PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Ensure a safety briefing is given where appropriate
No Removal of cellar frames by hands
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Never place yourself in line of fire
Maintain 3 point contact when you climb Ladder
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
PDO Second Alert Date: Incident type: LTI What happened?
Ensure loads are secured as per SP 2001 Factsheets
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Always stay out of the line of fire
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
PDO Second Alert Photo explaining what was done wrong
Photo explaining what was done wrong
Safety Critical Devices can Save the Lives & Protect Asset
Pay attention to your footing
Unsecured pup joint falling
Crane operating with boom lowered and under Supervision
PDO Incident First Alert - Galfar
PDO Second Alert Date: Incident: LTI What happened?
PDO Second Alert Use Hands Free Lifting Aids What happened?
Keep your hands in a safe position
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always assess the risks, Stop and think.
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
PDO Second Alert Date: Incident title: MVI Rollover
PDO Second Alert What happened? Your learning from this incident..
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Vehicles to Keep Safe Distance at all times
Always position the crane boom correctly before slinging the casing
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

If in doubt – stop the job PDO Second Alert Date: 20.07.17 Incident Type: LTI What happened? On Thursday 20th July 2017 during unloading of steel rebar bundle using a crane, a steel fixer was assisting a rigger on the bed of a trailer, which was at about 1.5 m off the ground. The steel fixer was placing wooden skids below the steel rebar bundle to create space for inserting the lifting gear. After the lifting gear had been inserted and while the load was being lifted, an 8mm binding rod used for securing the bundle snapped off, resulting in a sudden, loud noise. The loud noise startled the steel fixer and he panicked and jumped from the trailer bed. He landed heavily on the ground on his right hand, which resulted in a fracture to his right wrist. Your learning from this incident. Ensure materials are correctly stacking to allow for safe loading and unloading Ensure you have received the appropriate training for any task you are asked to perform Carry out a proper tool box talk and ensure you are aware of the hazards involved in the task   Photo explaining how it should be done right  If in doubt – stop the job

Management self audit Date: 08.05.17 Incident Type: LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below: Confirm the following: Do you have a robust system to manage subcontractors? Do you follow the Ten Point Checklist in assessing the subcontractors prior to engaging them? Do you have a plan to ensure a system to deploy adequate resources for doing the job? Do you ensure your subcontractors comply with Oman Labour Law especially regarding employees welfares? Do you brief the workforce about emergency response, including the actions to take for medical emergencies? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.