LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
S.Thomas College Gurutalawa OLD BOYS ASSOCIATION 2008/09 JUNIOR DORMITORY TOILET PROJECT.
Disassemble, Assemble and Perform a Function Check on the M249
Module Reading Plans and Elevations
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
ABC Technology Project
6/12/ DFS ABU DHABI STAFF ACCOMODATION.
Center for Activity Theory and Developmental Work Research Using Activity Theory to Help Teachers Redesign their Practice Yrjö Engeström University.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
. Fire Prevention 12 . What will burn? NO FIRE 15% 13.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
St John’s Fareham 23 rd October and 8 th November
Slippery Slope
Januar MDMDFSSMDMDFSSS
Week 1.
Ongoing Detector Issues A continuous investigation into the potential causes and possible solutions to the issue of high degrees of saturation being recorded.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Presentation transcript:

LS1 & Buildings 115, 507 and 601

Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed by the users All electrical cabinets and distribution have been removed (recuperated) Tourniquet has been removed and is stored for later use in 508 (Nino Rama) Preparation finishing for the desamiantage – treatment of the asbestos parts in roof and floor 2

Desamiantage Bat 601 finished 3

Building 115 Power has been cut and disconnected (Patrick Gallay EL) All items (Solid State Lab) have been removed by the users – checked by RP Workshop machines have gone into storage All electrical cabinets and distribution have been removed (recuperated) Airco units have been recuperated (users) Remaining the fiber optics connection: To be disconnected (after desamiantage) De-classification (Class C) done by RP (Alexandre Dorsival, Christelle Saury, Matthieu Deschamps) – paperwork to be finished Gas bottles in the gas point to be removed

Packing, thanks to the diligent in-house teams 5

Empty building 115 6

Packing workshop 7

8 Desamiantage Bat 115 finished

Building 507: Power has been cut and disconnected (Patrick Gallay EL) All items (Laser Labs) have been removed by the users – checked by RP All electrical cabinets and distribution have been removed (recuperated) Signal cabling to be pulled back into the hall for later use in the new 508 (Georgie Georgiev EL) (unfortunately some signal cables got unforeseen cut from the Collaps Lab side) Water has been cut upstream (Isolde water station) but there is a leak on the valve – to be changed before demolishing starts De-classification (Class C) will start 9

Recuperation: electrical cabinets and power outlets 10

Signal patch panels in 507 to be removed & recuperated. Cables will be pulled back into the hall to be reused in 508 (ongoing): 11

New access stairs have been put in place to replace the ladder. 12

Access: Temporary access by card reader on the hall 170 door has been put in place (with buzzer 10 min) (Nino Rama & team) – ok with RP Existing staircase from Rue Democrite will be re-used during work on the site. Fencing in place to separate access site from construction site Building 170: New access stairs have been put in place to replace the ladder. They will give safe and easier access to the to be installed barrack on the 170 roof for released air measurements (Daniel Parchet) 13

New Access during Building works 14

New Access Access via old existing staircase (leaves and fence have been removed now). Access area blocked off from work site. Card reader on the Isolde hall door: 15

Situation 16

Situation with respect old buildings 17 Bottom Floor: 450 m2 Top Floor: 250 m2

18 Bulding 508 / Bottom Floor I Chemical lab Chemical store PAC 66 m2 SSP Laser Labora tory COLLAPS CONTROL ROOM COLLAPS LASER LAB Access ISOLDE Hall Classified C

19 Bulding 508 / Bottom Floor II Access to the public Workshop 26 m2 Vibrations Isolated Diffusion Meas. Emisssion Channelin g CRIS LASER LAB CRIS LASER Control Room Detector Laboratory

Building 508 / part I 20 View to the ISOLDE Hall VISITORS ROOM 68 m2 Office 19 m2 Office 19 m2

21 Building 508 / part II Toilets men Toilets Women Kitchen 19 m2 DAQ Room 28 m2

Planning Asbestos: Desamiantage of bat 601 and 115 finished 5 July 2013 Inspection of buildings: VIC next week Demolition: 14th July – 5th of August Drains and water networks: 5th August – 31st of August Concret Ground : September – Mid-October Mounting Modules : November MISSING for 2014: Electricity Water Air conditioning Optical fiber Computer network 22

Planning 23