD1,206BD1,217BD1,234BD1,251BD1,268 5BD6,000BD6,150BD6,465BD6,977BD7,542BD8,167 10BD12,000BD12,615BD13,974BD16,388BD19,351BD23,004 15BD18,000BD19,411BD22,697BD29,082BD37,841BD49,958 20BD24,000BD26,556BD32,830BD46,204BD66,789BD98,926 25BD30,000BD34,067BD44,601BD69,299BD112,112BD187,885

3 Example 2: When BD12K exceeds BD70K Interest Rate 12% AhmedAli Start Investing Age 20 Annual Investment BD2,000/yr for 6 years (monthly BD166.67) Start Investing Age 26 Annual Investment BD2,000/yr for 35 years (monthly BD166.66) Stop Investing Age 25 Stop Investing Age 60 Total Investment BD12,000BD70,000 Total Accumulation at Age 60 BD1,078,425BD1,014,147

4 Example 3: The Real Cost of a BD1,000 Credit Balance YOU: have a BD1,000 balance on your credit card pay 21.99% interest rate pay the required minimum payment of 2% of the balance or BD10, whichever is greater make no new purchases How much will it take to pay off the credit card? How much will be the total amount you paid? YearMonthBalanceInterest New BalancePayment 00BD1,000BD18.33 BD1, BD BD BD18.29 BD1, BD BD BD18.25 BD1, BD BD BD18.21 BD1, BD BD BD18.18 BD1, BD BD80.06BD1.47BD81.52BD BD71.52BD1.31BD72.83BD BD62.83BD1.15BD63.98BD BD53.98BD0.99BD54.97BD BD44.97BD0.82BD45.80BD BD35.80BD0.66BD36.45BD BD26.45BD0.48BD26.94BD BD16.94BD0.31BD17.25BD BD7.25BD0.13BD BD0.00 Total Payments: BD6,3 45

5 Decision Making and Problem Solving Simple Problems Can be analyzed in ones head without extensive analysis –Do I buy a semester parking pass, use parking meters, or buy a bicycle? –How often should I eat out? Intermediate Problems They are sufficiently important to justify serious thought and action They cant be worked in ones head; must be organized The economic aspects are significant component in the analysis leading to a decision Complex Problems Represent a mixture of economic, political, and humanistic elements –Selection of a president in USA –Building a nuclear power plant (Principle subject of this course!!!)

6 Intermediate Problem Example A student is buying a car, which costs BD12,000. He can borrow money in the bank with a 10% yearly interest rate (quarterly compounding). The dealer offers one of the two promotions: 1.Discount of BD2,000 off the price of the car 2.Financing for one year with interest 0% (4 quarterly payments, BD3,000 each) Which promotion should the student take? (Suppose inflation is 0%.)

7 Intermediate Problem Example Promotion 1 Get BD2,000 and borrow BD12,000 - BD2,000 = BD10,000 with interest 10% BD2,625 (5% more than BD2,500) [?] BD2,658 (6.3% more than BD2,500) [?] BD2,750 (10% more than BD2,500) [?] BD3,000 (20% more than BD2,500) [?] Actual Payment: 4*BD2,658 = BD10,632 car

8 Intermediate Problem Example car BD3,000 Promotion 2: Borrow BD12,000 with interest 0%. Actual Payment: 4*BD3,000 = BD12,000 Conclusion: Select the first promotion!!

9 Engineering Economic Analysis Key Questions: Which engineering projects are worthwhile? Which projects should have higher priority? How the project should be designed? How to achieve long-term financial goals? How to compare different ways to finance purchases? How to make short and long-term financial decisions?

10 Engineering Economic Analysis Examples of Non-Monetary Factors: Meeting customer expectations consistently Maximization of employee satisfaction Maintaining flexibility to meet changing demand Maintenance of a desired public image Leveling cyclic fluctuations in production Improvement of safety in operations Reduction of pollutants

11 Rational Decision Making 1.Recognize the problem –I need a place to live this term. 2.Define the Goal or Objective –Ill find a nice apartment that is not too expensive. 3.Assemble Relevant Data –I need information on rent, utilities, apartment age, parking, driving time to UF, driving time to shopping, the neighborhood, other amenities provided (swimming, table tennis, etc.). 4.Identify Feasible Alternatives –Ill use the Yellow Pages, information from friends, apartment finding services, information from UF, the local newspaper, and my personal experience, to look for apartments.

12 Rational Decision Making 5.Select Criterion to Determine the Best Alternative –Most important is rent plus utilities cost. Im also very concerned about driving time to UF, and the kind of neighborhood the apartment is in. 6.Construct the model –Ill make a spreadsheet. The rows will be the apartment choices, the columns the evaluation criteria. Then Ill try to fill in the interactions between the apartments and the criteria. –This includes determining cash flows for engineering economic analysis!!! 7.Predict Outcomes of Each Alternative –Ill fill in the estimated costs for the spreadsheet and rate the amenities, driving time, etc. 8.Choose the Best Alternative –Apartment C looks cheapest, but I don`t like the neighborhood. If I pay BD50 more per month for Apartment B I get a nicer neighborhood, and a 15-minute drive to UF. Maybe Ill choose Apartment B.

13 Rational Decision Making 9.Audit the Results –Did I make a good choice –After living in Apartment B for six months, I am very happy with my choice! –But this certainly isnt the case every time!!

14 Accident Car Example Bad news – you just wrecked your car! An automobile wholesaler offers you BD2,000 for the car as is. Your insurance company estimates that there is BD2,000 of damage to your car. The insurance company can fix the car right away in a repair shop belonging to this company. Because you have collision insurance with a BD1,000 deductibility provision, the insurance company mails you a check for BD1,000. The odometer reading on your wrecked car is 58,000 miles. Additional Information: You have BD7,000 in savings. You can buy a newer car for BD10,000 with an odometer reading of 28,000 miles. After repairing the wrecked car, it can be sold for BD4,500. A discount repair shop charges BD1,100 and requires 1 month. A car rental for one month is BD400.

15 Wrecked Car Example Alternatives Buy newer car. Sell now, but don`t repair: –Cash flow = BD3,000 - BD10,000 = -BD7,000 Repair now. Sell, and buy the newer car: –Cash flow: = -BD1,000 + BD4,500 - BD10,000 = -BD6,500 Repair at discount shop. Sell and buy the newer car: –Cash flow: = -BD100 + BD4,500 - BD10,000 = -BD5,600 Repair now. Keep your car. –Cash flow: = -BD1,000 Repair at discount shop.Rent a car, then keep your car. –Cash flow: = -BD100 - BD400 = -BD500 NOTE: Dont forget factors such as mileage, repair shop reliability, investment opportunity for your savings et.