CLIC damping rings working plan towards the CDR

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Towards a Coordinated R&D Plan for ILC Damping Rings Impedance Issues Andy Wolski University of Liverpool and the Cockcroft Institute 28 September, 2006.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Damping Rings Y. Papaphilippou, CERN, D. Rubin, Cornell.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
ALCW at SLAC, January 7, 2004J. Rogers, A Damping Ring Primer1 A Damping Ring Primer J. Rogers Cornell University Linear collider emittance requirements.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
An ultra-low emittance lattices for Iranian Light Source Facility storage ring Esmaeil Ahmadi On behalf of beam dynamics group Iranian Light Source Facility.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Emittances Normalised r.m.s. Emittances at Damping Ring Extraction Horizontal Emittance (  m) Vertical Emittance (  m)
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Supervisors: Roger Rassool Mark Boland Ioannis Papaphilippou CLIC – ACAS Collaboration Damping Ring Studies Kent Wootton 12 th April 2011.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
CESR-c Plans for CESR (or Life Without CLEO) Mark A. Palmer David L. Rubin Second ILC Accelerator Workshop August 18, 2005.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Long Term Plans at MAX IV
ILC DR Lower Horizontal Emittance, preliminary study
J. Alexander + Cornell accelerator group Cornell University
Test of Optical Stochastic Cooling in CESR
Space charge studies at the SPS
Low Emittance Rings 2014 Workshop
CLIC Damping ring beam transfer systems
Test of Optical Stochastic Cooling in CESR
Summary of Workshop on Low Emittance Rings 2010
ILC DR Lower Horizontal Emittance? -2
Mark Palmer Co-Convener CLIC-ILC Damping Ring Working Group
CLIC damping rings overview
Recent Electron Cloud Studies at CESR and Future Plans
Update of Damping Ring parameters
Yannis PAPAPHILIPPOU CERN
Follow-up on Damping Ring design
LER 2010 Overview (and other)
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
CLIC damping rings overview and open issues
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CLIC damping rings overview and open issues
CLIC’08 workshop summary concerning damping rings
Status of CTC activities for the Damping rings
Proposal for a CESR Damping Ring Test Facility
Kicker and RF systems for Damping Rings
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
Kicker specifications for Damping Rings
Damping ring activities
JLEIC Ion Integration Goals
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Error Sensitivity in MEIC
Presentation transcript:

CLIC damping rings working plan towards the CDR Yannis Papaphilippou March, 12th 2009

Working packages Basic lattice design Linear imperfections and correction Non-linear dynamics and correction Injection and extraction Super-conducting wiggler design Magnet systems Collective effects (including IBS) Vacuum systems RF systems Instrumentation Power system System integration and parameters 12/03/2009 CLIC DR meeting

Damping ring energy Evaluate the energy impact of the damping rings Numerical tools Lattice design and non-linear dynamics Impedance estimation Participate in common experiments at test facilities IBS experiments @ CESR-TA Low emittance tuning @ SLS Resonance analysis @ ATF, CESR-TA, Light Sources Communication Organize a workshop (winter 2009-2010) Document common work in a working group report 12/03/2009 CLIC DR meeting

Basic lattice design Linear optics optimization including IBS Working point and tunability Chromaticity correction and DA with sextupoles PDR optics optimization including DA Geometrical aperture for DR and PDR Magnet specifications for DR and PDR May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Linear imperfections Orbit, coupling and vertical dispersion correction (low emittance tuning) Gradient and optics correction Tolerances for magnet alignment and linear imperfections Correction systems for PDR and rough tolerances Corrector magnet parameters May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Non-liner dynamics Non-linear imperfections and DA Non-linear correction systems (sextupole, octupoles) Error specifications for magnets Effect of wigglers and tolerances    May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Injection-Extraction Injection and extraction optics and concept for DR and PDR Injection and extraction elements specifications and tolerances Conceptual design of kicker and septa May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Injection-Extraction Injection and extraction optics and concept for DR and PDR Injection and extraction elements specifications and tolerances Conceptual design of kicker and septa May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Injection-Extraction Injection and extraction optics and concept for DR and PDR Injection and extraction elements specifications and tolerances Conceptual design of kicker and septa May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Super-conducting wiggler design NbTi prototype work, including measurements Nb3Sn prototype work, including magnet models, mechanical design and measurements Radiation absorptions scheme and mechanical design May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Magnetic modeling of main magnets, including field quality Magnet systems Magnetic modeling of main magnets, including field quality Corrector modeling   WP7. Collective effects E-cloud and fast ion instability evaluation for final lattice design Instabilities (transverse and longitudinal) Space charge Impedance evaluation for key components (absorbers, collimators, wiggler chambers, BPMs…) Coherent synchrotron radiation Intrabeam scattering for non-Gaussian distributions Vacuum specifications Feedback systems WP8. Vacuum systems Chamber coatings and experimental program for e-cloud mitigation (ESRF, CESR-TA) Preliminary chamber mechanical design Vacuum quality (pumps) WP9. RF system Conceptual design of RF system Evaluation of longitudinal instabilities (HOM) Longitudinal impedances Design of the PDR RF system WP10. Instrumentation List of instruments for DR and PDR with required resolution, accuracy and stability Ideas for the most critical items (e.g. turn-by-turn beam profile monitors) WP11. Power systems Inventory of needed power supplies and parameters for PDR and DR WP12. Survey and stabilization Alignment tolerances and stabilization issues WP13. DR and PDR coordination DR and PDR parameter consistency and design strategy Design of PDR/DR for 500 GeV parameters Systems integration and layout Power consumption and costing CLIC-ILC collaboration for DRs May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Collective effects E-cloud and fast ion instability evaluation for final lattice design Instabilities (transverse and longitudinal) Space charge Impedance evaluation for key components (absorbers, collimators, wiggler chambers, BPMs…) Coherent synchrotron radiation Intrabeam scattering for non-Gaussian distributions Vacuum specifications Feedback systems May 09 April 09 September 09 12/03/2009 CLIC DR meeting

Vacuum systems Chamber coatings and experimental program for e-cloud mitigation (ESRF, CESR-TA) Preliminary chamber mechanical design Vacuum quality (pumps) May 09 April 09 September 09 12/03/2009 CLIC DR meeting

RF system Conceptual design of RF system Evaluation of longitudinal instabilities (HOM) Longitudinal impedances Design of the PDR RF system   WP10. Instrumentation List of instruments for DR and PDR with required resolution, accuracy and stability Ideas for the most critical items (e.g. turn-by-turn beam profile monitors) WP11. Power systems Inventory of needed power supplies and parameters for PDR and DR WP12. Survey and stabilization Alignment tolerances and stabilization issues WP13. DR and PDR coordination DR and PDR parameter consistency and design strategy Design of PDR/DR for 500 GeV parameters Systems integration and layout Power consumption and costing CLIC-ILC collaboration for DRs May 09 April 09 September 09 12/03/2009 CLIC DR meeting

RF system Conceptual design of RF system Evaluation of longitudinal instabilities (HOM) Longitudinal impedances Design of the PDR RF system  issues   May 09 April 09 September 09 12/03/2009 CLIC DR meeting

CLIC @ 500GeV Evaluate the energy impact of the damping rings Numerical tools Lattice design and non-linear dynamics Impedance estimation Participate in common experiments at test facilities IBS experiments @ CESR-TA Low emittance tuning @ SLS Resonance analysis @ ATF, CESR-TA, Light Sources Communication Organize a workshop (winter 2009-2010) Document common work in a working group report 12/03/2009 CLIC DR meeting